FA4417-08-R-0023 Attachment 1 - Wage Rates.pdf

PDF 80 KB Posted

Attached to
Repair HVAC System, Bldg 90729, Control Tower Federal contract opportunity
Solicitation number
FA4417-08-R-0023
Issued by
Department of the Air Force Special Operations Command

About this file

FA4417-08-R-0023 Attachment 1 - Wage Rates

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number FL20080092 Contract FA4417-08-R-0023

General Decision Number FL20080092 02/08/2008 FL92 Date: February 8, 2008 Superseded General Decision No. FL20070095 State: Florida Construction Type:

BUILDING

County:

OKALOOSA County in Florida.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories).

Modification Number Publication Date 0 02/08/2008 COUNTY(ies):

OKALOOSA

SUFL1996-007 06/28/1996

Rates Fringes

BRICKLAYERS/BLOCKLAYER 13.11

CARPENTERS (Including Drywall Hanging, Batt Insulation, and Acoustical Ceiling Installation) 9.94

CEMENT MASONS/CONCRETE FINISHERS 10.19

ELECTRICIANS 9.97 .86

GLAZIERS 11.50

INSULATORS, HEAT AND FROST 10.46

LABORERS:

UNSKILLED 6.84

MASON TENDERS 7.00 .35

PAINTERS, BRUSH (Including Drywall Finishing) 10.23

PLUMBERS 9.82

POWER EQUIPMENT OPERATORS:

BACKHOE 7.88

GRADER 9.38

ROLLER 6.75

SHEET METAL WORKERS (Including HVAC Duct Work) 8.70

TRUCK DRIVERS 6.50

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under that identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2) and 3) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U. S. Department of Labor 200 Constitution Avenue, N. W.

Washington, D. C. 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can Request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N. W.

Washington, D. C. 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U. S. Department of Labor 200 Constitution Avenue, N. W.

Washington, D. C. 20210 4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Atch 1

File details come from the government source that posted it. Updated .