WORK PHASING AND POWER OUTAGE NOTES:

1. THE CONTRACTOR SHALL PERFORM PRIMARY CONNECTIONS UNDER A POWER OUTAGE. THE CONTRACTOR SHALL

COORDINATE ALL PRIMARY POWER OUTAGES WITH THE CONTRACTING OFFICER AND HURLBURT FIELD EXTERIOR

ELECTRIC DEPARTMENT 2 WEEKS IN ADVANCE. POWER OUTAGES OUTSIDE OF THE 30 DAY WINDOW DESCRIBED IN

NOTE 3 SHALL BE LIMITED TO NO MORE THAN 4 HOURS. PRIMARY CONNECTIONS ARE

ANTICIPATED TO BE MADE DURING THE 30 DAY WINDOW, PRELIMINARILY SCHEDULED TO OCCUR IN JUNE 2019.

2. THE CONTRACTOR SHALL PERFORM NEW SECONDARY CONNECTIONS TO EXISTING EQUIPMENT AND FEEDERS

UNDER A POWER OUTAGE. THE CONTRACTOR SHALL COORDINATE ALL POWER OUTAGES WITH THE CONTRACTING

OFFICER AND HURLBURT FIELD INTERIOR ELECTRIC DEPARTMENT 2 WEEKS IN ADVANCE.

POWER OUTAGES OUTSIDE OF THE 30 DAY WINDOW DESCRIBED IN NOTE 3 SHALL BE LIMITED TO NO MORE

THAN 4 HOURS.

3. THE CONTRACTOR WILL BE ALLOWED TO CUT POWER TO THE BUILDING DURING A 30 DAY PERIOD FROM

MID-JUNE 2019 TO MID-JULY 2019. THIS IS TO ALLOW THE CONTRACTOR TO REMOVE THE EXISTING SUBSTATIONS

AND INSTALL THE NEW SWITCHBOARDS ON THE PYLONS. THE CONTRACTOR SHALL SCHEDULE ANY MAJOR POWER

OUTAGES TO OCCUR DURING THE 30 DAYS. THE CONTRACTOR MAY WORK IN SHIFTS, ON NIGHTS AND WEEKENDS

TO ACCOMPLISH THE WORK IN THESE 30 DAYS. THE CONTRACTOR SHALL PROVIDE ELECTRIC POWER, TEMPORARY COOLING AND LIGHTING AS DETAILED IN THE CONTRACT DOCUMENTS. THE BUILDING WILL BE

VACATED IN THE BAYS AND AREAS WITHOUT THIS POWER. THE CONTRACTOR MAY USE GENERATORS OR

TEMPORARY TRANSFORMERS AS REQUIRED. THE CONTRACTORS TEMPORARY POWER PLAN MUST BE

SUBMITTED WITHIN 30 DAYS AFTER NTP FOR GOVERNMENT APPROVAL.

4. FOLLOWING IS A GENERAL DESCRIPTION OF THE Tl MELINE FOR THIS CONTRACT, AND IS NOT INTENDED TO

BIND THE CONTRACTOR TO ANY SPECIFIC ORDER OF WORK:

A. BID IS AWARDED.

B. CONTRACTOR SUBMITS SHOP DRAWINGS.

C. SHOP DRAWINGS ARE APPROVED.

D. CONTRACTOR ORDERS MATERIALS AND DELIVERS SHORT LEAD ITEMS TO THE SITE. CONTRACTOR NOTIFIES

THE CONTRACTING OFFICER AS TO WHEN THE LONG LEAD ITEMS ARE ANTICIPATED TO ARRIVE ON THE JOB

SITE.

E. CONTRACTOR BEGINS INSTALLATION OF NEW EQUIPMENT, CONDUIT SYSTEMS, AND OTHER WORK THAT DOES

NOT INTERFERE WITH THE USER'S NORMAL MISSIONS OR REQUIRE POWER OUTAGES EXCEEDING 4 HOURS.

F. DURING THE 30 DAY WINDOW THE CONTRACTOR WILL MAKE PRIMARY CONNECTIONS, DEMOLISH THE EXISTING

SUBSTATIONS, ETC., AND INSTALL THE NEW SWITCHBOARDS, TRANSFORMERS, ETC.

G. THE 30 DAY WINDOW ENDS AND THE CONTRACTOR COMPLETES THE REMAINING CONSTRUCTION ITEMS THAT

DO NOT INTERFERE WITH THE USER'S NORMAL MISSIONS OR REQUIRE MAJOR POWER OUTAGES EXCEEDING 4

HOURS.

5. WHEN THE 30 DAY WINDOW IS OVER THE BUILDING OCCUPANTS RESUME THEIR WORK IN THIS FACILITY, THE NEW ELECTRICAL SERVICES MUST BE ENERGIZED AND THE BUILDING MUST BE FUNCTIONAL FOR THE

NORMAL OPERATIONS THAT OCCUR IN THE FACILITY.

6. THE CONTRACTOR WILL BE PROVIDED A STAGING AREA IN THE GRASS ON THE FLIGHTLINE

SIDE OF THE HANGAR.

7. CONTRACTOR PERSONNEL WILL BE REQUIRED TO OBTAIN FLIGHTLINE DRIVING LICENSES

FROM THE GOVERNMENT. TRAINING WILL BE PROVIDED BY THE GOVERNMENT.

SECURITY POLICE

CONTRACTING

UPGRADE ELECTRICAL SERVICE

HANGAR 90700

HURLBURT FIELD, FLORIDA

FTEV 14-1057

D

D

D

B ILDI

COMMERCIAL VEHICL

INSPECTION GATE

BACK GATE

SHEET#

T-1

E-1

E-2

E-3

E-4

E-5

E-6

E-7

E-8

E-9

E-10

E-11

E-12

E-13

E-14

E-15

E-16

E-17

S-1

INDEX OF DRAWINGS

TITLE

LOCATION MAP & INDEX OF DRAWINGS

ELECTRICAL SITE PLAN

ELECTRICAL PLAN - HANGAR 90700 - DEMOLITION

ELECTRICAL PLANS - PYLONS - DEMOLITION

ELECTRICAL PLAN - HANGAR 90700 - NEW WORK

ELECTRICAL PLANS - PYLONS - NEW WORK

SINGLE LINE DIAGRAMS

PANELBOARD ELEVATIONS - NORTH PYLON

PANELBOARD ELEVATIONS - NORTH PYLON

SWITCHBOARD "T1" ELEVATION

SWITCHBOARD "LC3" ELEVATION

PANELBOARD ELEVATIONS - SOUTH PYLON

SWITCHBOARD "T3" ELEVATION

SWITCHBOARD "T4" ELEVATION

MAIN SWITCHBOARD "MSB-N" ELEVATION

MAIN SWITCHBOARD "MSB-S" ELEVATION

PRIMARY RISER DIAGRAMS

PRIMARY EQUIPMENT DETAILS

TOPOGRAPHIC SURVEY

LOCATION MAP

1 SOCES/CECC OFFICE FORM 001 (JAN 96)

STANDARD D LAYOUT (24" X 36")

N N.T.S.

C b..

C

0..

w w z ci z w iw

:i: '0 w

0:::

w

V>o

...JO

<( I"--oo

- (J) 0:::

I- 0:::

O <( W e., .....Jz w

WI

0:::

c., n...

C ...J z -:E o:E �o z ci z ...I z

LL

z z I-

_J z 0a:

U) a: c( We W-z a:

-oCl _J

(1)0

Z LL

w -' C wen

- _J :? w oz (.) ii:

U) I-

C: 0 z a:

Q::::, o- - Ill

LL� !:;;: _J

a: a:

w:::>

C: C:

D. ::c:

-w _J

<( a. c( w D.

U)

DATE:

1 APRIL 2015

DESIGNED BY:

EWW/JRH

DRAWN BY:

JRH

BUILDING NO.:

90700

DRAWING NO.:

FTEV 14-1057

SHEET REF.:

T-1

SHEET NO.:

/2

5/

U pd at ed

N ot es

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E U

G E

U G

E

U G

E

U G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U G

E

U

G

E

U G

E

U G

E

U G

E

U

G

E

U

G

E

U

G

E

UGE

UGE

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

PJC

PJC

PJC

PJC

PJC

PS

PJC

PS

PMT

ELECTRICAL SITE PLAN

SCALE: 1" = 60'-0"

PJC

PJC

PJC

PJC

PJC

PJC

PMT

PMT

PMT

PMT

PMT

PMT

90225

T U

L L Y

S

T R

E E

T

90700

90708

90705

90707

90720

90228

90714

90713

90716

90717

90718

90702

90701

90703

90711

90710

B

E

N

N

E

A

V

E

N

U

E

90712

E

U

P

E

U

P

PJC

PMT

D B

PMT

PJC

PS

U

P

U

S

E

U

P

WORK NOTES:

BREAK INTO EXISTING CONCRETE ENCASED DUCTBANK & INTERCEPT ONE (1) 5" SPARE DUCT. TURN 5" DUCT UP INTO NEW

PRIMARY JUNCTION CABINET & PULL IN NEW PRIMARY CONDUCTORS FROM EXISTING PAD MOUNTED PRIMARY SWITCH TO NEW

JUNCTION CABINET.

INSTALL TWO (2) 4" HIGH DENSITY POLYETHYLENE DUCTS BELOW EXISTING CONCRETE AIRCRAFT APRON BY DIRECTIONAL BORE METHOD.

INSTALL NEW PAD MOUNTED PRIMARY SWITCH.

INSTALL TWO-WAY 4" CONCRETE ENCASED PRIMARY DUCTBANK FROM PRIMARY SWITCH TO PAD MOUNTED TRANSFORMER.

INSTALL NEW PAD MOUNTED TRANSFORMER.

EXTEND NEW UNDERGROUND SECONDARY FROM TRANSFORMER TO NEW MAIN SWITCHBOARD "MSB-S" IN SOUTH LEAN-TO. CUT

& PATCH EXISTING ASPHALT PAVING FOR INSTALLATION OF SECONDARY.

REMOVE EXISTING UNDERGROUND PRIMARY CONDUCTORS AFTER NEW SERVICE IS ENERGIZED.

REMOVE EXISTING PRIMARY JUNCTION CABINET AFTER NEW SERVICE IS ENERGIZED & TURN OVER TO GOVERNMENT.

REMOVE EXISTING PRIMARY JUNCTION CABINET & TURN OVER TO GOVERNMENT. INSTALL NEW JUNCTION CABINET ON EXISTING

CONCRETE PAD.

INSTALL TWO (2) 5" HIGH DENSITY POLYETHYLENE DUCTS BELOW EXISTING STREET BY DIRECTIONAL BORE METHOD.

EXTEND NEW UNDERGROUND SECONDARY FROM TRANSFORMER TO NEW MAIN SWITCHBOARD "MSB-N" IN NORTH LEAN-TO. CUT

& PATCH EXISTING ASPHALT PAVING FOR INSTALLATION OF SECONDARY.

REMOVE EXISTING MANHOLE. TURN MANHOLE COVER OVER TO GOVERNMENT. FILL HOLE WITH APPROVED FILL DIRT.

PJC

PMT

PS

DB

UP

US

EUP

PJC

PS

EXISTING PRIMARY JUNCTION CABINET - TO REMAIN, UNLESS NOTED OTHERWISE.

NEW PRIMARY JUNCTION CABINET - SEE DETAILS, SHEET E-17.

NEW PAD MOUNTED TRANSFORMER - SEE DETAILS, SHEET E-17.

EXISTING PRIMARY SWITCH - TO REMAIN.

EXTERIOR ELECTRICAL LEGEND:

NEW PRIMARY SWITCH - SEE DETAILS, SHEET E-17.

EXISTING UNDERGROUND PRIMARY - TO REMAIN.

EXISTING UNDERGROUND PRIMARY - REMOVE.

NEW UNDERGROUND PRIMARY - DIRECTIONAL BORE.

NEW UNDERGROUND PRIMARY - CONCRETE ENCASED DUCTBANK.

NEW UNDERGROUND SECONDARY.

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S S

S S

S S

S S

S S

S

S

S

S

S

S

S

S

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

U

G

E

U

G

E

U

G

E

D

B

U

S

NOTE:

EXISTING UTILITIES ARE SHOWN FOR COORDINATION PURPOSES ONLY. OTHER BURIED

UTILITIES MAY EXIST IN THIS AREA. THE CONTRACTOR SHALL OBTAIN A DIG PERMIT AND

HAVE UTILITY LOCATION SERVICES PERFORMED PRIOR TO ANY EXCAVATION IN THIS AREA.

NOTE:

EXISTING UTILITIES ARE SHOWN ON SHEET S-1 FOR THIS AREA. THE CONTRACTOR SHALL

OBTAIN A DIG PERMIT AND HAVE UTILITY LOCATION SERVICES PERFORMED PRIOR TO ANY

EXCAVATION IN THIS AREA.

UGE

W W

G G

SD SD

SS SS

T T

EXISTING STREET LIGHT - TO REMAIN.

EXISTING UNDERGROUND ELECTRICAL LINE - TO REMAIN.

EXISTING WATER VALVE - TO REMAIN.

EXISTING FIRE HYDRANT - TO REMAIN.

EXISTING UNDERGROUND WATER LINE - TO REMAIN.

EXISTING GAS VALVE - TO REMAIN.

EXISTING UNDERGROUND GAS LINE - TO REMAIN.

EXISTING STORM DRAIN MANHOLE - TO REMAIN.

EXISTING STORM DRAIN INLET - TO REMAIN.

EXISTING UNDERGROUND STORM DRAIN LINE - TO REMAIN.

EXISTING UNDERGROUND SANITARY SEWER LINE - TO REMAIN.

EXISTING UNDERGROUND TELEPHONE LINE - TO REMAIN.

E-1

E L

E C

T R

I C

I T

E

P

L A

N

90700

U P

G R

A D

E

E

L E

C T

R I C

E R

V I C

E

H A

N G

R

OF

FTEV 14-1057

JRH

EWW/JRH

1 APRIL 2015

SCALE: 1/16" = 1'-0"

ELECTRICAL PLAN - HANGAR 90700 - DEMOLITION

SEE "ELECTRICAL PLANS - SOUTH PYLON - DEMOLITION,"

SHEET E-3 FOR DEMOLITION WORK IN THIS AREA.

SEE "ELECTRICAL PLANS - NORTH PYLON - DEMOLITION,"

SHEET E-3 FOR DEMOLITION WORK IN THIS AREA.

REMOVE (3) EXISTING 1200 A., 15 KV PRIMARY VACUUM CIRCUIT

BREAKERS & OUTDOOR METALCLAD SWITCHGEAR ENCLOSURE

AFTER NEW SERVICE HAS BEEN ENERGIZED. REMOVE EXISTING

METER & TURN OVER TO GOVERNMENT.

EXISTING MOTOR CONTROL CENTER - TO REMAIN.

P

P

REMOVE EXISTING EXPOSED PRIMARY CONDUIT & WIRING

REMOVE EXISTING PULL BOX

P

REMOVE EXISTING PRIMARY WIRING FROM

CONCEALED CONDUIT BACK TO EXISTING PRIMARY

VACUUM BREAKER. ABANDON EXISTING

CONCEALED CONDUIT.

GENERAL NOTES:

1. CONTRACTOR SHALL TURN OVER THE FOLLOWING ITEMS TO THE HURLBURT INTERIOR ELECTRIC SHOP

AFTER DEMOLITION IS COMPLETE:

CIRCUIT BREAKERS, FUSES, SWITCHBOARD AND PANELBOARD LUGS, CONDUIT BUSHINGS, LB FITTINGS

AND CONDUIT NIPPLES.

2. ALL EQUIPMENT NOT LISTED IN GENERAL NOTE 1 SHALL BE DISPOSED OF BY THE CONTRACTOR. THE

CONTRACTOR SHALL COMPLY WITH WASTE GENERATION, COLLECTION AND DISPOSAL AS SPECIFIED IN

THE HURLBURT FIELD HAZARDOUS WASTE MANAGEMENT PLAN.

P

EXISTING PANEL TO REMAIN

TIRE SHOP

REMOVE EXISTING FEEDER BACK TO DISCONNECT

SWITCH ON SIDE OF SUBSTATION "T3." SEE

"ELECTRICAL PLAN - MEZZANINE - SOUTH PYLON -

DEMOLITION," SHEET E-3, FOR CONTINUATION.

REMOVE EXISTING EXPOSED PRIMARY CONDUIT & WIRING

REMOVE EXISTING EXPOSED CONDUIT & WIRING.

REMOVE EXISTING "LB" FITTING.

REMOVE EXISTING CONDUIT & WIRING CONCEALED

ABOVE LAY-IN CEILING.

ELECTRICAL LEGEND - DEMOLITION:

P

S

S

S

EXISTING PANELBOARD - TO REMAIN.

EXISTING PANELBOARD - REMOVE.

EXISTING SECONDARY CONDUIT & WIRING - REMOVE.

EXISTING PRIMARY CONDUIT & WIRING - REMOVE, AS NOTED.

SEE "LARGE SCALE PLAN - DEMOLITION," THIS

SHEET, FOR DEMOLITION WORK IN THIS AREA.

SCALE: 1/8" = 1'-0"

LARGE SCALE PLAN - DEMOLITION

EXSTING PANEL "MP" TO REMAIN

REMOVE EXISTING 30 A. RECEPTACLE.

REMOVE EXISTING DUPLEX RECEPTACLE.

REMOVE EXISTING 200 A. RECEPTACLE.

REMOVE EXISTING CONDUIT & WIRING BACK TO

EXISTING PANEL "MP." TURN BREAKERS OFF &

LABEL AS SPARE.

REMOVE EXISTING COMPRESSED AIR DROP AND

PIPING TO A POINT BEYOND THE FOOTPRINT OF THE

NEW SWITCHBOARD. CAP EXISTING PIPE.

E-2

E L

E C

T R

I C

P

A

N

H

A N

G A

R

D

E M

O L

I T

I O

N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

SCALE: 1/8" = 1'-0"

ELECTRICAL PLAN - MEZZANINE - SOUTH PYLON - DEMOLITION

SCALE: 1/8" = 1'-0"

ELECTRICAL PLAN - MEZZANINE - NORTH PYLON - DEMOLITION

P

P

P

S

EXISTING UNIT SUBSTATION "T3"

REMOVE EXISTING PRIMARY SWITCH

REMOVE EXISTING SECONDARY DISTRIBUTION SECTION

EXISTING UNIT SUBSTATION "T4"

REMOVE EXISTING PRIMARY SWITCH

REMOVE EXISTING SECONDARY DISTRIBUTION SECTION

REMOVE EXISTING PULL BOX.

REMOVE EXISTING PRIMARY WIRING & ABANDON CONCEALED CONDUIT.

REMOVE EXISTING DISCONNECT SWITCH

EXISTING SECONDARY FEEDER EXITS BOTTOM OF DISTRIBUTION SECTION.

S

S

S

S

P

REMOVE EXISTING PRIMARY WIRING FROM

CONCEALED CONDUIT BACK TO EXISTING PRIMARY

VACUUM BREAKER. ABANDON EXISTING PRIMARY

CONDUIT WHERE CONCEALED.

EXISTING UNIT SUBSTATION "T1"

REMOVE EXISTING PRIMARY SWITCH

REMOVE EXISTING SECONDARY DISTRIBUTION SECTION

REMOVE EXISTING DISCONNECT SWITCH

S

S

S

P

P

S

REMOVE EXISTING 500 KVA, 12.47 KV PRIMARY TO

480Y/277 V. SECONDARY DRY-TYPE TRANSFORMER

REMOVE EXISTING 225 KVA, 12.47 KV PRIMARY TO

480Y/277 V. SECONDARY DRY-TYPE TRANSFORMER

REMOVE EXISTING SECONDARY CONDUIT & WIRING FROM

DISCONNECT SWITCH TO EXISTING PANEL IN TIRE SHOP

ON FIRST FLOOR.

REMOVE EXISTING 225 KVA, 12.47 KV PRIMARY TO

208Y/120 V. SECONDARY DRY-TYPE TRANSFORMER

REMOVE EXISTING PRIMARY EXPOSED CONDUIT &

WIRING BACK TO EXISTING PRIMARY VACUUM BREAKER.

EXISTING UNIT SUBSTATION "LC1"

REMOVE EXISTING PRIMARY SWITCH

REMOVE EXISTING SECONDARY DISTRIBUTION SECTION

REMOVE EXISTING 500 KVA, 12.47 KV PRIMARY TO

480Y/277 V. SECONDARY DRY-TYPE TRANSFORMER

EXISTING UNIT SUBSTATION "LC3"

REMOVE EXISTING PRIMARY SWITCH

REMOVE EXISTING SECONDARY MAIN SWITCH SECTION

REMOVE EXISTING 500 KVA, 12.47 KV PRIMARY TO

208Y/120 V. SECONDARY DRY-TYPE TRANSFORMER

REMOVE EXISTING SECONDARY DISTRIBUTION SECTION

REMOVE EXISTING PRIMARY CONDUIT & WIRING

REMOVE EXISTING PRIMARY CONDUIT & WIRING

SCALE: 1/8" = 1'-0"

ELECTRICAL PLAN - 2ND FLOOR - SOUTH PYLON - DEMOLITION

SCALE: 1/8" = 1'-0"

ELECTRICAL PLAN - 2ND FLOOR - NORTH PYLON - DEMOLITION

EXISTING PANEL "P1B" TO REMAIN

EXISTING PANEL "L6" TO REMAIN

EXISTING PANEL PP1 TO REMAIN

EXISTING PANELS TO REMAIN

REMOVE EXISTING FUSIBLE PANEL "S3"

REMOVE EXISTING FUSIBLE PANEL "S2"

REMOVE EXISTING FUSIBLE PANEL "P1A"

REMOVE EXISTING FUSIBLE PANEL "S1"

REMOVE EXISTING FUSIBLE LIGHTING PANEL # 1

REMOVE EXISTING FUSIBLE POWER PANEL # 1, SECTION 1

REMOVE EXISTING FUSIBLE POWER PANEL # 1, SECTION 2

EXISTING POWER PANEL P1 TO REMAIN

EXISTING SECONDARY FEEDER EXITS BOTTOM OF DISTRIBUTION SECTION

AND SERVES THE EXISTING MOTOR CONTROL CENTER ON THE FIRST FLOOR.

REMOVE EXISTING WIRING AND ABANDON EXISTING CONDUITS IN PLACE.

REMOVE EXISTING HANDRAIL SYSTEM AT EXISTING COUPLINGS AND

LOWER EXISTING SUBSTATION SECTIONS TO THE HANGAR FLOOR

THROUGH OPENING IN HANDRAIL. REINSTALL HANDRAIL AND COUPLINGS

AFTER WORK IS COMPLETE.

REMOVE EXISTING HANDRAIL SYSTEM AND LOWER EXISTING SUBSTATION SECTIONS

TO THE HANGAR FLOOR THROUGH OPENING IN HANDRAIL. CUT EXISTING STEEL

PIPES TO CREATE OPENING IN HANDRAIL SYSTEM. INSTALL COUPLINGS TO

RECONNECT THE EXISTING HANDRAIL PIPES AFTER WORK IS COMPLETE.

S

REMOVE EXISTING PULL BOX.

P

REMOVE EXISTING PRIMARY CONDUIT & WIRING.

REMOVE EXISTING PRIMARY WIRING & ABANDON CONCEALED CONDUIT.

S

S

S

S

EXISTING SECONDARY CONDUIT &

WIRING TO REMAIN (TYP.)

S

S

S

E-3

E L

E C

T R

I C

A

N

Y L

O N

S

D

E M

O L

I T

I O

N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

SCALE: 1/16" = 1'-0"

ELECTRICAL PLAN - HANGAR 90700 - NEW WORK

SEE "ELECTRICAL PLANS - SOUTH PYLON - NEW WORK,"

SHEET E-5 FOR NEW WORK IN THIS AREA.

SEE "ELECTRICAL PLANS - NORTH PYLON - NEW

WORK," SHEET E-5 FOR NEW WORK IN THIS AREA.

US

NEW MAIN SWITCHBOARD "MSB-N"

"MSB-N" MAIN BREAKER SECTION

"MSB-N" DISTRIBUTION SECTION

NEW MAIN SWITCHBOARD "MSB-S"

U

S

"MSB-S" MAIN BREAKER SECTION

"MSB-S" DISTRIBUTION SECTION

EXISTING MOTOR CONTROL

CENTER - TO REMAIN.

EXTEND UNDERGROUND

SECONDARY TO NEW PAD

MOUNTED TRANSFORMER.

EXTEND UNDERGROUND

SECONDARY TO NEW PAD

MOUNTED TRANSFORMER.

NEW PANEL "TS"

EXISTING PANEL

EXTEND NEW FEEDER TO SWITCHBOARD

"T3." SEE "ELECTRICAL PLAN - MEZZANINE -

SOUTH PYLON - NEW WORK," SHEET E-5,

FOR CONTINUATION.

EXTEND NEW FEEDER TO SWITCHBOARD

"T1." SEE "ELECTRICAL PLAN - MEZZANINE -

NORTH PYLON - NEW WORK," SHEET E-5,

FOR CONTINUATION.

EXTEND NEW FEEDER TO SWITCHBOARD

"T3." SEE "ELECTRICAL PLAN - MEZZANINE -

SOUTH PYLON - NEW WORK," SHEET E-5,

FOR CONTINUATION.

RUN CONDUITS CONCEALED

ABOVE LAY-IN CEILING

RUN CONDUITS EXPOSED

ON STRUCTURE

RUN CONDUITS EXPOSED

ON STRUCTURE

RUN CONDUITS EXPOSED

HIGH ON HANGAR WALL

PULL BOX - 48" HIGH X 36"

WIDE X 16" DEEP, NEMA 1

W/ SCREW COVER.

EXISTING HANGAR DOOR PANEL "HD-NW"

EXISTING HANGAR DOOR PANEL "HD-NE"EXISTING HANGAR DOOR PANEL "HD-SE"

EXISTING HANGAR DOOR PANEL "HD-SW"

"LB" FITTING

PULL BOX - 12" HIGH X 18"

WIDE X 6" DEEP, NEMA 1 W/

SCREW COVER.

PULL BOX - 12" HIGH X 18"

WIDE X 6" DEEP, NEMA 1

W/ SCREW COVER.

PULL BOX - 12" HIGH X 18"

WIDE X 6" DEEP, NEMA 1

W/ SCREW COVER.

PULL BOX - 12" HIGH X 18" WIDE X 6"

DEEP, NEMA 1 W/ SCREW COVER.

RUN CONDUIT EXPOSED

HIGH ON HANGAR WALL

RUN CONDUIT EXPOSED

HIGH ON HANGAR WALL

RUN CONDUIT SERVING PANEL "TS" EXPOSED

ON HANGAR WALL JUST ABOVE FIRST FLOOR

CEILING LEVEL

RUN CONDUIT EXPOSED

HIGH ON HANGAR WALL

SEE "LARGE SCALE PLAN -

SWITCHBOARD 'MSB-N',"

SHEET E-8, FOR ADDITIONAL

WORK IN THIS AREA.

SEE "LARGE SCALE PLAN - SWITCHBOARD 'MSB-S',"

SHEET E-13, FOR ADDITIONAL WORK IN THIS AREA.

PULL BOX - 48" HIGH X 36" WIDE X 16" DEEP,

NEMA 1 W/ SCREW COVER - LOCATE ABOVE

OFFICE ROOF.

ELECTRICAL LEGEND - NEW WORK:

EXISTING PANELBOARD - TO REMAIN.

NEW PANELBOARD.

EXISTING SECONDARY CONDUIT & WIRING - TO REMAIN & BE RECONNECTED.

NEW SECONDARY CONDUIT & WIRING.

S

T

NEW DRY-TYPE TRANSFORMER.

FLEXIBLE CONDUIT & WIRING CONNECTION - LIQUIDTIGHT FLEXIBLE METAL CONDUIT.

RUN CONDUIT EXPOSED

HIGH ON HANGAR WALL

E-4

E L

E C

T R

I C

A

N

H

A N

G A

R

W

O R

K

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

SCALE: 1/8" = 1'-0"

ELECTRICAL PLAN - MEZZANINE - SOUTH PYLON - NEW WORK

SCALE: 1/8" = 1'-0"

ELECTRICAL PLAN - MEZZANINE - NORTH PYLON - NEW WORK

NEW SWITCHBOARD "T3"

NEW SWITCHBOARD "T4"

S

S

S

S

NEW SWITCHBOARD "T1"

NEW SWITCHBOARD "LC3"

T

NEW DISTRIBUTION SECTION

NEW MAIN BREAKER SECTION

T

NEW DISTRIBUTION SECTION

NEW MAIN BREAKER SECTION

INSTALL NEW FEEDER TO NEW PANEL "TS." SEE

"ELECTRICAL PLAN - HANGAR 90700 - NEW WORK,"

SHEET E-4, FOR CONTINUATION.

NEW 300 KVA, 3Ø DRY-TYPE TRANSFORMER -

480 V. PRIMARY TO 208Y/120 V. SECONDARY.

NEW 500 KVA, 3Ø DRY-TYPE TRANSFORMER -

480 V. PRIMARY TO 208Y/120 V. SECONDARY.

SCALE: 1/8" = 1'-0"

ELECTRICAL PLAN - 2ND FLOOR - SOUTH PYLON - NEW WORK

SCALE: 1/8" = 1'-0"

ELECTRICAL PLAN - 2ND FLOOR - NORTH PYLON - NEW WORK

INSTALL NEW PANEL "LDP1"

INSTALL NEW PANEL "PDP1"

EXISTING POWER PANEL P1 TO REMAIN

EXISTING PANEL "P1B" TO REMAIN

EXISTING PANEL "L6" TO REMAIN

INSTALL NEW PANEL "P1A"

EXISTING PANEL PP1 TO REMAIN

INSTALL NEW PANEL "S3"

EXISTING SECONDARY CONDUIT &

WIRING TO REMAIN (TYP.)

EXISTING PANELS TO REMAIN

INSTALL NEW PANEL "S1"

EXISTING SECONDARY FEEDER EXITS BOTTOM OF DISTRIBUTION SECTION.

RECONNECT TO NEW CIRCUIT BREAKER IN SWITCHBOARD.

INSTALL NEW FEEDER TO NEW MAIN SWITCHBOARD

"MSB-S." SEE "ELECTRICAL PLAN - HANGAR 90700 -

NEW WORK," SHEET E-4, FOR CONTINUATION.

INSTALL NEW FEEDER TO NEW MAIN SWITCHBOARD

"MSB-N." SEE "ELECTRICAL PLAN - HANGAR 90700 -

NEW WORK," SHEET E-4, FOR CONTINUATION.

S

S

S S

S

S

S

S

S

S

S

USE OPENING IN HANDRAIL TO GET NEW SWITCHBOARD

SECTIONS TO THE MEZZANINE. INSTALL COUPLINGS TO

RECONNECT THE EXISTING HANDRAIL PIPES AFTER

WORK IS COMPLETE.

USE OPENING IN HANDRAIL TO GET NEW SWITCHBOARD

SECTIONS TO THE MEZZANINE. INSTALL COUPLINGS TO

RECONNECT THE EXISTING HANDRAIL PIPES AFTER

WORK IS COMPLETE.

THE CONTRACTOR SHALL ATTACH NEW CONDUITS TO EXISTING

STRUCTURE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL

CODE. CONDUITS ABOVE PYLONS MAY BE ATTACHED TO EXISTING

BAR JOISTS, OR THE CONTRACTOR MAY SUSPEND A GALVANIZED

STEEL CHANNEL SYSTEM BELOW THE EXISTING ROOF STRUCTURE

TO SUPPORT THE NEW RUNS OF CONDUIT.

NOTE:

E-5

E L

E C

T R

I C

A

Y L

O N

S

N

R

K

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

SINGLE LINE DIAGRAM - NORTH SERVICE

US

KWH METER

M

SEE PAD MOUNT TRANSFORMER

DETAILS, SHEET E-17.

UP

T

SINGLE LINE DIAGRAM - SOUTH SERVICE

US

M

A

SEE PAD MOUNT TRANSFORMER

DETAILS, SHEET E-17.

T

PAD MOUNT TRANSFORMER -

1000 KVA, 3Ø, 12.47 KV PRIMARY

TO 480Y/277 V. SECONDARY.

PAD MOUNT TRANSFORMER -

1500 KVA, 3Ø, 12.47 KV PRIMARY

TO 480Y/277 V. SECONDARY.

G

F P

M A

B

E

A K

E R

A

V

G

F P

M A

E

A K

E R

SWITCHBOARD "T1" SWITCHBOARD "LC3"

SWITCHBOARD "MSB-N" EXISTING MOTOR CONTROL CENTER

A

A

500 KVA, 3Ø DRY-TYPE TRANSFORMER - 480 V.

PRIMARY TO 208Y/120 V. SECONDARY.

A

300 KVA, 3Ø DRY-TYPE TRANSFORMER - 480 V.

PRIMARY TO 208Y/120 V. SECONDARY.

SWITCHBOARD "MSB-S"

SWITCHBOARD "T3" SWITCHBOARD "T4"

KWH METER

MEZZANINE

EXISTING 800 A., 3 P.

ENCLOSED MAIN BREAKER

MOUNTED ON MOTOR

CONTROL CENTER.

A

M A

E

A K

E R

A

A

M A

E

A K

E R

NO SCALE

SINGLE LINE DIAGRAM

WEATHERPROOF

"LB" FITTINGS

CORE DRILL EXISTING

WALL & GROUT

AROUND CONDUITS

8 CKTS. IN PARALLEL OF 4 - 600 MCM IN

4" PVC, SCH. 40 CONDUIT, EACH.

CONVERT PVC

CONDUITS TO RIGID

GALV. STEEL

BELOW GRADE.

EXTERIOR WALL

EXTERIOR WALL

WEATHERPROOF

"LB" FITTINGS

CORE DRILL EXISTING

WALL & GROUT

AROUND CONDUITS

VOLTMETER

AMMETER

V

VOLTMETER

AMMETER

V

VOLTMETER

AMMETER

V

VOLTMETER

AMMETER

2 CKTS. IN PARALLEL OF 4 - 500 MCM & 1 # 1/0

GND. IN 4" RIGID GALV. STEEL CONDUIT, EACH.

EXISTING

PANEL

"HD-NW"

EXISTING

PANEL

"HD-NE"

FIRST FLOOR

4" CONCRETE PAD

4" CONCRETE PAD

100 A., 3 P., 35 KAIC ENCLOSED CIRCUIT

BREAKER. PROVIDE PHENOLIC NAMEPLATE

INDICATING HANGAR DOOR PANEL SERVED.

100 A., 3 P., 35 KAIC, NEMA 3R ENCLOSED

CIRCUIT BREAKER. PROVIDE PHENOLIC

NAMEPLATE INDICATING HANGAR DOOR

PANEL SERVED.

4 # 2/0 & 1 # 6 GND. -

2" RIGID GALV.

STEEL CONDUIT

6 CKTS. IN PARALLEL OF 4 - 500 MCM IN

3 1/2" PVC, SCH. 40 CONDUIT, EACH.

CONVERT PVC

CONDUITS TO RIGID

GALV. STEEL

BELOW GRADE.

PANEL

"TS"

EXISTING

PANEL

EXISTING

PANEL

"HD-SW"

EXISTING

PANEL

"HD-SE"

PANEL

"PDP-1"

A

A

A

4 CKTS. IN PARALLEL OF 4 - 600 MCM & 1 - 250 MCM

GND. IN 4" RIGID GALV. STEEL CONDUIT, EACH.

2 CKTS. IN PARALLEL OF 4 - 250 MCM & 1 # 3 GND.

IN 3" RIGID GALV. STEEL CONDUIT, EACH.

4 # 4/0 & 1 # 4 GND. - 3" EMT TO

225 A., 3 P. BKR. IN PANEL "TS."

2 CKTS. IN PARALLEL OF 3 - 250 MCM & 1 # 2 GND.

IN 2 1/2" RIGID GALV. STEEL CONDUIT, EACH.

4 - 600 MCM & 1 # 3 GND. - EXISTING 4" C.

4 CKTS. IN PARALLEL OF 4 - 350 MCM & 1 # 3/0

GND. IN 3" RIGID GALV. STEEL CONDUIT, EACH.

A

PANEL

"LDP-1"

4 - 500 MCM & 1 # 3 GND. - EXISTING 4" C.

SECOND FLOOR

6 CKTS. IN PARALLEL OF 4 - 600 MCM & 1 - 350 MCM

GND. IN 4" RIGID GALV. STEEL CONDUIT, EACH.

2 CKTS. IN PARALLEL OF 3 - 500 MCM & 1 # 1/0

GND. IN 4" RIGID GALV. STEEL CONDUIT, EACH.

6 CKTS. IN PARALLEL OF 4 - 500 MCM & 1 # 250 MCM

GND. IN 4" RIGID GALV. STEEL CONDUIT, EACH.

A

PANEL

"P1A"

4 - 500 MCM & 1 # 3 GND. - EXISTING 4" C.

SECOND FLOOR

MEZZANINE

FIRST FLOOR

PANEL

"S3"

A

2 CKTS. IN PARALLEL OF 4 - 350 MCM &

1 # 1 GND. IN EXISTING 4" CONDUITS

A

PANEL

"S1"

4 - 600 MCM & 1 # 3 GND. - EXISTING 4" C.

# 3/0 COPPER - 1" PVC, SCH. 40 TO 3/4" X 20'-0" COPPERCLAD

GROUND ROD. # 3/0 COPPER - 1" PVC, SCH. 40 TO BUILDING STEEL. #

3/0 COPPER - 1" PVC, SCH. 40 TO METALLIC COLD WATER PIPE. # 3/0

COPPER - 1" PVC, SCH. 40 TO EXISTING COUNTERPOISE.

# 2/0 COPPER - 3/4" C. TO BUILDING STEEL

# 1/0 COPPER - 3/4" C. TO BUILDING STEEL

3 # 2 COPPER (15 KV) TYPE "EPR" W/ 1/3

CONCENTRIC NEUTRAL IN TWO-WAY 4" CONC.

ENCASED DUCT BANK - SEE DETAIL, SHEET E-17.

UP

PULL BOX - SEE "ELECTRICAL PLAN -

HANGAR 90700 - NEW WORK," SHEET

E-4, FOR SIZE AND LOCATION.

PULL BOX - SEE "ELECTRICAL PLAN -

HANGAR 90700 - NEW WORK," SHEET

E-4, FOR SIZE AND LOCATION.

3 # 2 COPPER (15 KV) TYPE "EPR" W/ 1/3

CONCENTRIC NEUTRAL IN TWO-WAY 4" CONC.

ENCASED DUCT BANK - SEE DETAIL, SHEET E-17.

10 KV LIGHTNING ARRESTER - BOND TO

TRANSFORMER GROUND CONNECTION.

SEE PAD MOUNT TRANSFORMER

DETAILS, SHEET E-17.

10 KV LIGHTNING ARRESTER - BOND TO

TRANSFORMER GROUND CONNECTION.

# 3/0 COPPER - 1" PVC, SCH. 40 TO 3/4" X 20'-0" COPPERCLAD

GROUND ROD. # 3/0 COPPER - 1" PVC, SCH. 40 TO BUILDING STEEL. #

3/0 COPPER - 1" PVC, SCH. 40 TO METALLIC COLD WATER PIPE. # 3/0

COPPER - 1" PVC, SCH. 40 TO EXISTING COUNTERPOISE.

4 # 2/0 & 1 # 6 GND. - 2" RIGID

GALV. STEEL CONDUIT.

4 # 2/0 & 1 # 6 GND. - 2" RIGID

GALV. STEEL CONDUIT

4 # 2/0 & 1 # 6

GND. - 2" EMT

4 # 2/0 & 1 # 4 GND. - 2" RIGID

GALV. STEEL CONDUIT.

4 # 2/0 & 1 # 4 GND. - 2" RIGID

GALV. STEEL CONDUIT.

E-6

S I N

G L

E

L

I N

E

D

I A

G R

A M

S

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

PANEL "S1"

AMP

BREAKER

PANELBOARD SCHEDULE

SPARE

SPACE ONLY

SPACE ONLY

300 3

12 300

AMP

SPACE ONLY

SPACE ONLY

EXISTING PANEL PP1

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

125 3 1

POLE

BREAKER

2 100

CKT. #

EXISTING LOAD

EXISTING MD-4

SPACE ONLY

SPACE ONLY

SURFACE MOUNTED PANEL W/ GROUND BUS

POLE A

ISOLATED FROM NEUTRAL BUS.

LOAD (AMPS)

B C

SPACE ONLY

SPACE ONLY

SPARE

LOAD SERVED

25 KAIC INTERRUPTING RATING480Y/277 V., 3Ø, 4 W.

400 A. M.L.O. (TOP MTD.)

EXISTING LOAD

ELEVATION - PANEL "S3"

2'-4 1/2"

KEY NOTES - PANEL "S3"

N.T.S.

EXISTING PANEL TO BE REMOVED AND REPLACED.

2 NEW PANELBOARD "S3" - APPROXIMATE DIMENSIONS OF NEW BOX SHALL BE 26" W. X 6.5" D. X 83" H.

RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR BID

PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.

INSTALL COUPLINGS AND EXTEND NEW CONDUITS ON EXISTING FEEDER FROM SWITCHBOARD "LC3." PULL IN NEW WIRING AS

SHOWN ON "SINGLE LINE DIAGRAM." FOR BID PURPOSES, ASSUME THAT EXISTING CONDUITS ARE 4" RIGID GALV. STEEL.

AMP

BREAKER

PANELBOARD SCHEDULE

SPACE ONLY

SPACE ONLY

100 3

AMP

PANEL "S3"

SPACE ONLY

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

125 3 1

POLE

BREAKER

CKT. #

SPACE ONLY

SPACE ONLY

POLE A

LOAD (AMPS)

B C

SPARE

SPARE

LOAD SERVED

208Y/120 V., 3Ø, 4 W.

600 A. M.L.O. (TOP MTD.)

22 KAIC INTERRUPTING RATING SURFACE MOUNTED PANEL W/ GROUND BUS

ISOLATED FROM NEUTRAL BUS.

EXISTING FLOOR

RECEPTACLE

EXISTING FLOOR

RECEPTACLE

EXISTING WALL

RECEPTACLE

EXISTING WALL

RECEPTACLE

EXISTING PANEL L3

EXISTING PANEL L6

EXISTING PANEL L4

4 INSTALL COUPLING AND EXTEND NEW CONDUIT TO NEW PANEL. RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER.

FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.

2'-2"

5'-1 1/2"

3'-6"

ELEVATION - PANEL "S1"

N.T.S.

KEY NOTES - PANEL "S1"

EXISTING PANEL TO BE REMOVED AND REPLACED. EXISTING PANEL HAS TWO INTERIORS INSTALLED IN ONE ENCLOSURE.

2 NEW PANELBOARD "S1" - APPROXIMATE DIMENSIONS OF NEW BOX SHALL BE 42" W. X 9.5" D. X 86" H.

RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR

BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.

INSTALL COUPLING AND EXTEND NEW CONDUIT ON EXISTING FEEDER FROM SWITCHBOARD "T1." PULL IN NEW WIRING AS

SHOWN ON "SINGLE LINE DIAGRAM." FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.

RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR

BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.

4 5 4

PANELBOARD NOTE:

PHYSICAL SIZE OF NEW PANELBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE PANELBOARD REPLACEMENT. OTHER

SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING CONDUCTORS WILL REACH NEW CIRCUIT

BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE ADJUSTED WITHIN THE PANELBOARD TO ENSURE THAT

THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT TERMINATIONS ON NEW PANELBOARD WILL BE PROVIDED WITH

GROUNDING BUSHINGS.

PANELBOARD NOTE:

PHYSICAL SIZE OF NEW PANELBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE PANELBOARD REPLACEMENT.

OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING CONDUCTORS WILL REACH

NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE ADJUSTED WITHIN THE

PANELBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT TERMINATIONS ON NEW

PANELBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.

EXISTING

FLOOR SLAB

EXISTING

FLOOR SLAB

CIRCUIT BREAKER NOTE:

EXISTING FUSE SIZES HAVE BEEN VERIFIED IN THE EXISTING FUSIBLE PANELBOARDS ONLY WHERE EXISTING FUSIBLE

SWITCH DOORS COULD BE OPENED WHILE THE SWITCH WAS ENERGIZED. FUSE SIZES HAVE NOT BEEN VERIFIED WHERE

THE SWITCH DOORS COULD NOT BE OPENED. THE CONTRACTOR SHALL SCHEDULE A POWER OUTAGE PRIOR TO

ORDERING THE NEW REPLACEMENT CIRCUIT BREAKER PANELBOARDS SO THAT ALL FUSIBLE SWITCH DOORS CAN BE

OPENED AND ALL FUSES SIZES CAN BE VERIFIED. THE CONTRACTOR SHALL PROVIDE NEW CIRCUIT BREAKERS IN THE

NEW PANELBOARDS WHICH ARE SIZED TO MATCH THE EXISTING FUSE SIZES. THE AS BUILT DRAWINGS PROVIDED AT

THE END OF CONSTRUCTION SHALL REFLECT THE EXACT CIRCUIT BREAKER SIZES.

E-7

P A

N E

L B

O A

E

V A

T I O

O R

H

L

O N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

PANEL "P1A"

BREAKER

PANELBOARD SCHEDULE

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

AMP

SPARE

SPACE ONLY

EXISTING PANEL P1B

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

125 3 1

POLE

BREAKER

CKT. #

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SURFACE MOUNTED PANEL W/ GROUND BUS

POLE A

ISOLATED FROM NEUTRAL BUS.

LOAD (AMPS)

B C

SPARE

SPACE ONLY

SPARE

LOAD SERVED

22 KAIC INTERRUPTING RATING208Y/120 V., 3Ø, 4 W.

400 A. M.L.O. (TOP MTD.)

EXISTING

FLOOR SLAB

2'-4 1/2"

2'-2"

KEY NOTES - PANEL "P1A"

EXISTING PANEL TO BE REMOVED AND REPLACED.

RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR

BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.

REUSE EXISTING COUPLING AND EXTEND NEW CONDUIT ON EXISTING FEEDER FROM SWITCHBOARD "LC3." PULL IN NEW

WIRING AS SHOWN ON "SINGLE LINE DIAGRAM." FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.

PANELBOARD NOTE:

PHYSICAL SIZE OF NEW PANELBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE PANELBOARD REPLACEMENT.

OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING CONDUCTORS WILL REACH

NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE ADJUSTED WITHIN THE

PANELBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT TERMINATIONS ON NEW

PANELBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.

ELEVATION - PANEL "P1A"

N.T.S.

NEW PANELBOARD "P1A" - APPROXIMATE DIMENSIONS OF NEW BOX SHALL BE 26" W. X 6.5" D. X 83" H.

LARGE SCALE PLAN - SWITCHBOARD "MSB-N"

SCALE: 1/4" = 1'-0"

NEW 4" HIGH CONCRETE PAD -

EXTEND 6" MINIMUM BEYOND

EDGES OF NEW SWITCHBOARD.

NEW SWITCHBOARD "MSB-N"

IN OUTDOOR ENCLOSURE.

F A

B R

C

D

6'-0" MAXIMUM

6"

M

I N

10" MIN. DIA.

CONCRETE BASE

TOP RAIL

LINE POST

HOG RINGS (TYP.)

FABRIC

TENSION BAR

CARRIAGE BOLT

FABRIC

NO SCALE

DETAIL - CHAIN-LINK FENCE

LINE POST ATTACHMENTS

TOP RAIL ATTACHMENT

9-GAGE STEEL TIE WIRES

(2'-0" O.C. MAX.)

TENSION BAND (15" O.C. MAX. AND

WITHIN 4" FROM TOP AND BOTTOM

OF FABRIC)

TENSION BAR TO ENGAGE

EACH FABRIC LINK

CHAIN-LINK FABRIC (9 GAGE,

2" MESH)

END OR GATE POST DETAIL

CORNER, END, OR

PULL POST

TIE WIRES OR

CLIPS (TYP.)

TENSION WIRE

9-GAGE STEEL TIE

WIRE (15" O.C. MAX.

AND WITHIN 4" FROM

TOP AND BOTTOM

OF FABRIC)

FENCE NOTES:

1. WIRE TIES, RAILS AND POSTS SHALL BE CONSTRUCTED ON THE SWITCHBOARD SIDE OF THE FENCE

ALIGNMENT. CHAIN-LINK FABRIC SHALL BE PLACED ON THE SIDE OPPOSITE THE SWITCHBOARD AREA.

2. CORNER, END & PULL POSTS SHALL BE 2.875" O.D. MINIMUM.

3. LINE POSTS SHALL BE 2.375" O.D. MINIMUM.

4. TOP RAILS SHALL BE 1.66" O.D. MINIMUM.

1" ±

EXISTING CONCRETE FLOOR

CORE DRILL EXISTING CONCRETE

SLAB FOR POST INSTALLATIONS

CONSTRUCT NEW CHAIN LINK FENCE -

SEE DETAILS, THIS SHEET.

TWO 3'-0" WIDE CHAIN LINKE FENCE

GATES W/ PAD LOCKING PROVISIONS

12'-0"

ENCLOSED CIRCUIT BREAKERS FOR

HANGAR DOOR PANELS. SEE

"SINGLE LINE DIAGRAM," SHEET E-6.

CIRCUIT BREAKER NOTE:

EXISTING FUSE SIZES HAVE BEEN VERIFIED IN THE EXISTING FUSIBLE PANELBOARDS ONLY WHERE EXISTING FUSIBLE

SWITCH DOORS COULD BE OPENED WHILE THE SWITCH WAS ENERGIZED. FUSE SIZES HAVE NOT BEEN VERIFIED WHERE

THE SWITCH DOORS COULD NOT BE OPENED. THE CONTRACTOR SHALL SCHEDULE A POWER OUTAGE PRIOR TO

ORDERING THE NEW REPLACEMENT CIRCUIT BREAKER PANELBOARDS SO THAT ALL FUSIBLE SWITCH DOORS CAN BE

OPENED AND ALL FUSES SIZES CAN BE VERIFIED. THE CONTRACTOR SHALL PROVIDE NEW CIRCUIT BREAKERS IN THE

NEW PANELBOARDS WHICH ARE SIZED TO MATCH THE EXISTING FUSE SIZES. THE AS BUILT DRAWINGS PROVIDED AT

THE END OF CONSTRUCTION SHALL REFLECT THE EXACT CIRCUIT BREAKER SIZES.

E-8

P A

N E

L B

O A

E

V A

T I O

O R

L

O N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

BREAKER

SWITCHBOARD SCHEDULE

SPACE ONLY

EXISTING HOIST

AMP

SWITCHBOARD "T1"

EXISTING PANEL HN

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

400 3 1

POLE

BREAKER

CKT. #

SPACE ONLY

EXISTING PANEL

POLE A

LOAD (AMPS)

B C

EXISTING PANEL P-7

EXISTING PANEL P-2

LOAD SERVED

35 KAIC INTERRUPTING RATING

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

EXISTING DISTRIBUTION

PANEL S1

EXISTING PANEL P-9

SPACE ONLY

30 200

480Y/277 V., 3Ø, 4 W.

2000 A. MAIN LUGS ONLY

FREE STANDING FRONT AND REAR

ACCESSIBLE SWITCHBOARD W/ GROUND

BUS ISOLATED FROM NEUTRAL BUS.

KEY NOTES - SWITCHBOARD "T1"

3'-0"

ELEVATION - SWITCHBOARD "T1"

N.T.S.

400 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 1

SPACE ONLY

225 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 3

225 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 4

225 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 5

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 6

30 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 7

800 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 22

SWITCHBOARD DEPTH SHALL BE 48"

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 8

15 16

17 18

19 20

3 3SPACE ONLY SPACE ONLY

3 3SPACE ONLY SPACE ONLY

3 3SPACE ONLY SPACE ONLY

SPACE ONLY

SWITCHBOARD "LC3"

EXISTING

FLOOR SLAB

SWITCHBOARD NOTE:

PHYSICAL SIZE OF NEW SWITCHBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE SWITCHBOARD

REPLACEMENT. OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING

CONDUCTORS WILL REACH NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE

ADJUSTED WITHIN THE SWITCHBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT

TERMINATIONS ON NEW SWITCHBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.

RECONNECT EXISTING CONDUIT TO NEW SWITCHBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR

BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.

INSTALL 12" X 12" X 8" DEEP PULL BOX W/ SCREW COVER ON EXISTING CONDUIT AND EXTEND NEW CONDUIT NIPPLE FROM PULL

BOX TO NEW SWITCHBOARD. SPLICE EXISTING WIRING TO NEW WIRING W/ BUTT-TYPE COMPRESSION SPLICES& HEAT SHRINK

INSULATION AND EXTEND TO NEW CIRCUIT BREAKER. EXISTING CIRCUIT IS 4 # 3/0 & 1 # 2 GND. - 2" RIGID GALV. STEEL CONDUIT.

NEW PARALLEL FEEDER TO SWITCHBOARD "T1" FROM SWITCHBOARD "MSB-N" ON FIRST FLOOR.

E-9

S W

I T

C H

B O

A R

D

T

E

L E

V A

T I O

N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

SWITCHBOARD SCHEDULE

EXISTING PANEL L-1

200 3

200 3

AMP

SWITCHBOARD "LC3"

SPARE

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

200 3 1

POLE

BREAKER

CKT. #

EXISTING PANEL P-6

EXISTING PANEL P1A

POLE A

LOAD (AMPS)

B C

EXISTING PANEL P-8

EXISTING PANEL S3

LOAD SERVED

208Y/120 V., 3Ø, 4 W.

2000 A., 3 P. MAIN BREAKER

65 KAIC INTERRUPTING RATING FREE STANDING FRONT AND REAR ALIGNED,

FRONT AND REAR ACCESSIBLE SWITCHBOARD

W/ GROUND BUS BONDED TO NEUTRAL BUS.

EXISTING PANEL P-10

EXISTING LOAD

SPARE

EXISTING LOAD

EXISTING PANEL P-3

SPACE ONLY

EXISTING PANEL P-5

EXISTING DISTRIBUTION

PANEL # 2

153100 16 3EXISTING PANEL ME2 SPACE ONLY

400 400

KEY NOTES - SWITCHBOARD "LC3"

SWITCHBOARD "LC3" MAIN BREAKER SECTION

2'-6" 3'-0"

ELEVATION - SWITCHBOARD "LC3"

N.T.S.

2000 A., 3 P. MAIN BREAKER

SWITCHBOARD "LC3" DISTRIBUTION SECTION

SURGE PROTECTIVE DEVICE

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 1

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 2

SPACE ONLY, CIRCUIT # 3

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 4

300 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 5

600 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 6

400 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 7

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 9

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 10

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 11

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 12

50 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 13

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 14

100 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 15

20 SPACE ONLY

SWITCHBOARD DEPTH SHALL BE 48" FOR MAIN

BREAKER SECTION AND DISTRIBUTION SECTION.

5 6

400 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 8

13 14

17 18

17 18

19 20

3 SPACE ONLY

2 SPACE ONLY

3SPACE ONLY

2SPACE ONLY

EXISTING

FLOOR SLAB

21 RECONNECT EXISTING CONDUIT TO NEW SWITCHBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT

BREAKER. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.

21 21

SWITCHBOARD NOTE:

PHYSICAL SIZE OF NEW SWITCHBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE SWITCHBOARD

REPLACEMENT. OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING

CONDUCTORS WILL REACH NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE

ADJUSTED WITHIN THE SWITCHBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT

TERMINATIONS ON NEW SWITCHBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.

METERING COMPARTMENT

SURGE PROTECTIVE DEVICE NOTE:

SURGE PROTECTIVE DEVICES (SPD) SHALL BE LISTED IN ACCORDANCE W/ UL 1449, 3RD EDITION AND SHALL BE A

TYPE 1 DEVICE. SPD SHALL PROVIDE PROTECTION OF LINE-NEUTRAL, LINE-GROUND, NEUTRAL-GROUND AND

LINE-LINE. EACH MODE OF PROTECTION SHALL BE FUSED W/ 200 KAIC SURGE RATED FUSES. SPD SHALL BE

FURNISHED W/ AN AUDIBLE ALARM, AN ALARM ON/OFF SWITCH AND AN ALARM PUSH TO TEST SWITCH. MINIMUM

SHORT CIRCUIT CURRENT RATING SHALL BE 200kA. MINIMUM SURGE CURRENT RATING PER PHASE SHALL BE

300kA. VOLTAGE PROTECTION RATINGS SHALL BE 700 VOLTS FOR LINE-NEUTRAL, LINE-GROUND AND

NEUTRAL-GROUND. VOLTAGE PROTECTION RATING SHALL BE 1200 VOLTS FOR LINE-LINE. SPD SHALL HAVE A

MINIMUM EMI/RFI FILTERING OF -50dB AT 100kHz WITH AN INSERTION RATIO OF 50:1 USING MIL-STD-220A

METHODOLOGY. SPD SHALL BE PROVIDED WITH ONE SET OF NO/NC CONTACTS, AND SHALL HAVE A FULL 10 YEAR

WARRANTY. SPD SHALL HAVE A NEMA 1 ENCLOSURE FOR INDOOR APPLICATIONS.

22 NEW PARALLEL FEEDER FROM DRY-TYPE TRANSFORMER.

E-10

S W

I T

C H

B O

A R

D

L

C

E

L E

V A

T I O

N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

PANEL "LDP-1"

BREAKER

PANELBOARD SCHEDULE

EXISTING PANEL L13

SPACE ONLY

SPACE ONLY

100 3

12 100

AMP

SPARE

EXISTING PANEL L1

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

1 1

POLE

BREAKER

2 200

CKT. #

SPARE

SPARE

SPACE ONLY

SPACE ONLY

SURFACE MOUNTED PANEL W/ GROUND BUS

POLE A

ISOLATED FROM NEUTRAL BUS.

LOAD (AMPS)

B C

SPACE ONLY

SPACE ONLY

LOAD SERVED

22 KAIC INTERRUPTING RATING208Y/120 V., 3Ø, 4 W.

400 A. M.L.O. (TOP MTD.)

EXISTING PANEL L2

EXISTING OUTLET - C130

TECH OFFICE

2SPACE ONLY

EXISTING LOAD 20

ELEVATION - PANEL "LDP-1"

N.T.S.

KEY NOTES - PANEL "LDP-1"

EXISTING PANEL TO BE REMOVED AND REPLACED.

RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR

BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.

INSTALL COUPLING AND EXTEND NEW CONDUIT ON EXISTING PARALLEL FEEDER FROM SWITCHBOARD "T4." PULL IN NEW

WIRING AS SHOWN ON "SINGLE LINE DIAGRAM." FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.

RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR

BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 3/4" RIGID GALV. STEEL.

PANELBOARD NOTE:

PHYSICAL SIZE OF NEW PANELBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE PANELBOARD REPLACEMENT.

OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING CONDUCTORS WILL REACH

NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE ADJUSTED WITHIN THE

PANELBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT TERMINATIONS ON NEW

PANELBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.

NEW PANELBOARD "LDP-1" - APPROXIMATE DIMENSIONS OF NEW BOX SHALL BE 26" W. X 6.5" D. X 83" H.

2'-4 1/2"

2'-2"

RECONNECT EXISTING EMPTY CONDUIT TO NEW PANELBOARD. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS

3/4" RIGID GALV. STEEL.

RECONNECT EXISTING EMPTY CONDUIT TO NEW PANELBOARD. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2"

RIGID GALV. STEEL.

ELEVATION - PANEL "PDP-1"

N.T.S.

PANEL "PDP-1"

AMP

BREAKER

PANELBOARD SCHEDULE

EXISTING AIR COMPR.

SPARE

SPACE ONLY

200 3

12 200

AMP

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

POLE

BREAKER

2 200

CKT. #

EXISTING AIR COMPR.

EXISTING PANEL P5

SPARE

SPACE ONLY

SURFACE MOUNTED PANEL W/ GROUND BUS

POLE A

ISOLATED FROM NEUTRAL BUS.

LOAD (AMPS)

B C

SPACE ONLY

SPACE ONLY

LOAD SERVED

25 KAIC INTERRUPTING RATING480Y/277 V., 3Ø, 4 W.

400 A. M.L.O. (TOP MTD.)

EXISTING PANEL P1

EXISTING MD4 WASH

RACK

KEY NOTES - PANEL "PDP-1"

EXISTING PANEL TO BE REMOVED AND REPLACED.

RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR

BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.

INSTALL COUPLING AND EXTEND NEW CONDUIT ON EXISTING FEEDER FROM SWITCHBOARD "T3." PULL IN NEW WIRING AS

SHOWN ON "SINGLE LINE DIAGRAM." FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.

PANELBOARD NOTE:

PHYSICAL SIZE OF NEW PANELBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE PANELBOARD REPLACEMENT.

OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING CONDUCTORS WILL REACH

NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE ADJUSTED WITHIN THE

PANELBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT TERMINATIONS ON NEW

PANELBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.

NEW PANELBOARD "PDP-1" - APPROXIMATE DIMENSIONS OF NEW BOX SHALL BE 26" W. X 6.5" D. X 83" H.

RECONNECT EXISTING EMPTY CONDUIT TO NEW PANELBOARD. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2"

RIGID GALV. STEEL.

SPACE ONLY

SPACE ONLY

SPACE ONLY 3

100 200

4'-11 1/4"

2'-2"

CIRCUIT BREAKER NOTE:

EXISTING FUSE SIZES HAVE BEEN VERIFIED IN THE EXISTING FUSIBLE PANELBOARDS ONLY WHERE EXISTING FUSIBLE

SWITCH DOORS COULD BE OPENED WHILE THE SWITCH WAS ENERGIZED. FUSE SIZES HAVE NOT BEEN VERIFIED WHERE

THE SWITCH DOORS COULD NOT BE OPENED. THE CONTRACTOR SHALL SCHEDULE A POWER OUTAGE PRIOR TO

ORDERING THE NEW REPLACEMENT CIRCUIT BREAKER PANELBOARDS SO THAT ALL FUSIBLE SWITCH DOORS CAN BE

OPENED AND ALL FUSES SIZES CAN BE VERIFIED. THE CONTRACTOR SHALL PROVIDE NEW CIRCUIT BREAKERS IN THE

NEW PANELBOARDS WHICH ARE SIZED TO MATCH THE EXISTING FUSE SIZES. THE AS BUILT DRAWINGS PROVIDED AT

THE END OF CONSTRUCTION SHALL REFLECT THE EXACT CIRCUIT BREAKER SIZES.

E-11

P A

N E

L B

O A

E

V A

T I O

O U

L

O N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

SWITCHBOARD SCHEDULE

SPACE ONLY

AMP

SWITCHBOARD "T3"

EXISTING PANEL PDP-1

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

400 3 1

POLE

BREAKER

CKT. #

SPACE ONLY

POLE A

LOAD (AMPS)

B C

LOAD SERVED

35 KAIC INTERRUPTING RATING

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

NEW PANEL "TS" SPACE ONLY

480Y/277 V., 3Ø, 4 W.

800 A. MAIN LUGS ONLY

FREE STANDING FRONT AND REAR

ACCESSIBLE SWITCHBOARD W/ GROUND

BUS ISOLATED FROM NEUTRAL BUS.

KEY NOTES - SWITCHBOARD "T3"

3'-0"

ELEVATION - SWITCHBOARD "T3"

N.T.S.

400 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 1

400 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 5

SPACE ONLY

SWITCHBOARD DEPTH SHALL BE 48"

15 16

17 18

19 20

21 22

3 3SPACE ONLY SPACE ONLY

3 3SPACE ONLY SPACE ONLY

3 3SPACE ONLY SPACE ONLY

3SPACE ONLY

EXISTING

FLOOR SLAB

SWITCHBOARD NOTE:

PHYSICAL SIZE OF NEW SWITCHBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE SWITCHBOARD

REPLACEMENT. OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING

CONDUCTORS WILL REACH NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE

ADJUSTED WITHIN THE SWITCHBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT

TERMINATIONS ON NEW SWITCHBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.

RECONNECT EXISTING CONDUIT TO NEW SWITCHBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR

BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.

NEW PARALLEL FEEDER TO SWITCHBOARD "T3" FROM SWITCHBOARD "MSB-S" ON FIRST FLOOR.

SPACE ONLY

SPACE ONLY

SPACE ONLYSPACE ONLY

SPACE ONLY

SPACE ONLY

2 SPACE ONLY

SPACE ONLY

NEW FEEDER TO PANELBOARD "TS" ON FIRST FLOOR.

23 24

AMP

BREAKER

PANELBOARD SCHEDULE

SPACE ONLY 9

AMP

PANEL "TS"

SPACE ONLY

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

225 3 1

POLE

BREAKER

CKT. #

SPACE ONLY

POLE A

LOAD (AMPS)

B C

LOAD SERVED

14 KAIC INTERRUPTING RATING

EXISTING PANELBOARD SPACE ONLY

480Y/277 V., 3Ø, 4 W.

400 A., 3 P. MAIN BREAKER

SURFACE MOUNTED PANEL W/ GROUND BUS

ISOLATED FROM NEUTRAL BUS.

SPACE ONLY

SPACE ONLY

SPACE ONLYSPACE ONLY

SPACE ONLY

E-12

S W

I T

C H

B O

A R

D

T

E

L E

V A

T I O

N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

SWITCHBOARD SCHEDULE

AMP

SWITCHBOARD "T4"

EXISTING LOAD

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

100 3 1

POLE

BREAKER

2 200

CKT. #

POLE A

LOAD (AMPS)

B C

LOAD SERVED

208Y/120 V., 3Ø, 4 W.

1200 A., 3 P. MAIN BREAKER

65 KAIC INTERRUPTING RATING FREE STANDING FRONT AND REAR ALIGNED,

FRONT AND REAR ACCESSIBLE SWITCHBOARD

W/ GROUND BUS BONDED TO NEUTRAL BUS.

EXISTING LOAD

SPACE ONLY

EXISTING LOAD

153 16 3 SPACE ONLY

KEY NOTES - SWITCHBOARD "T4"

SWITCHBOARD "T4" MAIN BREAKER SECTION

2'-6" 3'-0"

ELEVATION - SWITCHBOARD "T4"

N.T.S.

1200 A., 3 P. MAIN BREAKER

SWITCHBOARD "T4" DISTRIBUTION SECTION

SURGE PROTECTIVE DEVICE

100 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 1

200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 2

SPACE ONLY

SWITCHBOARD DEPTH SHALL BE 48" FOR MAIN

BREAKER SECTION AND DISTRIBUTION SECTION.

5 6

17 18

19 20

3 SPACE ONLY

2 SPACE ONLY

3SPACE ONLY

2SPACE ONLY

EXISTING

FLOOR SLAB

RECONNECT EXISTING CONDUIT TO NEW SWITCHBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT

BREAKER. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.

SWITCHBOARD NOTE:

PHYSICAL SIZE OF NEW SWITCHBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE SWITCHBOARD

REPLACEMENT. OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING

CONDUCTORS WILL REACH NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE

ADJUSTED WITHIN THE SWITCHBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT

TERMINATIONS ON NEW SWITCHBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.

125 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 4

300 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 5

300 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 8

EXISTING LOAD

EXISTING PANEL LDP-1

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

RECONNECT EXISTING CONDUIT TO NEW SWITCHBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT

BREAKER. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.

NEW SWITCHBOARD "MSB-S"

LARGE SCALE PLAN - SWITCHBOARD "MSB-S"

SCALE: 1/4" = 1'-0"

ENCLOSED CIRCUIT BREAKERS FOR

HANGAR DOOR PANELS. SEE

"SINGLE LINE DIAGRAM," SHEET E-6.

NEW 4" HIGH CONCRETE PAD -

EXTEND 6" MINIMUM BEYOND

EDGES OF NEW SWITCHBOARD.

METERING COMPARTMENT

SURGE PROTECTIVE DEVICE NOTE:

SURGE PROTECTIVE DEVICES (SPD) SHALL BE LISTED IN ACCORDANCE W/ UL 1449, 3RD EDITION AND SHALL BE A

TYPE 1 DEVICE. SPD SHALL PROVIDE PROTECTION OF LINE-NEUTRAL, LINE-GROUND, NEUTRAL-GROUND AND

LINE-LINE. EACH MODE OF PROTECTION SHALL BE FUSED W/ 200 KAIC SURGE RATED FUSES. SPD SHALL BE

FURNISHED W/ AN AUDIBLE ALARM, AN ALARM ON/OFF SWITCH AND AN ALARM PUSH TO TEST SWITCH. MINIMUM

SHORT CIRCUIT CURRENT RATING SHALL BE 200kA. MINIMUM SURGE CURRENT RATING PER PHASE SHALL BE

300kA. VOLTAGE PROTECTION RATINGS SHALL BE 700 VOLTS FOR LINE-NEUTRAL, LINE-GROUND AND

NEUTRAL-GROUND. VOLTAGE PROTECTION RATING SHALL BE 1200 VOLTS FOR LINE-LINE. SPD SHALL HAVE A

MINIMUM EMI/RFI FILTERING OF -50dB AT 100kHz WITH AN INSERTION RATIO OF 50:1 USING MIL-STD-220A

METHODOLOGY. SPD SHALL BE PROVIDED WITH ONE SET OF NO/NC CONTACTS, AND SHALL HAVE A FULL 10 YEAR

WARRANTY. SPD SHALL HAVE A NEMA 1 ENCLOSURE FOR INDOOR APPLICATIONS.

13 NEW PARALLEL FEEDER FROM DRY-TYPE TRANSFORMER.

E-13

S W

I T

C H

B O

A R

D

T

E

L E

V A

T I O

N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

SWITCHBOARD SCHEDULE

AMP

SWITCHBOARD "MSB-N"

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

3 1

POLE

BREAKER

CKT. #

POLE A

LOAD (AMPS)

B C

LOAD SERVED

480Y/277 V., 3Ø, 4 W.

2500 A., 3 P. GFP MAIN BREAKER

50 KAIC INTERRUPTING RATING FREE STANDING FRONT AND REAR ALIGNED,

FRONT ACCESSIBLE SWITCHBOARD W/

OUTDOOR WEATHERPROOF ENCLOSURE &

GROUND BUS BONDED TO NEUTRAL BUS.

SPACE ONLY

153 16 3 SPACE ONLY

KEY NOTES - SWITCHBOARD "MSB-N"

SWITCHBOARD "MSB-N" MAIN BREAKER SECTION

2'-6" 3'-0"

ELEVATION - SWITCHBOARD "MSB-N"

N.T.S.

2500 A., 3 P. MAIN BREAKER

SWITCHBOARD "MSB-N" DISTRIBUTION SECTION

SURGE PROTECTIVE DEVICE

1600 A., 3 P. CIRCUIT BREAKER

SPACE ONLY

SWITCHBOARD DEPTH SHALL BE 48" FOR MAIN

BREAKER SECTION AND DISTRIBUTION SECTION.

7 7

17 18 2 SPACE ONLY2SPACE ONLY

EXISTING

FLOOR SLAB

SWITCHBOARD "T1"

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

EXISTING MOTOR CONTROL

CENTER "MCC"

SPACE ONLY

SPACE ONLY

SPACE ONLY

800 A., 3 P. CIRCUIT BREAKER

SPACE ONLY SPACE ONLY

SWITCHBOARD "MSB-N"

BUILDING 90700 SERVICE ENTRANCE 1 OF 2

SERVICE NUMBER 2 IS LOCATED IN THE EQUIPMENT ROOM ON

THE SOUTH END OF THIS BUILDING. SEE THE MAP BELOW FOR THE LOCATION.

SERVICE ENTRANCE 1 OF 2

SERVICE ENTRANCE 2 OF 2

8 SERVICE ENTRANCE ENGRAVED PHENOLIC NAMEPLATE. SEE DETAIL, THIS SHEET.

DETAIL - SERVICE ENTRANCE NAMEPLATE

N.T.S.

METERING COMPARTMENT

GFP COMPARTMENT

NOTE:

THIS ELEVATION DOES NOT INCLUDE THE OUTDOOR ENCLOSURE. SEE

"OUTDOOR ENCLOSURE ELEVATION - SWITCHBOARD 'MSB-N'," THIS SHEET.

OUTDOOR ENCLOSURE ELEVATION - SWITCHBOARD "MSB-N"

N.T.S.

FRONT VIEW SIDE VIEW

5'-1"SWITCHBOARD WIDTH 1/8"1/8"

4 1/2" 2 1/2"

SLOPED ROOF

KEY LOCK & HANDLE

VENTILATION OPENINGS

SURGE PROTECTIVE DEVICE NOTE:

SURGE PROTECTIVE DEVICES (SPD) SHALL BE LISTED IN ACCORDANCE W/ UL 1449, 3RD EDITION AND

SHALL BE A TYPE 1 DEVICE. SPD SHALL PROVIDE PROTECTION OF LINE-NEUTRAL, LINE-GROUND, NEUTRAL-GROUND AND LINE-LINE. EACH MODE OF PROTECTION SHALL BE FUSED W/ 200 KAIC SURGE

RATED FUSES. SPD SHALL BE FURNISHED W/ AN AUDIBLE ALARM, AN ALARM ON/OFF SWITCH AND AN

ALARM PUSH TO TEST SWITCH. MINIMUM SHORT CIRCUIT CURRENT RATING SHALL BE 200kA. MINIMUM

SURGE CURRENT RATING PER PHASE SHALL BE 300kA. VOLTAGE PROTECTION RATINGS SHALL BE 1200

VOLTS FOR LINE-NEUTRAL, LINE-GROUND AND NEUTRAL-GROUND. VOLTAGE PROTECTION RATING

SHALL BE 2000 VOLTS FOR LINE-LINE. SPD SHALL HAVE A MINIMUM EMI/RFI FILTERING OF -50dB AT

100kHz WITH AN INSERTION RATIO OF 50:1 USING MIL-STD-220A METHODOLOGY. SPD SHALL BE

PROVIDED WITH ONE SET OF NO/NC CONTACTS, AND SHALL HAVE A FULL 10 YEAR WARRANTY. SPD

SHALL HAVE A NEMA 1 ENCLOSURE FOR INDOOR APPLICATIONS.

PHENOLIC ENGRAVED NAMEPLATE -

8" X 10" MINIMUM WITH 1/8" HIGH

LETTERING - WHITE NAMEPLATE W/

BLACK CORE.

E-14

M A

I T

C H

B O

A R

D

M

S B

N

E

L E

V A

T I O

N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

SWITCHBOARD SCHEDULE

AMP

SWITCHBOARD "MSB-S"

LOAD SERVED

LOAD (AMPS)

A B C

CKT. #

3 1

POLE

BREAKER

CKT. #

POLE A

LOAD (AMPS)

B C

LOAD SERVED

480Y/277 V., 3Ø, 4 W.

1600 A., 3 P. GFP MAIN BREAKER

50 KAIC INTERRUPTING RATING FREE STANDING FRONT AND REAR ALIGNED,

FRONT ACCESSIBLE SWITCHBOARD W/

GROUND BUS BONDED TO NEUTRAL BUS.

SPACE ONLY

153 16 3 SPACE ONLY

KEY NOTES - SWITCHBOARD "MSB-S"

SWITCHBOARD "MSB-S" MAIN BREAKER SECTION

2'-6" 3'-0"

ELEVATION - SWITCHBOARD "MSB-S"

N.T.S.

1600 A., 3 P. MAIN BREAKER

SWITCHBOARD "MSB-S" DISTRIBUTION SECTION

SURGE PROTECTIVE DEVICE

1200 A., 3 P. CIRCUIT BREAKER

SPACE ONLY

SWITCHBOARD DEPTH SHALL BE 48" FOR MAIN

BREAKER SECTION AND DISTRIBUTION SECTION.

17 18

SWITCHBOARD "T3"

2 SPACE ONLY2SPACE ONLY

EXISTING

FLOOR SLAB

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLYSPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

SPACE ONLY

7 SERVICE ENTRANCE ENGRAVED PHENOLIC NAMEPLATE. SEE DETAIL, THIS SHEET.

SWITCHBOARD "MSB-S"

BUILDING 90700 SERVICE ENTRANCE 2 OF 2

SERVICE NUMBER 1 IS LOCATED IN THE STORAGE AREA ON

THE NORTH END OF THIS BUILDING. SEE THE MAP BELOW FOR THE LOCATION.

SERVICE ENTRANCE 1 OF 2

SERVICE ENTRANCE 2 OF 2

DETAIL - SERVICE ENTRANCE NAMEPLATE

N.T.S.

METERING COMPARTMENT

GFP COMPARTMENT

SPACE ONLY

SPACE ONLY

SURGE PROTECTIVE DEVICE NOTE:

SURGE PROTECTIVE DEVICES (SPD) SHALL BE LISTED IN ACCORDANCE W/ UL 1449, 3RD EDITION AND SHALL BE A

TYPE 1 DEVICE. SPD SHALL PROVIDE PROTECTION OF LINE-NEUTRAL, LINE-GROUND, NEUTRAL-GROUND AND

LINE-LINE. EACH MODE OF PROTECTION SHALL BE FUSED W/ 200 KAIC SURGE RATED FUSES. SPD SHALL BE

FURNISHED W/ AN AUDIBLE ALARM, AN ALARM ON/OFF SWITCH AND AN ALARM PUSH TO TEST SWITCH. MINIMUM

SHORT CIRCUIT CURRENT RATING SHALL BE 200kA. MINIMUM SURGE CURRENT RATING PER PHASE SHALL BE

300kA. VOLTAGE PROTECTION RATINGS SHALL BE 1200 VOLTS FOR LINE-NEUTRAL, LINE-GROUND AND

NEUTRAL-GROUND. VOLTAGE PROTECTION RATING SHALL BE 2000 VOLTS FOR LINE-LINE. SPD SHALL HAVE A

MINIMUM EMI/RFI FILTERING OF -50dB AT 100kHz WITH AN INSERTION RATIO OF 50:1 USING MIL-STD-220A

METHODOLOGY. SPD SHALL BE PROVIDED WITH ONE SET OF NO/NC CONTACTS, AND SHALL HAVE A FULL 10

YEAR WARRANTY. SPD SHALL HAVE A NEMA 1 ENCLOSURE FOR INDOOR APPLICATIONS.

PHENOLIC ENGRAVED NAMEPLATE -

8" X 10" MINIMUM WITH 1/8" HIGH

LETTERING - WHITE NAMEPLATE W/

BLACK CORE.

E-15

M A

I T

C H

B O

A R

D

M

S B

S

E

L E

V A

T I O

N

90700

U P

G R

A D

E

E

L E

C T

R I C

R

V I C

E

H A

N G

PRIMARY RISER DIAGRAM - NORTH SERVICE

NO SCALE

REMOVE EXISTING PRIMARY JUNCTION

CABINET & INSTALL NEW JUNCTION

CABINET ON…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.