About this file

FA441718R0019, Amendment 01 and Attachment 7. This package is additional "contract documents" mentioned on Sheet T-1 Work Phasing and Power Outage Notes #3.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FTEV 14-1057

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide details regarding temporary pow er requirements as identified in project draw ings.

A. Incorporate, Attachment 7, Temporary Pow er, Lighting and Cooling requirement document dated 03 Jul 2018 to solicitation attachments.

B. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA441718R0019

X 9B. DATED (SEE ITEM 11)

08-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Aug-2018

CODE

1 SOCONS

350 TULLY ST.

HURLBURT FIELD FL 32544

FA4417 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA441718R0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

TITLE DATE No of Pages

1. Specifications 01 Apr 2015 114

FTEV 14-1057

2. Drawing (Updated) 25 Jul 2018 19

FTEV 14-1057

3. Schedule of Wage Rates 12 Jan 2018 5 Building-Decision Number: FL20170262

4. Past Performance Questionnaire Undated 3

5. Financial Questionnaire Undated 1

6. Additional Contract Requirements Undated 3

7. Temporary Power, Lighting and Cooling Reqs 03 Jul 2018 6

AMENDMENTS: Amendments issued to this solicitation will be part of any resultant contract and will be listed above at the time of award

(End of Summary of Changes)

Temporary Power, Lighting and Cooling – CP 1026756 Upgrade Electrical Service Hangar 90700 . This package is additional "contract documents" mentioned on sheet T-1 Work Phasing/Power Outage Notes 3.

The contractor is to provide temporary power, lighting and cooling to five areas of Hangar 90700 for the entire time (24/7) during the 30 day shutdown period. These areas will be occupied by the government during this period. The 5 areas are as follows and shown on the attached floorplan:

- Metal Shop (1st floor South Pylon)

- Wheel and Tire Shop (1st floor North Pylon)

- Break/Office area (1st floor North Pylon)

- South Dock Box (in Bay adjacent to South Pylon)

- North Dock Box (in Bay adjacent to North Pylon)

The requirements for each area are as follows:

Metal Shop, to include Tool Crib

- Provide temporary lighting (50 foot-candles minimum)

- Provide temporary cooling (maximum 80 degrees F)

- Provide temporary electric power to 16 pieces of equipment identified on Equipment List

Wheel and Tire Shop

- Provide temporary lighting (50 foot-candles minimum)

- Provide temporary cooling (maximum 80 degrees F)

- Provide temporary electric power to 6 pieces of equipment identified on Equipment List

Break/Office Area

- Provide temporary lighting (35 foot-candles minimum)

- Provide temporary cooling (maximum 80 degrees F)

South Dock Box

- Provide temporary power. Current feed is from 100 amp breaker located in panel shown on attached diagram.

North Dock Box

- Provide temporary power. Current feed is from 100 amp breaker located in panel shown on attached diagram.

All temporary power must be installed to meet OSHA and NFPA requirements. Wiring is preferred to be run overhead. If wiring is run on floor, floor cable covers must be utilized.

The contractor must submit for government approval, a detailed temporary power, lighting and cooling plan stating the methods and equipment used at least 90 days before the shutdown.

1070200712C Typewritten Text FA441718R0019, Attachment 7 03 Jul 2018

Eason Hangar Temporary 30-day power requirements 220V/230V 240V

Sheet Metal shop 440V/460V Item # Equipment Name Manufacturer Model # Voltage 1-Phase/3-Phase Max Amps

1 Drill Press Dayton 2LKP9 230v 1-Phase 23a 2 Press (EEECSE023) Accupress 710010 460v 3-Phase 32.5 3 Belt Sander Kalamazoo S6X60W 230v 3-Phase 6.4a 4 Shear (EEECSE038) Accushear 650012 460v 3-Phase 51a 5 Bandsaw (EEECSE040) Dake Johnson V40 230v 3-Phase 6.36 6 Hydropress Control Box Banner MUC-1 230v 3-Phase 3a 7 Hydropress Motor Baldor BA1202F 460v 3-Phase 72a 8 Power Leaf Break Dreis and Krump PB 8187 440v 3-Phase 6.8a 9 Disk/Spindle Sander Max 30DVS 230V 3-Phase 10a (estimated)

10 Eaton Leonard Roblix Eaton Leonard 200SEHR 460v 3-Phase 60a 11 Single Flare PHI 3CPV-5-4 240v 3-Phase 15a 12 Power Roller Sesco 1-E/ 1820 230v 3-Phase 14a 13 30/70 Hydrualic Press (EEECSE041) Personnel Hydraulic Press PHP3070 460 VAC 3 phase 72 14 Power Roller (EEECSE010) Rol Shear Inc. 1-E 220 VAC 3 phase 14 15 Sander (Small) (EEECSE026) Burr King 750 230 VAC 3 phase 8.64

Sheet Metal Tool Room Item # Equipment Name Manufacturer Model # Voltage 1-Phase/3-Phase Max Amps

1 Tool Carousel White Systems EE1270-112 230v 3-Phase 30a

Wheel/Tire Shop Item # Equipment Name Manufacturer Model # Voltage 1-Phase/3-Phase Max Amps

1 Dual Tire Inflator Safety Cage BAUER 5871007 220V Phase 1 20AMPS 2 Oven Thermal Drying Precision Quincy Co. 32-650 460V PHASE 2 30AMPS

3 GRAYMILLS JET PARTS WASHER GRAYMILLS CO. PCS-6060F 460V PHASE 3 132AMPS

4 UNIVERSAL WHEEL BUILD UP STAND BAUER 8071007 240V PHASE 3 30AMPS

5 TIRE BEAD BREAKER REGENT 715J1000EX 240V PHASE 3 5.2AMPS

6 FREEZER (REQ FOR BUSHINGS) SCIENTEMP 34-15B 230V PHASE 1 5AMPS

Office Area South Tower 1st Floor Temp Lighting Temp Cooling

Isodock - North Power to dock box

Isodock - South Power to dock box

Office Area

South Dockbox

North Dockbox

Metal Shop/ Tool Crib

Wheel & Tire Shop

To ol c rib

220V/230V

240V

440V/460V

Metal Shop/Tool Crib

Tire and Wheel Shop

220V/230V

240V

440V/460V

South Dockbox Breaker

South Dockbox

North Dockbox

North Dockbox Breaker

Amend 1
90700 Temp Power Reqs 3 Jul
Power requirement
Equipment
Sheet1
Eason Hangar Temporary Power Requirements
Slide Number 1
Slide Number 2
Tire and Wheel Shop
Slide Number 4

File details come from the government source that posted it.