02CS-2-CS-2_09Mar18.pdf
PDF 343 KB Posted
- Attached to
- Repair Sanitary Sewer Outfalls Federal contract opportunity
- Solicitation number
- FA303018B0001
About this file
Drawing 02CS-CS-2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 05C-2-C-2_09Mar18.pdf | ||
| FA303018B00010005.pdf | ||
| Memo_for_Record_Site_Visit_Notes.pdf | ||
| GAFB_Sanitary_Sewerage_System_drawing.pdf | ||
| 18B0001-0004.pdf | ||
| FA303018B0001-0003.pdf | ||
| 06C-3-C-3 - Base Utilities.pdf | ||
| 01CS-1-CS-1 - Cover Sheet.pdf | ||
| 04C-1-C-1 - Plan Sheet.pdf | ||
| FA303018B0001- Amendment 0002.pdf | ||
| 08C-5-C-2 - Survey Benchmarks.pdf | ||
| 05C-2-C-2 - Plan Sheet.pdf | ||
| 03CS-3-CS-3 - General Notes, Staging, Coordination and Safety.pdf | ||
| 02CS-2-CS-2 - Abbreviations, Notes and Localized Site Plan.pdf | ||
| 07C-4-C-2 - Construction Sewer Man Hole Details.pdf | ||
| Amendment_0001.pdf | ||
| Repair_Sanitary_Sewer_Outfall_AF_Form_66.pdf | ||
| B700_-_B900_Drawing_2.pdf | ||
| Repair_Sanitary_Sewer_SOW_27Oct17.pdf | ||
| Heavy_Highway_TX180007.pdf | ||
| Insurance_Requirements.pdf | ||
| SOW_Attachments_A_and_B_Occupants.pdf | ||
| B100_-B500_Drawing_1.pdf | ||
| FA303018B0001.pdf | ||
| BAL_Request.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
READY WILLING ABLE
17th
CIVIL ENGINEER SQUADRON
AutoCAD SHX Text
MISCELLANEOUS
AutoCAD SHX Text
CONC. MASONRY UNIT
AutoCAD SHX Text
CABINET
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
CEILING
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
CONTINUOUS
AutoCAD SHX Text
COORDINATE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CERAMIC TILE
AutoCAD SHX Text
CORR
AutoCAD SHX Text
CMU
AutoCAD SHX Text
CONT.
AutoCAD SHX Text
COORD
AutoCAD SHX Text
CER TILE
AutoCAD SHX Text
CLG
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CAB
AutoCAD SHX Text
BOT
AutoCAD SHX Text
BITUMINOUS
AutoCAD SHX Text
BENCH MARK
AutoCAD SHX Text
BLOCKING
AutoCAD SHX Text
BLOCK
AutoCAD SHX Text
ADJUSTABLE
AutoCAD SHX Text
TYPICAL ABBREVIATIONS
AutoCAD SHX Text
ABOVE FINISH FLOOR
AutoCAD SHX Text
ACOUSTIC INSULATION
AutoCAD SHX Text
ADJ.
AutoCAD SHX Text
BLK
AutoCAD SHX Text
BM
AutoCAD SHX Text
BLKG
AutoCAD SHX Text
AFF
AutoCAD SHX Text
BITUM
AutoCAD SHX Text
ACOUS. INSUL.
AutoCAD SHX Text
FIRE EXTINGUISHER CABINET
AutoCAD SHX Text
GYP BD.
AutoCAD SHX Text H.M.
AutoCAD SHX Text
GALV
AutoCAD SHX Text
FIN FLR
AutoCAD SHX Text
FIN
AutoCAD SHX Text
FLOUR.
AutoCAD SHX Text
EXT.
AutoCAD SHX Text
FEC
AutoCAD SHX Text
HOLLOW METAL
AutoCAD SHX Text
GYPSUM BOARD
AutoCAD SHX Text
GALVANIZED
AutoCAD SHX Text
FINISH FLOOR
AutoCAD SHX Text
FINISH
AutoCAD SHX Text
FLOURESCENT
AutoCAD SHX Text
EXTERIOR
AutoCAD SHX Text
PSI
AutoCAD SHX Text
SQUARE INCH
AutoCAD SHX Text
POUNDS PER
AutoCAD SHX Text
DET
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
DWG
AutoCAD SHX Text
DIM
AutoCAD SHX Text
DIST
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
DIMENSION
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
ELECTRIC(AL)
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
DISTANCE
AutoCAD SHX Text
DEMOLITION
AutoCAD SHX Text
LAV
AutoCAD SHX Text
MISC.
AutoCAD SHX Text
PROT.
AutoCAD SHX Text O.C.E.W.
AutoCAD SHX Text
MTL.
AutoCAD SHX Text
MAINT
AutoCAD SHX Text
INSUL
AutoCAD SHX Text
LAVATORY
AutoCAD SHX Text
METAL
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
PROTECTION
AutoCAD SHX Text
ON CENTER EACH WAY
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text
[WHERE APPLICABLE]
AutoCAD SHX Text
ATTENUATING
AutoCAD SHX Text
ATTEN.
AutoCAD SHX Text
ACCORDANCE
AutoCAD SHX Text
ACCORD.
AutoCAD SHX Text
ADDITION
AutoCAD SHX Text
ADDTN.
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
ALUM.
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
CONF.
AutoCAD SHX Text
CEMENTITIOUS BOARD
AutoCAD SHX Text
CEM. BD.
AutoCAD SHX Text
COLUMN
AutoCAD SHX Text
COL.
AutoCAD SHX Text
EA
AutoCAD SHX Text
EACH
AutoCAD SHX Text
EXT. CAB.
AutoCAD SHX Text
EXTINGUISHER CABINET
AutoCAD SHX Text
EQ
AutoCAD SHX Text
EQUAL
AutoCAD SHX Text E.W.
AutoCAD SHX Text
EACH WAY
AutoCAD SHX Text
EXP. JT.
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text E.W.C.
AutoCAD SHX Text
ELECTRIC WATER COOLER
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text F.D.
AutoCAD SHX Text
FLR.
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
FLR. E.J.
AutoCAD SHX Text
FLOOR EXPANSION JOINT
AutoCAD SHX Text
FURR'G
AutoCAD SHX Text
FURRING
AutoCAD SHX Text H.C.
AutoCAD SHX Text
HANDICAPPED
AutoCAD SHX Text
HDWD.
AutoCAD SHX Text
HARDWOOD
AutoCAD SHX Text
HORIZ.
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
MECH.
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
MPE
AutoCAD SHX Text
MECHANICAL-PLUMBING-
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
MTD.
AutoCAD SHX Text
MOUNTED
AutoCAD SHX Text
MANUFACTURED
AutoCAD SHX Text
MFRD.
AutoCAD SHX Text
MAX.
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text P
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
PLY'WD
AutoCAD SHX Text
PLYWOOD
AutoCAD SHX Text
PLBG.
AutoCAD SHX Text
PLUMBING
AutoCAD SHX Text
GA.
AutoCAD SHX Text
GAUGE
AutoCAD SHX Text
GFE
AutoCAD SHX Text
GOVERNMENT FURNISH
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text O.C.
AutoCAD SHX Text
ON CENTER
AutoCAD SHX Text
OPNG.
AutoCAD SHX Text
OPENING
AutoCAD SHX Text
ORIG. BLDG.
AutoCAD SHX Text
ORIGINAL BUILDING
AutoCAD SHX Text R.A.F.
AutoCAD SHX Text
RAISED ACCESS FLOOR
AutoCAD SHX Text
PROJ. MNT.
AutoCAD SHX Text
PROJECTOR MOUNT
AutoCAD SHX Text
REF.
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
RM.
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
SCTN.
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
SCW
AutoCAD SHX Text
SOLID CORE WOOD
AutoCAD SHX Text S.S.
AutoCAD SHX Text
STAINLESS STEEL
AutoCAD SHX Text
STL.
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
SCHED.
AutoCAD SHX Text
SCHEDULE
AutoCAD SHX Text
SPEC.
AutoCAD SHX Text
SPECIFICATION
AutoCAD SHX Text
RESIL.
AutoCAD SHX Text
RESILIENT
AutoCAD SHX Text
STRUCT.
AutoCAD SHX Text
STRUCTURE
AutoCAD SHX Text
SUSP. GRID
AutoCAD SHX Text
SUSPENDED GRID
AutoCAD SHX Text
CLG. SYS.
AutoCAD SHX Text
CEILING SYSTEM
AutoCAD SHX Text
THICK
AutoCAD SHX Text
THK.
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
TYPICAL MARKER/TACK
AutoCAD SHX Text
TYP. MRKR./
AutoCAD SHX Text
TACK BD.
AutoCAD SHX Text
BOARD
AutoCAD SHX Text
UNC.
AutoCAD SHX Text
UNCASED
AutoCAD SHX Text
WD.
AutoCAD SHX Text
WOOD
AutoCAD SHX Text V.W.C.
AutoCAD SHX Text
VINYL WALL COVERING
AutoCAD SHX Text U.S.G.
AutoCAD SHX Text
UNITED STATES GYPSUM
AutoCAD SHX Text V.C.T.
AutoCAD SHX Text
VINYL COMPOSITION TILE
AutoCAD SHX Text
VERT.
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text
WDW.
AutoCAD SHX Text
WINDOW
AutoCAD SHX Text W/
AutoCAD SHX Text
WITH
AutoCAD SHX Text
W/MFR'S
AutoCAD SHX Text
WITH MANUFACTURER'S
AutoCAD SHX Text W.W.F.
AutoCAD SHX Text
WELDED WIRE FABRIC
AutoCAD SHX Text %%C%%
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text PRIVATIZED ELECTRICAL UTILITY SYSTEMS: AEP TEXAS NORTH COMPANY IS THE UTILITY OWNER AND SOLE PROVIDER OF THE ELECTRICAL DISTRIBUTION UTILITY SYSTEM AT GOODFELLOW AIR FORCE BASE, TEXAS. NEWLY PROVIDED SYSTEM INFRASTRUCTURE AND/OR MODIFICATIONS OF OR CONNECTIONS TO THE EXISTING SYSTEM INFRAISTRUCTURE IDENTIIFIED IN THE SPECIFICATIONS AND/OR DRWAINGS MUST BE COORDINATED WITH THE UTILITY OWNER PRIOR TO THE CONTRACT START DATE. TO CONNECT FACILITIES, THE CONSTRUCTION CONTRACTOR SHALL REQUEST THAT THE UTILITY OWNER PROVIDE THE REQUIRED CONNECTING FACILITIES, UP TO A POINT OF DEMARCATION WHICH INCLUDES ALL TERMINATIONS AT THE TRANSFORMER. ALL WORK ON THE SYSTEM OR FACILLITIES EXPECTED TO CONNECT TO THE SYSTEM SHALL COMPLY WITH THE UTILITY OWNER'S SPECIFICATIONS AND CONSTRUCTION STANDARDS. IN NO EVENT SHALL THE CONSTRUCTION CONTRACTOR CONNECT TO, OR OTHERWISE TOUCH THE UTILITY OWNER'S INFRASTRUCURE WITHOUT THE UTILITY OWNER'S EXPRESS WRITTEN PERMISSION. THE UTILITY OWNER: CONTACT VIA: AEP TEXAS NORTH COMPANY 930 West 19th Street San Angelo, Texas 76903 PHONE: 325-657-2800 ARCHITECT / ENGINEER RESPONSIBILITIES: 1. SITE PLAN WITH ADJACENT STREETS OR LANDMARKS IDENTIFIED. SITE PLAN WITH ADJACENT STREETS OR LANDMARKS IDENTIFIED. 2. BUILDING PLAN SHEETS WITH THE FOLLOWING INFORMATION: BUILDING PLAN SHEETS WITH THE FOLLOWING INFORMATION: A. LOCATION OF SERVICE ENTRANCE B. REQUESTED TRANSFORMER LOCATION, IF A PREFERENCE IS KNOWN. C. SQUARE FOOTAGE OF BUILDING SPACE WITH THE TYPE OF LOAD TO BE SERVED. D. ELECTRICAL PANEL SCHEDULE E. NUMBER AND SIZE OF SECONDARY CONDUCTORS TO BE TERMINATED AT THE TRANSFORMER F. PROPOSED LOCATION OF OTHER UTILITY ROUTES AND ENTRANCES. 3. LOAD DEMAND INFORMATION FROM EXISTING SIMILAR BUILDINGS. LOAD DEMAND INFORMATION FROM EXISTING SIMILAR BUILDINGS. 4. SCHEDULE OF WORK. SCHEDULE OF WORK. CONTRACTOR / BUILDER RESPONSIBILITIES: 1. CONTACT NAMES AND NUMBERS UPON ARRIVAL AT THE SITE. CONTACT NAMES AND NUMBERS UPON ARRIVAL AT THE SITE. 2. LOCATION OF TRANSFORMER PAD. LOCATION OF TRANSFORMER PAD. 3. INSTALL SECONDARY CONDUITS INTO THE APPROPRIATE WELL LOCATION BEFORE PAD INSTALLATION. THIS INCLUDES ANY INSTALL SECONDARY CONDUITS INTO THE APPROPRIATE WELL LOCATION BEFORE PAD INSTALLATION. THIS INCLUDES ANY REQUIRED METERING CABLE CONDUITS. 4. PROVIDE FINAL GRADE IN TRANSFORMER PAD AREA PRIOR TO PAD CONSTRUCTION. PROVIDE FINAL GRADE IN TRANSFORMER PAD AREA PRIOR TO PAD CONSTRUCTION. 5. INSTALLATION OF ANY REQUIRED INSTRUMENT RATED METERING EQUIPMENT. INSTALLATION OF ANY REQUIRED INSTRUMENT RATED METERING EQUIPMENT. 6. PROVIDE SECONDARY CABLE TERMINALS. PROVIDE SECONDARY CABLE TERMINALS. 7. PRIMARY CONDUIT DITCH COMPACTION IF REQUIRED. PRIMARY CONDUIT DITCH COMPACTION IF REQUIRED. 8. ASPHALT AND/OR CONCRETE CUT AND REPAIR IF REQUIRED. ASPHALT AND/OR CONCRETE CUT AND REPAIR IF REQUIRED. 9. LOCATION OF OTHER UTILITY LINES INSTALLED DURING THIS CONSTRUCTION. LOCATION OF OTHER UTILITY LINES INSTALLED DURING THIS CONSTRUCTION. 10. TEMPORARY POWER POLE (SEE ATTACHED SKETCHES). LOCATION TO BE APPROVED BY AEP TEXAS. NOTE: ANY LINE EXTENSION TEMPORARY POWER POLE (SEE ATTACHED SKETCHES). LOCATION TO BE APPROVED BY AEP TEXAS. NOTE: ANY LINE EXTENSION REQUIRED FOR THE PURPOSE OF TEMPORARY SERVICE WILL REQUIRE A CIAC TO COVER THE COST OF INSTALLATION AND REMOVAL OF TEMPORARY FACILITIES AND ANY MATERIAL WHICH CANNOT BE REUSED. AEP TEXAS RESPONSIBILITIES: 1. SIZING AND INSTALLATION OF ALL PRIMARY CONDUCTORS INCLUDING DITCH AND CONDUIT. SIZING AND INSTALLATION OF ALL PRIMARY CONDUCTORS INCLUDING DITCH AND CONDUIT. 2. SIZING AND INSTALLATION OF DISTRIBUTION TRANSFORMERS. SIZING AND INSTALLATION OF DISTRIBUTION TRANSFORMERS. 3. CONSTRUCTION OF TRANSFORMER PAD. SEE ATTACHED SKETCH CONSTRUCTION OF TRANSFORMER PAD. SEE ATTACHED SKETCH 4. INSTALLATION OF SECONDARY CABLE TERMINALS. INSTALLATION OF SECONDARY CABLE TERMINALS. CONSTRUCTION NOTES: 1. THE EDGE OF THE TRANSFORMER PAD SHALL NOT BE CLOSER THAN TWO FEET FROM A WALL, OR FIVE FEET FROM A DOOR THE EDGE OF THE TRANSFORMER PAD SHALL NOT BE CLOSER THAN TWO FEET FROM A WALL, OR FIVE FEET FROM A DOOR OR WINDOW, OR TWENTY FEET FROM A STAIRWELL OR FIRE ESCAPE. 2. TRANSFORMERS SHALL NOT BE COMPLETELY ENCLOSED BY WALLS, FENCES, OR LANDSCAPING WITHOUT VENTILATION WHICH IS TRANSFORMERS SHALL NOT BE COMPLETELY ENCLOSED BY WALLS, FENCES, OR LANDSCAPING WITHOUT VENTILATION WHICH IS APPROVED BY AEP TEXAS. THE ENTIRE WIDTH OF THE FRONT OF THE TRANSFORMER AND SECONDARY CABINET SHALL BE ACCESSIBLE. IF A FENCE IS INSTALLED, IT WILL HAVE SUFFICIENT GATES NECESSARY TO PROVIDE THIS ACCESS. 3. TRANSFORMERS WILL BE LOCATED IN THE AREAS WITH ALL WEATHER ACCESS BY SERVICE TRUCKS. IN ADDITION, THERE WILL TRANSFORMERS WILL BE LOCATED IN THE AREAS WITH ALL WEATHER ACCESS BY SERVICE TRUCKS. IN ADDITION, THERE WILL BE NO STRUCTURES CONSTRUCTED ABOVE TRANSFORMERS WHICH WOULD INHIBIT CRANE OPERATIONS. 4. NO OTHER UTILITY LINES WILL BE INSTALLED WITHIN TWO FEET OF THE TRANSFORMER PAD. NO OTHER UTILITY LINES WILL BE INSTALLED WITHIN TWO FEET OF THE TRANSFORMER PAD. 5. NO CUSTOMER EQUIPMENT, EXCEPT INSTRUMENT RATED METERING EQUIPMENT WHICH IS PLACED ON THE SECONDARY NO CUSTOMER EQUIPMENT, EXCEPT INSTRUMENT RATED METERING EQUIPMENT WHICH IS PLACED ON THE SECONDARY BUSHINGS, SHALL BE ATTACHED TO AEP TEXAS TRANSFORMERS; NOR WILL THERE BE ANY HOLES DRILLED INTO THE TRANSFORMER CABINET FOR CONDUITS, CONDUCTORS OR METERS. 6. THE NUMBER AND SIZE OF THE SECONDARY CONDUCTORS WHICH ARE ALLOWED TO BE ATTACHED TO THE TRANSFORMER THE NUMBER AND SIZE OF THE SECONDARY CONDUCTORS WHICH ARE ALLOWED TO BE ATTACHED TO THE TRANSFORMER SECONDARY BUSHINGS WILL BE CONTROLLED BY AEP TEXAS. IF THE DESIGN REQUIRES MORE OR LARGER CONDUCTORS THAN ALLOWED FOR A PARTICULAR TRANSFORMER SIZE, AEP TEXAS WILL INSTALL A SECONDARY CABINET WITH BUS BARS (SEE ATTACHED SKETCH) ADJACENT TO THE TRANSFORMER. AEP TEXAS WILL SUPPLY AND INSTALL THE SECONDARY CONDUCTORS FROM THE TRANSFORMER TO THE SECONDARY CABINET. THE POINT OF INTERCONNECTION WILL BE THE BUS BARS WITHIN THE SECONDARY CABINET. THIS CABINET WILL REQUIRE A LARGER TRANSFORMER PAD AS SHOWN ON THE ATTACHED SKETCH. 7. TRANSFORMERS LARGER THAN 1000 kVA WILL REQUIRE A LARGER PAD. THIS PAD IS SHOWN ON THE SKETCH LABELED 1500 TRANSFORMERS LARGER THAN 1000 kVA WILL REQUIRE A LARGER PAD. THIS PAD IS SHOWN ON THE SKETCH LABELED 1500 AND 2500 kVA. 8. TEMPORARY CONSTRUCTION POWER WILL BE SUPPLIED TO CUSTOMER SUPPLIED POWER POLES LOCATED WITHIN FIVE FEET OF TEMPORARY CONSTRUCTION POWER WILL BE SUPPLIED TO CUSTOMER SUPPLIED POWER POLES LOCATED WITHIN FIVE FEET OF AN EXISTING PAD MOUNTED TRANSFORMER OR WITHIN FIFTY FEET OF A PRIMARY POWER POLE (SEE ATTACHED SKETCHES).
AutoCAD SHX Text
GOODFELLOW AIR FORCE BASE, TEXAS
AutoCAD SHX Text 17th TRAINING WING
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text Project Number:
AutoCAD SHX Text Designed by: RICHARD ENRIGHT
AutoCAD SHX Text Submitted by:
AutoCAD SHX Text Symbol
AutoCAD SHX Text Description
AutoCAD SHX Text Date
AutoCAD SHX Text Appr
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
ABREVIATIONS, NOTES
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
AND LOCALIZED SITE PLAN
AutoCAD SHX Text Symbol
AutoCAD SHX Text Description
AutoCAD SHX Text Date
AutoCAD SHX Text Appr
AutoCAD SHX Text
SEQ.
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
CS-2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
JCGU 09-1004/1005
AutoCAD SHX Text Date:
AutoCAD SHX Text A-E Seal:
AutoCAD SHX Text Drawn by: SrA LETSON
AutoCAD SHX Text Reviewed by: RON TREPANIER
AutoCAD SHX Text
REPLACE BASE SANITARY SEWER SYSTEM
AutoCAD SHX Text
JCGU - 09-1004/1005
AutoCAD SHX Text
OCTOBER 23, 2017
AutoCAD SHX Text
SUMMARY OF QUANTITIES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Updated Summary of Quantities
AutoCAD SHX Text 2/15/18
| Sheets and Views |
| CS-2 |
File details come from the government source that posted it.