Questions regarding Repair HVAC System Control Tower, Bldg. 90729

Solicitation # FA4417-08-R-0023

1. Per existing completion time of 180 days, we do not feel that this will provide adequate time to complete the project based on lead times for the new chiller that is to be installed. The new chiller has an approximate lead time of 12-15 weeks which would only allow construction time of only 10 weeks. I am requesting that an additional 120 days to be added to the project duration for procurement, construction, and scheduling purposes. We also feel that additional time will be necessary due to the limited access to the construction areas throughout the building.

ANSWER: The performance period as stated in the RFP is adequate. We would expect that the other elements of the project would be completed while the chiller is on order.

2. Please provide depth of concrete that will have to be core drilled between floors for the installation of the new chilled water piping.

ANSWER: The floors in the control tower are 8”.