Repair_Sanitary_Sewer_Outfall_AF_Form_66.pdf
PDF 30 KB Posted
- Attached to
- Repair Sanitary Sewer Outfalls Federal contract opportunity
- Solicitation number
- FA303018B0001
About this file
AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 02CS-2-CS-2_09Mar18.pdf | ||
| 05C-2-C-2_09Mar18.pdf | ||
| FA303018B00010005.pdf | ||
| GAFB_Sanitary_Sewerage_System_drawing.pdf | ||
| 18B0001-0004.pdf | ||
| Memo_for_Record_Site_Visit_Notes.pdf | ||
| FA303018B0001-0003.pdf | ||
| 08C-5-C-2 - Survey Benchmarks.pdf | ||
| 05C-2-C-2 - Plan Sheet.pdf | ||
| 03CS-3-CS-3 - General Notes, Staging, Coordination and Safety.pdf | ||
| 02CS-2-CS-2 - Abbreviations, Notes and Localized Site Plan.pdf | ||
| 07C-4-C-2 - Construction Sewer Man Hole Details.pdf | ||
| 06C-3-C-3 - Base Utilities.pdf | ||
| 01CS-1-CS-1 - Cover Sheet.pdf | ||
| 04C-1-C-1 - Plan Sheet.pdf | ||
| FA303018B0001- Amendment 0002.pdf | ||
| Amendment_0001.pdf | ||
| Heavy_Highway_TX180007.pdf | ||
| Insurance_Requirements.pdf | ||
| SOW_Attachments_A_and_B_Occupants.pdf | ||
| B100_-B500_Drawing_1.pdf | ||
| FA303018B0001.pdf | ||
| BAL_Request.pdf | ||
| B700_-_B900_Drawing_2.pdf | ||
| Repair_Sanitary_Sewer_SOW_27Oct17.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORM66.xls
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
Written Notification, Utility Outages, para 1.7.3
4 c GA
Written Notification, Sewer Outages, para 1.7.5
4 c GA
Traffic Control Plan, para 1.7.9
4 c GA
DD Form 1354, para 1.10
4 e
As built Drawings, para 1.14
4 e GA
Work Requests, para 1.21 4 Min. 3 days prior c
GA
FFP CIPP System Description, para 2.4
4 b GA
8 Assembly, para 2.5 4 b GA
10 Resin, para 2.5.6 4 b GA
11 Materials, para 2.5.7 4 b GA
Manufacturing Certificate, para 2.5.8
4 b GA
13 Catalyst, para 2.5.9 4 b GA
Sanitary Sewer Manholes Precast, para 2.6
4 b GA
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 09-1004 & JCGU09-1005
SA
MP
LE
S
PROJECT TITLE: Repair Sanitary Sewer Outfalls
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 09-1004 & JCGU09-1005
SA
MP
LE
S
PROJECT TITLE: Repair Sanitary Sewer Outfalls
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
15 Preparation, para 3.1
Bypassing Existing Sewage Flows, para 3.1.3
4 d GA
Pre-TV Inspection, para 3.1.4
4 d GA
Installation of CIPP Liner, para 3.2
4 b GA
20 Curing Logs, para 3.6 4 e GA
Field Quality Control, para 3.10
Testing of CIPP, para 3.11
Testing of Installed FFP, para 3.14
4 e GA
Testing of Installed CIPP, para 3.15
4 e GA
Post-TV Inspection, para 3.13
4 e GA
Repair CIPP, para 3.14
Repair of FFP Defects, para 3.15
4 e GA
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 09-1004 & JCGU09-1005
SA
MP
LE
S
PROJECT TITLE: Repair Sanitary Sewer Outfalls
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
Closeout Activities, para 3.17
Post Inspection Documentation, para 3.21.1
4 e GA
BCE Work Request, para 4.1.1
4 c GA
Hazardous Waste Manifest, para 5.3
4 c GA
30 Pesticides, para 5.8 4 c GA
Drinking Water, para 5.10
4 c GA
Solid Waste Disposal Report, para 5.12.1
4 c GA
AF Form 66
(a) As soon as possible but no later than 7 calendar days from NTP.
(b) Within 21 calendar days of NTP.
(c ) Prior to Use.
(d) Within 60 calendar days of NTP.
(e ) Final Inspection.
Sheet1
File details come from the government source that posted it.