Repair_Sanitary_Sewer_Outfall_AF_Form_66.pdf

PDF 30 KB Posted

Attached to
Repair Sanitary Sewer Outfalls
Solicitation number
FA303018B0001
Issued by

About this file

AF Form 66

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORM66.xls

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Written Notification, Utility Outages, para 1.7.3

4 c GA

Written Notification, Sewer Outages, para 1.7.5

4 c GA

Traffic Control Plan, para 1.7.9

4 c GA

DD Form 1354, para 1.10

4 e

As built Drawings, para 1.14

4 e GA

Work Requests, para 1.21 4 Min. 3 days prior c

GA

FFP CIPP System Description, para 2.4

4 b GA

8 Assembly, para 2.5 4 b GA

10 Resin, para 2.5.6 4 b GA

11 Materials, para 2.5.7 4 b GA

Manufacturing Certificate, para 2.5.8

4 b GA

13 Catalyst, para 2.5.9 4 b GA

Sanitary Sewer Manholes Precast, para 2.6

4 b GA

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 09-1004 & JCGU09-1005

SA

MP

LE

S

PROJECT TITLE: Repair Sanitary Sewer Outfalls

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 09-1004 & JCGU09-1005

SA

MP

LE

S

PROJECT TITLE: Repair Sanitary Sewer Outfalls

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

15 Preparation, para 3.1

Bypassing Existing Sewage Flows, para 3.1.3

4 d GA

Pre-TV Inspection, para 3.1.4

4 d GA

Installation of CIPP Liner, para 3.2

4 b GA

20 Curing Logs, para 3.6 4 e GA

Field Quality Control, para 3.10

Testing of CIPP, para 3.11

Testing of Installed FFP, para 3.14

4 e GA

Testing of Installed CIPP, para 3.15

4 e GA

Post-TV Inspection, para 3.13

4 e GA

Repair CIPP, para 3.14

Repair of FFP Defects, para 3.15

4 e GA

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 09-1004 & JCGU09-1005

SA

MP

LE

S

PROJECT TITLE: Repair Sanitary Sewer Outfalls

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Closeout Activities, para 3.17

Post Inspection Documentation, para 3.21.1

4 e GA

BCE Work Request, para 4.1.1

4 c GA

Hazardous Waste Manifest, para 5.3

4 c GA

30 Pesticides, para 5.8 4 c GA

Drinking Water, para 5.10

4 c GA

Solid Waste Disposal Report, para 5.12.1

4 c GA

AF Form 66

(a) As soon as possible but no later than 7 calendar days from NTP.

(b) Within 21 calendar days of NTP.

(c ) Prior to Use.

(d) Within 60 calendar days of NTP.

(e ) Final Inspection.

Sheet1

File details come from the government source that posted it.