Storm Water Pollution Prevention Site Inspection Checklist

View the file

Other files for this federal contract opportunity

Other files attached to Asbestos & Lead Based Paint Abatement ID/IQ, newest first.
File Type Posted
Amendment_3.pdf PDF
Amendment_2.pdf PDF
RFP_FA3020-18-R-0012_Asbestos_IDIQ.pdf PDF
FA3020-18-R-0012_Amendment_1.pdf PDF
01_-_VNVP_149202_Specifications_-_SOW.pdf PDF
01_-_VNVP_149202_ACM-LBP_IDIQ_Package.pdf PDF
RFP_FA3020-18-R-0012_Asbestos_IDIQ.pdf PDF
06_-_SAFB_Form_151_-_Base_Pass.pdf PDF
04_-_Past_and_Present_Performance_Questionaire_Sheet.pdf PDF
05_-_SF_LLL.pdf PDF
03_-_TX180326Wichita.pdf PDF
02_-_Price_Exhibit_-_Blank_FINAL.pdf PDF
02_-_Price_Exhibit_-_Blank_FINAL.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORM WATER POLLUTION PREVENTION SITE

INSPECTION CHECKLIST

DATE:

Construction Site Name and Contractor:

Evaluated by:

Part III. Storm Water Pollution Prevention Plans (SWP3)

Storm water pollution prevention plans (SWP3) must be prepared to address discharges authorized under Parts II.E.2.and II.E.3. of the TCEQ Construction Storm Water Permit that will reach Waters of the United States, including discharges to MS4s (Sheppard AFB) that drain to

Waters of the United States, to identify and address potential sources of pollution that are reasonably expected to affect the quality of discharges from the construction site, including off-site material storage areas, overburden and stockpiles of dirt, borrow areas, equipment staging areas, vehicle repair areas, fueling areas, etc., used solely by the permitted project. The SWP3 must describe the implementation of practices that will be used to minimize to the extent practicable the discharge of pollutants in storm water associated with construction activity and non-storm water discharges described in Part II.A.3., in compliance with the terms and conditions of this permit. It is the responsibility of each operator to ensure compliance with the terms and conditions of this general permit in the areas of the construction site where that operator has control over construction plans and specifications or day-to-day operations.

SWPPP REQUIREMENTS

Note: Acquire a copy of the SWPPP for CEIV files

1. Does the SWP3 clearly list the name and, for large construction activities, the general permit authorization numbers, for each operator that participates in the shared SWP3?

Yes No NA (Page 25, Section A.1)

2. Until the TCEQ responds to receipt of the NOI with a general permit authorization number. Does the SWP3 specify the date that the NOI was submitted to TCEQ by each operator? Yes No NA (Page 25, Section A.1)

3. Does the SWP3 clearly indicate that the operator is responsible for satisfying each shared requirement of the SWP3? Yes No (Page, Section A.2)

Do all operators with control over construction plans and specifications:

4. Ensure the project specifications allow or provide that adequate BMPs are developed to meet the requirements of Part III (Page 24) of this general permit? Yes No

(Page 25, Section B.1 (a)).

5. Ensure that the SWP3 indicates the areas of the project where they have control over project specifications, including the ability to make modifications in specifications?

Yes No (Page 25, Section B.1 (b)).

6. Ensure that the SWP3 for portions of the project where they are operators indicates the name and site-specific TPDES authorization numbers for permittees with the day-to-day operational control over those activities necessary to ensure compliance with the SWP3 and other permit conditions? Yes No NA (Page 26, Section B.1 (d)).

Operators with day-to-day operational control of those activities at a project that are necessary to ensure compliance with an SWP3 and other permit conditions must ensure that the SWP3 accomplishes the following requirements:

7. Does the SWP3 meet the requirements of this general permit for those portions of the project where they are operators? Yes No (Page 26, Section B.2 (a)).

8. Does the SWP3 identify the parties responsible for implementation of best management practices (BMPs) described in the SWP3? Yes No (Page 26, Section B.1 (b)).

9. Does the SWP3 indicate areas of the project where they have operational control over day-to-day activities? Yes No (Page 26, Section B.1(c)).

10. Does the SWP3 include, for areas where they have operational control over day-to-day activities, the name and site-specific TPDES authorization number of the parties with control over project specifications, including the ability to make modifications in specifications? Yes No (Page 26, Section B.2 (d)).

11. Was the SWP3 prepared prior to obtaining authorization under this general permit, and implemented prior to commencing construction activities that result in soil disturbance?

Yes No (Page 26, Section C).

12. Is the SWP3 prepared so that it provides for compliance with the terms and conditions of this general permit? Yes No (Page 26, Section C).

13. Has a location for the onsite SWP3, site notice, and if applicable the NOI, at the construction site been described? Yes No (Page 26, Section

D).

The SWP3 must include, at a minimum, the information described in this section.

Does the SWP3 include a site or project description, which includes the following information:

14. A description of the nature of the construction activity? Yes No (Page

27, Section F.1(a))

15. A list of potential pollutants and their sources? Yes No (Page 27, Section F.1(b))

16. A description of the intended schedule or sequence of activities that will disturb soils for major portions of the site? Yes No (Page 28, Section F.1(c))

17. The total number of acres of the entire property and the total number of acres where construction activities will occur, including off-site material storage areas, overburden and stockpiles of dirt, and borrow areas that are authorized under the permittee’s NOI?

Yes No (Page 28, Section F.1(d))

18. Data describing the soil or the quality of any discharge from the site? Yes No

(Page 28, Section F.1(e))

19. A map showing the general location of the site (e.g. a portion of a city or county map)?

Yes No (Page 28, Section F.1(f))

A detailed site map (or maps) indicating the following: (Section F.1(g))

20. Drainage patterns and approximate slopes anticipated after major grading activities?

Yes No (Page 28, Section F.1(g)(i))

21. Areas where soil disturbance will occur? Yes No (Page 28, Section

F.1(g)(ii))

22. Locations of all major structural controls either planned or in place? Yes No

(Page 28, Section F.1(g)(iii))

23. Locations where temporary or permanent stabilization practices are expected to be used?

Yes No (Page 28, Section F.1(g)(iv))

24. Locations of construction support activities, including off-site activities, that are authorized under the permittee’s NOI, including material, waste, borrow, fill, or equipment storage areas? Yes No (Page 28, Section F.1(g)(v))

25. Surface waters (including wetlands) either at, adjacent, or in close proximity to the site?

Yes No (Page 28, Section F.1(g)(vi))

26. Locations where storm water discharges from the site directly to a surface water body or a municipal separate storm sewer system? Yes No (Page 28, Section

F.1(g)(vii))

27. Vehicle wash areas. Yes No (Page 28, Section F.1(g)(viii))

28. On the instance where the amount of information required to be included on the map would result in a single map being difficult to read and interpret, the operator has developed a series of maps that collectively include the required information? Yes

No NA (Page 28, Section F.1(g))

29. Does the SWP3 identify the location and description of support activities authorized under the permittee’s NOI, including asphalt plants, concrete plants, and other activities providing support to the construction site that is authorized under this general permit?

Yes No (Page 28, Section F.1 (h)) Concrete and batch plant are not permitted at Sheppard AFB.

30. Does the SWP3 name the receiving waters at or near the site that may be disturbed or that may receive discharges from disturbed areas of the project? Yes No

(Page 28, Section F.1(i))

31. Does the SWP3 include a copy of this TPDES general permit? Yes No

(Page 29, Section F.1(j))

32. Does the SWP3 include the notice of intent (NOI) and acknowledgement certificate for primary operators of large construction sites, and the site notice for small construction sites and for secondary operators of large construction sites? Yes No

(Page 29, Section F.1(k))

33. Does the SWP3 provide a description of the best management practices (BMPs) that will be used to minimize pollution in runoff? Yes No (Page 29, Section

F.2)

34. Does the SWP3 identify the general timing or sequence for implementation? Yes

No (Page 29, Section F.2)

35. Does the SWP3 describe erosion and sediment controls designed to retain sediment on-site to the extent practicable with consideration for local topography, soil type, and rainfall? Yes No (Page 29, Section F.2(a)(i))

36. Does the SWP3 describe control measures that are properly selected, installed, and maintained according to the manufacturers or designers specifications? Yes No

(Page 29, Section F.2(a)(ii))

37. Does the SWP3 describe the controls that must be developed to minimize the offsite transport of litter, construction debris, and construction materials? Yes No

(Page 29, Section F.2(a)(iii))

38. Does the SWP3 include a description of temporary and permanent erosion control and stabilization practices for the site, including a schedule of when the practices will be implemented? Yes No (Page 29, Section F.2(b))

39. Do the SWP3 site plans ensure that existing vegetation is preserved where it is possible?

Yes No (Page 29, Section F.2(b))

Erosion control and stabilization practices may include but are not limited to:

40. Establishment of temporary or permanent vegetation, mulching, geotextiles, sod stabilization, vegetative buffer strips, protection of existing trees and vegetation, slope texturing, temporary velocity dissipation devices, flow diversion mechanisms, and other similar measures. Does the SWP3 describe these activities? Yes No

(Page 29, Section F.2(b)(i))

The following records must be maintained and either attached to or referenced in the

SWP3, and made readily available upon request to the parties listed in Part III.D.1 of this general permit:

41. Does the SWP3 include the dates when major grading activities occur? Yes No

(Page 29, Section F.2(b)(ii)(A))

42. Does the SWP3 describe the dates when construction activities temporarily or permanently cease on a portion of the site? Yes No (Page 29, Section F.2(b)(ii)(B))

43. Does the SWP3 describe the dates when stabilization measures are initiated? Yes

No (Page 29, Section F.2(b)(ii)(C))

44. Does the SWP3 include a description of any sediment control practices used to remove eroded soils from storm water runoff, including the general timing or sequence for implementation of controls? Yes No (Section F.2(c))

45. Is the site with drainage areas of ten (10) or more acres? Yes No (Page

30, Section F.2(c)(i))

46. Will the site have Sedimentation Basin(s)? Yes No (Page 30, Section F.2(c)(i)(A))

47. A sedimentation basin is required, where feasible, for a common drainage location that serves an area with ten (10) or more acres disturbed at one time. A sedimentation basin maybe temporary or permanent, and must provide sufficient storage to contain a calculated volume of runoff from a 2- year, 24-hour storm from each disturbed acre drained. When calculating the volume of runoff from a 2-year, 24-hour storm event, it is not required to include the flows from offsite areas and flow from onsite areas that are either undisturbed or have already undergone permanent stabilization, if these flows are diverted around both the disturbed areas of the site and the sediment basin. Are these capacity calculations included in the SWP3? Yes No NA

(Page 31, Section F.2(c)(i)(A)(1))

48. Where rainfall data is not available or a calculation cannot be performed, the sedimentation basin must provide at least 3,600 cubic feet of storage per acre drained until final stabilization of the site. Has this information been calculated? Yes No

NA (Page 31, Section F.2(c)(i)(A)(2))

49. If a sedimentation basin is not feasible, then the permittee shall provide equivalent control measures until final stabilization of the site. In determining whether installing a sediment basin is feasible, the permittee may consider factors such as site soils, slope, available area, public safety, precipitation patterns, site geometry, site vegetation, infiltration capacity, geotechnical factors, depth to groundwater, and other similar considerations. The permittee shall document the reason that the sediment basins are not feasible, and shall utilize equivalent control measures, which may include a series of smaller sediment basins. Has this been accomplished? Yes No NA

(Page 31, Section F.2(c)(i)(A)(3))

50. Perimeter Controls: At a minimum, silt fences, vegetative buffer strips, or equivalent sediment controls are required for all down slope boundaries of the construction area, and for those side slope boundaries deemed appropriate as dictated by individual site conditions. Is this information included in the SWP3? Yes No (Page

31, Section F.2(c)(i)(B))

Controls for Sites with Drainage Areas Less than Ten Acres:

51. Sediment traps and sediment basins may be used to control solids in storm water runoff for drainage locations serving less than ten (10) acres. At a minimum, silt fences, vegetative buffer strips, or equivalent sediment controls are required for all down slope boundaries of the construction area, and for those side slope boundaries deemed appropriate as dictated by individual site conditions. Are these described in the SWP3?

Yes No (Page 31, Section F.2(c)(ii)(A))

52. Alternatively, a sediment basin that provides storage for a calculated volume of runoff from a 2-year, 24-hour storm from each disturbed acre drained may be utilized. Where rainfall data is not available or a calculation cannot be performed, a temporary or permanent sediment basin providing 3,600 cubic feet of storage per acre drained may be provided. If a calculation is performed, then the calculation shall be included in the

SWP3. Is this information included in the SWP3? Yes No

NA (Page 31, Section F.2(c)(ii)(B))

The SWP3 Must Include A Description of Permanent Storm Water Controls

53. A description of any measures that will be installed during the construction process to control pollutants in storm water discharges that may occur after construction operations have been completed must be included in the SWP3. Permittees are only responsible for the installation and maintenance of storm water management measures prior to final stabilization of the site or prior to submission of an NOT. Are any permanent storm water controls part of this project? Yes No Are they included in this

SWP3? Yes No NA (Page 32, Section F.3)

Other Required Controls and BMPs (Section F.4)

54. Permittees shall minimize, to the extent practicable, the off-site vehicle tracking of sediments and the generation of dust. Does the SWP3 include a description of controls utilized to accomplish this requirement? Yes No (Page 32, Section

F.4(a))

55. Does the SWP3 include a description of construction and waste materials expected to be stored on-site and a description of controls to minimize pollutants from these materials?

Yes No (Page 32, Section F.4(b))

56. Does the SWP3 include a description of potential pollutant sources from areas other than construction (such as storm water discharges from dedicated asphalt plants and dedicated concrete batch plants), and a description of controls and measures that will be implemented at those sites to minimize pollutant discharges? Yes No

NA (Page 32, Section F.4(c))

57. Does the SWP3 require the Permittee to place velocity dissipation devices at discharge locations and along the length of any outfall channel (i.e., runoff conveyance) to provide a non-erosive flow velocity from the structure to a water course, so that the natural physical and biological characteristics and functions are maintained and protected?

Yes No NA (Page 32, Section F.4(d))

58. Does the SWP3 require the Permittee to design and utilize appropriate controls to minimize the offsite transport of suspended sediments and other pollutants if it is necessary to pump or channel standing water from the site? Yes No

NA (Page 32, Section F.4(e))

Documentation of Compliance with Approved State and Local Plans

59. Is the SWP3 consistent with requirements specified in applicable sediment and erosion site plans or site permits, or storm water management site plans or site permits approved by federal, state, or local officials (such as the Sheppard MS4)? Yes No

NA (Page 32, Section F.5(a))

60. Does the SWP3 identify and ensure the implementation of appropriate pollution prevention measures for all eligible non-storm water components of the discharge, as listed in Part II.A.3. of this permit? Yes No NA (Page 32, Section F.8)

61. Does the SWP3 identify that the SWP3 will be updated as necessary to remain consistent with any changes applicable to protecting surface water resources in sediment erosion site plans or site permits, or storm water management site plans or site permits approved by state or local official for which the permittee receives written notices?

Yes No (Page 32, Section F.5(b )and Page 35 Section F.7(d))

62. Does the SWP3 identify when the permittee shall perform maintenance to maintain the protective measures identified in the SWP3? Yes No (Page 32, Section

F.6(a))

63. Does the SWP3 identify when inspections will be conducted? Yes No (Page

32, Section F.7(a)(b)(c)(e))