Attch 5 10-R-0012 WD FL080218.docx
DOCX document 30 KB Posted
- Attached to
- Roofing IDIQ - Hurlburt Field, FL Federal contract opportunity
- Solicitation number
- FA4417-10-R-0012
About this file
Roof IDIQ FA4417-10-R-0012 Wage Determination FL 080218
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4417-10-R-0012, Attachment 5
General Decision Number: FL100218 03/12/2010 FL218
Superseded General Decision Number: FL20080218
State: Florida
Construction Type: Residential
County: Okaloosa County in Florida.
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories).
Modification Number Publication Date 0 03/12/2010
* ENGI0653-011 10/01/2009
Rates Fringes
POWER EQUIPMENT OPERATOR:
Backhoe.....................$ 23.30 10.63 Cranes 100 Tons & Over (Conventional & Hydraulic) & Tower Cranes..............$ 24.30 10.63 Cranes Under 100 Tons.......$ 23.30 10.63 Oiler.......................$ 21.85 10.63
Cranes with 350 feet or more boom and/or 400 ton capacity -additional $1.10 per hour.
Cranes with 500 feet boom and/or 600 ton capacity -additional $1.45 per hour.
IRON0798-005 10/01/2008
Rates Fringes
IRONWORKER, ORNAMENTAL,
REINFORCING AND STRUCTURAL.......$ 22.03 11.75
SHEE0441-005 10/01/2007
Rates Fringes
SHEETMETAL WORKER (Excluding Metal Roofing)...................$ 21.10 9.06
SUFL2009-115 06/08/2009
Rates Fringes
BRICKLAYER.......................$ 20.00 0.00
CARPENTER........................$ 13.53 0.00
CEMENT MASON/CONCRETE FINISHER...$ 11.88 0.00
ELECTRICIAN......................$ 11.54 0.00
LABORER: Common or General......$ 10.50 0.00
LABORER: Mason Tender - Brick...$ 11.51 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 10.46 0.00
LABORER: Pipelayer..............$ 10.06 0.00
LABORER: Roof Tearoff...........$ 9.00 0.00
LABORER: Landscape and Irrigation.......................$ 9.15 0.00
OPERATOR: Asphalt Paver.........$ 11.63 0.00
OPERATOR: Backhoe Loader Combo............................$ 17.04 0.00
OPERATOR: Bulldozer.............$ 13.67 0.00
OPERATOR: Distributor...........$ 11.41 0.00
OPERATOR: Excavator.............$ 13.50 0.00
OPERATOR: Forklift..............$ 17.50 0.00
OPERATOR: Grader/Blade..........$ 15.50 0.00
OPERATOR: Loader................$ 13.53 0.00
OPERATOR: Roller................$ 10.62 0.00
OPERATOR: Screed................$ 10.93 0.00
OPERATOR: Trackhoe..............$ 15.68 0.00
OPERATOR: Tractor...............$ 10.20 0.00
PAINTER: Brush, Roller and Spray............................$ 14.00 0.00
PLUMBER..........................$ 13.53 0.00
ROOFER, Including Modified Bitumen, Built Up and Shake and Shingle (Excluding Metal Roof)............................$ 10.77 0.00
ROOFER: Metal Roof..............$ 16.99 0.00
TRUCK DRIVER: Lowboy Truck......$ 12.10 0.00
TRUCK DRIVER: Dump Truck.........$ 9.59 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION