02_-_Price_Exhibit_-_Blank_FINAL.pdf

PDF 407 KB Posted

Attached to
Asbestos & Lead Based Paint Abatement ID/IQ Federal contract opportunity
Solicitation number
FA3020-18-R-0012
Issued by
Department of the Air Force Air Education and Training Command

About this file

Blank Price Exhiibt

View the file

Other files for this federal contract opportunity

Other files attached to Asbestos & Lead Based Paint Abatement ID/IQ, newest first.
File Type Posted
Amendment_3.pdf PDF
Amendment_2.pdf PDF
RFP_FA3020-18-R-0012_Asbestos_IDIQ.pdf PDF
FA3020-18-R-0012_Amendment_1.pdf PDF
01_-_VNVP_149202_Specifications_-_SOW.pdf PDF
04_-_Past_and_Present_Performance_Questionaire_Sheet.pdf PDF
05_-_SF_LLL.pdf PDF
07_-_SWP3_Checklist.pdf PDF
03_-_TX180326Wichita.pdf PDF
02_-_Price_Exhibit_-_Blank_FINAL.xlsx XLSX spreadsheet
01_-_VNVP_149202_ACM-LBP_IDIQ_Package.pdf PDF
RFP_FA3020-18-R-0012_Asbestos_IDIQ.pdf PDF
06_-_SAFB_Form_151_-_Base_Pass.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE B

ACM/LBP IDIQ-BASIC CONTRACT PERIOD

Date Printed:

4/14/2018

Current as of:

Month Year

Page 1 of 32 Pages

PROJECT: Overhead Profit

BASE: Overhead Profit

Bond Inter period Increase

PROPOSAL SCHEDULE:

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

A1-0000 PRE-WORK REQUIREMENTS

A1-0100 State Notifications

A1-0101 State Notification and Administrative fee - Minimum $55.00, up to maximum $3,210.00

LOT 20 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

A1-0200 Submittals

A1-0201 Asbestos Abatement plans, Certifications and submittals EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A2-0000 EQUIPMENT RENTAL

A2-0100 Scaffolding A2-0110 Elevated Rolling Scaffolding (up to 20 ft. high) A2-0111 Daily Rental DY 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A2-0112 Weekly Rental WK 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A2-0113 Monthly Rental MO 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A2-0120 Steel - Tubular Stationary Scaffolding (up to 20 ft. high) Includes build and teardown A2-0121 Daily Rental DY 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A2-0122 Weekly Rental WK 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A2-0123 Monthly Rental MO 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A2-0200 Mobile Lifts A2-0210 Lift Rental, to 40 Feet Height A2-0211 Daily Rental DY 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A2-0212 Weekly Rental WK 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A2-0213 Monthly Rental MO 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A3-0000 MONITORING / SAMPLING

A3-0100 Monitoring / Sampling

A3-0101 OSHA testing, cleaned area samples, PCM air sample analysis, NIOSH 7400

EA 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A3-0102 OSHA testing, personal sampling, PCM analysis, NIOSH 7400

EA 400 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A3-0103 OSHA testing, cleaned area samples, TEM air sample analysis, NIOSH 7402

EA 50 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A3-0200 Consultants A3-0201 Industrial hygienist Day 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A3-0202 Emergency Response, respond to call within 48 hrs, contain contamination, or provide access

Day 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0000 CONTAINMENT & PREPERATION IN ASBESTOS ABATEMENT WORK AREA

A4-0100 Work area Preparation

A4-0101 Removing and relocating within facility all movable furniture, equipment, etc.

(excluding office partition units)

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0102 for Office Partition removal, add LF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0103 Preparation of ACM containment area, Danger signs

EA 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0104

Contractor's equipment and personal set-up at job site and move-out at completion of work. This cost also to include the construction and dismantling of decontamination facilities and showers

EA 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

SCHEDULE "B" – BASIC CONTRACT PERIOD

Award through 30 Sep 2019

QTYUNIT OF

MEASUREITEM

Contract Line Item Number

OTHER DIRECT COSTS Sub Contractor Prime Contractor

In the shaded spaces to the right, bidder will enter the Overhead and Profit percentages for Prime Contractor (and sub-contractors, if applicable), and the percentage for bond. Also, Bidder will enter in the shaded spaces below: Unit Material Price per line item, Unit Labor Price per line item, and Unit ODC price per line item. The quantities listed are estimated values used for determining the low offer. The successful bidder is guaranteed to receive the stated minimum total contract value of $2,500.00. The guaranteed minimum total contract value may be comprised of any combination of any of the items listed on the following pages.

Sub-Contractor

Prime Contractor VNVP 149202, Asbestos and Lead Based Paint Abatement, Indefinite Delivery, Indefinite Quantity (IDIQ) Contract

Sheppard Air Force Base, Texas 76311

GRAND TOTAL:

Date Printed:

4/14/2018

Current as of:

Month Year

Page 2 of 32 Pages

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

QTYUNIT OF

MEASUREITEM

Contract Line Item Number

OTHER DIRECT COSTS Sub Contractor Prime Contractor

A4-0105 Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 8' height

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0106 Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 12' height

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0107 for heights above 12' add SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0200 Cleaning

A4-0201 Pre-cleaning, HEPA vacuum and wet wipe, flat surfaces

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0202 Set up Neg. Air Machine EA 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0300 Cover Surfaces with Polyethylene Sheeting, Including Glue and Tape

A4-0301 Masking and sealing Walls with single layer plastic sheeting (6 mil)

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0302 for Wall Heights above 12' add SF 750 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0303 for Wall Heights above 20' add SF 750 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0304 Masking and sealing Ceilings with single layer plastic sheeting (6 mil)

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0305 Preparation of asbestos containment area, protect Special Flooring area, 2 layers 6 mil polyethylene on 3/4" plywood

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0306 Masking and sealing Floors with double layer plastic sheeting (6 mil)

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0307 Masking and sealing with double layer plastic sheeting (6 mil) to be used for windows, doors and isolation barriers

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0400 Demolition of Non-Asbestos Containing Materials A4-0401 Remove Interior Base, Rubber or Vinyl LF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0402 Remove Interior Wood Base LF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0403 Remove Interior Wood Trim LF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0404 Remove Paneling over Sheetrock SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0500 Cut Openings in Existing Non-Asbestos A4-0501 Gypsum Board, Walls SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0502 Plaster, Walls SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0503 Gypsum or Plaster, Ceilings SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0504 Concrete Masonry Walls SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A4-0600 Remove Non-ACM Interior Partition complete

A4-0601 Demolition in asbestos contaminated area, partitions, non load bearing, plaster, lath, and studs

SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0602 Demolition in asbestos contaminated area, partitions, non load bearing, gypsum board and studs

SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0700 Remove existing suspended acoustical ceiling tile

A4-0701 Remove and store existing suspended acoustical tile, grid to remain in place

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0702 Remove, clean and store existing suspended acoustical ceiling tile system complete with grid and tile

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0703 Demolition in asbestos contaminated area, Plaster and Lath ceiling, including suspension system

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0704 Demolition in asbestos contaminated area, ceiling, finished Plaster, leaving wire lath

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0705 Demolition in asbestos contaminated area, ceiling, suspended acoustical tile

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0706 Demolition in asbestos contaminated area, cemented–on or concealed spline ceiling system

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0707 Demolition in asbestos contaminated area, ceiling, gypsum board

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0708 Remove and clean 2 x 4 fluorescent Light fixtures, store in facility

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Date Printed:

4/14/2018

Current as of:

Month Year

Page 3 of 32 Pages

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

QTYUNIT OF

MEASUREITEM

Contract Line Item Number

OTHER DIRECT COSTS Sub Contractor Prime Contractor

A4-0709 Remove and clean 2 x 4 fluorescent Light fixtures, store on site

EA 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0710 Remove and clean miscellaneous fixtures, store in facility

EA 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A4-0711 Detach miscellaneous fixtures, protect in place

EA 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0000 BULK ASBESTOS CONTAINING MATERIAL REMOVAL

A5-0100 Transite Board A5-0101 Cement-asbestos Tansite Board SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-0102 Exterior Transite shingle siding SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-0200 Plaster / Drywall

A5-0201 Ceiling, including suspension system, plaster and lath

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0202 Finished plaster, leaving wire lath SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-0203 Gypsum Wallboard SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-0204 Plaster, lath, and studs SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-0205 Gypsum board and studs complete SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-0300 Ceiling Tiles A5-0301 Ceiling tiles & Mastic adhesive SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-0400 Caulking / Sealant

A5-0401 Remove & dispose of asbestos containing caulking / sealant

LF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0500 Remove Vinyl Asbestos Tile & Mastic from Floor

A5-0501 Single Layer of Vinyl Asbestos Tile and Mastic

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0502 for each additional Layer of VAT and Mastic add

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0503 Single Layer of Vinyl Composition Tile (non- ACM) & Mastic

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0504 for each additional Layers of VCT and Mastic add

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0505 Remove ACM Mastic (only) from Concrete floors

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0600 Remove VAT & Mastic on Wood Flooring

A5-0601 Single Layer of VAT and Mastic is removed. No wood flooring must be removed

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0602 Single Layer of VAT and/or Mastic is removed with wooden sub flooring

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0603 for Additional layers of VAT and Mastic add

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0604 for additional layers of wood flooring add SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0605 Remove ACM Mastic (only) from wood flooring

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0700 Remove Carpeting A5-0701 Remove carpeting from flooring SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-0800 Remove Asbestos Containing Insulation/Fire Proofing

A5-0801

Remove asbestos insulation or fire proofing from decking, beams, columns, joists or other flat structural surfaces plus any overspray. Clean thoroughly, encapsulate (use separate clin) and leave surfaces ready for new fireproofing

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0802

Remove asbestos insulation or fire proofing from irregular surfaces plus any overspray.

Clean thoroughly, encapsulate (use separate clin) and leave surfaces ready for new fireproofing

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0803 Encapsulate asbestos insulation or fire proofing on surfaces plus any over spray.

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-0900 Roofing A5-0901 Remove 3-Ply Built up Roofing SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-0902 for additional Ply's add SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Date Printed:

4/14/2018

Current as of:

Month Year

Page 4 of 32 Pages

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

QTYUNIT OF

MEASUREITEM

Contract Line Item Number

OTHER DIRECT COSTS Sub Contractor Prime Contractor

A5-0903 Remove Bituminous flashing SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-0904 Remove Shingle roofing, non-friable SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1000 Boiler Insulation

A5-1001 Remove asbestos insulation from boiler and breeching

SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-1100 Duct Insulation A5-1101 Remove Semi-Rigid Insulation SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1102 Remove Flexible Insulation SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1103 Remove Duct or AHU insulation SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-1104 Remove Duct vibration isolation joints, up to 24 square inch duct

EA 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-1105 Remove Duct vibration isolation joints, 25 square inch to 48 square inch duct

EA 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-1106 Remove Duct vibration isolation joints, 49 square inch to 76 square inch duct

EA 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A5-1200 Remove Pipe Insulation (Regular Method) A5-1201 to 4" Insulation Size (Outside Dia.) LF 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1202 to 8" Insulation Size (Outside Dia.) LF 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1203 to 12" Insulation Size (Outside Dia.) LF 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1204 to 16" Insulation Size (Outside Dia.) LF 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1205 to 20" Insulation Size (Outside Dia.) LF 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1206 over 20" Insulation Size (Outside Dia.) SF 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1300 Remove Pipe Insulation (GloveBag Method) A5-1301 to 4" Insulation Size (Outside Dia.) LF 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1302 to 8" Insulation Size (Outside Dia.) LF 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1303 to 12" Insulation Size (Outside Dia.) LF 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1304 to 16" Insulation Size (Outside Dia.) LF 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1305 to 20" Insulation Size (Outside Dia.) LF 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1306 over 20" Insulation Size (Outside Dia.) SF 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1400 Remove Pipe Fittings (I.e., valves, flanges, tees and other fittings). Use only if pipe insulation remains (Regular Method) A5-1401 to 4" Insulation Size (Outside Dia.) EA 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1402 to 8" Insulation Size (Outside Dia.) EA 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1403 to 12" Insulation Size (Outside Dia.) EA 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1404 to 16" Insulation Size (Outside Dia.) EA 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1405 to 20" Insulation Size (Outside Dia.) EA 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1406 over 20" Insulation Size (Outside Dia.) SF 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1500 Remove Pipe Fittings (I.e., valves, flanges, tees and other fittings). Use only if pipe insulation remains (GloveBag Method) A5-1501 to 4" Insulation Size (Outside Dia.) EA 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1502 to 8" Insulation Size (Outside Dia.) EA 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1503 to 12" Insulation Size (Outside Dia.) EA 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1504 to 16" Insulation Size (Outside Dia.) EA 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1505 to 20" Insulation Size (Outside Dia.) EA 75 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1506 over 20" Insulation Size (Outside Dia.) SF 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1600 Remove fiberglass Batt insulation above ceiling A5-1601 If Construction Debris SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A5-1602 If Asbestos Waste SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A6-0000 DECONTAMINATION OF ASBESTOS WITH ENCAPSULANT

A6-0100 Decontamination

A6-0101 Spray exposed substrate with surfactant (bridging), flat surfaces

S.F. 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A6-0102 Spray exposed substrate with surfactant (bridging), irregular surfaces

S.F. 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A6-0103 Spray exposed substrate with surfactant (bridging), pipes, beams, and columns

L.F. 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A6-0104 Spray encapsulate polyethylene sheeting S.F. 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A6-0105 Roll down polyethylene sheeting S.F. 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A6-0106 Bag polyethylene sheeting Ea. 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A6-0107 Fine clean exposed substrate, with nylon brush

S.F. 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A6-0108 Wet wipe substrate S.F. 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A6-0109 Fine clean exposed substrate, vacuum surfaces, fine brush

S.F. 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A6-0110 HEPA vacuum, shampoo carpeting S.F. 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A6-0111 Final cleaning of protected surfaces S.F. 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0000 REMOVAL OF LEAD BASED PAINT (LBP)

A7-0100 Pre-Work

Date Printed:

4/14/2018

Current as of:

Month Year

Page 5 of 32 Pages

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

QTYUNIT OF

MEASUREITEM

Contract Line Item Number

OTHER DIRECT COSTS Sub Contractor Prime Contractor

A7-0101 Lead paint remediation plans and methods, lead abatement remediation plan

EA 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0102 Preparation of lead containment area, lead abatement work area, caution sign

EA 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0200 Cleaning

A7-0201 Preparation of lead containment area, pre-cleaning, HEPA vacuum and wet wipe, floor and wall surfaces

S.F. 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0202 Preparation of lead containment area, pre-cleaning, HEPA vacuum and wet wipe, ceiling, to 11' high

S.F. 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0203 Preparation of lead containment area, pre-cleaning, HEPA vacuum and wet wipe, ceiling, . to 15' high

S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0204 Preparation of lead containment area, pre-cleaning, HEPA vacuum and wet wipe, ceiling, over 15' high

S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0300 Containment

A7-0301 Preparation of lead containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil

S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0302 Preparation of lead containment area, cover surfaces with polyethylene sheeting, walls, each layer, 6 mil

S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0303 Preparation of lead containment area, for heights above 12', add

S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0304 Preparation of lead containment area, post abatement cleaning of protective sheeting, HEPA vacuum and wet wipe

S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0400 Encapsulation

A7-0401 Encapsulation of lead-based paint, interior, brushwork, trim, under 6"

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0402 Encapsulation of lead-based paint, interior, brushwork, trim, 6" to 12" wide

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0403 Encapsulation of lead-based paint, interior, brushwork, balustrades

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0404 Encapsulation of lead-based paint, interior, brushwork, pipe, to 4" diameter

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0405 Encapsulation of lead-based paint, interior, brushwork, pipe, to 8" diameter

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0406 Encapsulation of lead-based paint, interior, brushwork, pipe, to 12" diameter

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0407 Encapsulation of lead-based paint, interior, brushwork, pipe, to 16" diameter

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0408 Encapsulation of lead-based paint, miscellaneous, steel, flat surfaces

S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0409 Encapsulation of lead-based paint, miscellaneous, steel, beams, brushwork

S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0410 Encapsulation of lead-based paint, miscellaneous, steel, trusses

S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0411 for color encapsulate, add % % 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A7-0500 Removal

A7-0501 Removal of lead-based paint, baseboard, to 6" wide

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0502 Removal of lead-based paint, baseboard, to 12" wide

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0503 Removal of lead-based paint, balustrades, one side

S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0504 Removal of lead-based paint from doors S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0505 Removal of lead-based paint, from door frames, trim to 6"

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0506 Removal of lead-based paint, handrails L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0507 Removal of lead-based paint, pipes, to 4" diameter

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Date Printed:

4/14/2018

Current as of:

Month Year

Page 6 of 32 Pages

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

QTYUNIT OF

MEASUREITEM

Contract Line Item Number

OTHER DIRECT COSTS Sub Contractor Prime Contractor

A7-0508 Removal of lead-based paint, pipes, to 8" diameter

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0509 Removal of lead-based paint, pipes, to 12" diameter

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0510 Removal of lead-based paint, to 16" diameter

L.F. 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0511 Removal of lead-based paint, for pipe hangers, add

EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0512 Removal of lead-based paint, siding S.F. 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0513 Removal of lead-based paint, trusses, open SF Face 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0514 Removal of lead-based paint, Window Glazing, one side only

SF Face 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A7-0515 Removal of lead-based paint, frame and trim LF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A8-0000 REINSTALL ITEMS (INCLUDES CLEANING)

A8-0100 Reinstallation

A8-0101 Re-install existing 2 x 4 fluorescent light fixture

EA 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A8-0102 Re-install existing incandescent light fixture and/or accessories

EA 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A8-0103 Re-install existing suspended acoustical ceiling tiles in existing grid

SF 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A8-0104 Reinstall all movable furniture, equipment, etc. after work is complete (excluding office partition units)

Day 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A9-0000 WASTE PACKAGING, HANDLING AND DISPOSAL

A9-0100 Packaging

A9-0101 Collect and bag bulk material, 3 C.F. bags, by hand

EA 500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A9-0102 for double bag and decontaminate, add EA 500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A9-0103 Containerize bagged material in drums, per 3 C.F. drum

EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A9-0200 Disposal

A9-0201 Asbestos waste disposal charges, including haul

C.Y. 400 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A9-0202 Disposal of Construction Materials (CM), haul and dispose

C.Y. 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0000 NEW FINISH WORK

A10-0100 Base & Flooring

A10-0101 Install Base Cove, Rubber or Vinyl, Standard Colors, 4-6" high

LF 500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0102 Provide & Install Vinyl Flooring SF 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0103 Provide & Install Carpet Flooring SF 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0200 Gypsum Board

A10-0201 Install new 5/8" Type 'X' Sheetrock Gypsum Board

SF 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0202 Provide & Install new 5/8" Moisture & Mold resistant Gypsum Board

SF 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0203 Skim coat wall existing wall surface SF 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0300 Ceilings

A10-0301 Install New Acoustical Ceiling tiles which are Government supplied, in existing grid system

SF 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0302 Re-Install Acoustical Ceiling tiles and install in existing grid system

SF 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0303 Provide & Install New 24" x 24" Tegular Acoustical Ceiling tiles and Suspension system

SF 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0304 Provide & Install New 24" x 48" Acoustical Ceiling tiles and Suspension system

SF 1,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0400 Painting A10-0401 Prepare & Paint Metal Door Frame EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0402 Prepare & Paint Metal Door EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0403 Prepare & Texture (Level 4), Walls, Ceilings, Drywall

SF 200 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Date Printed:

4/14/2018

Current as of:

Month Year

Page 7 of 32 Pages

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

QTYUNIT OF

MEASUREITEM

Contract Line Item Number

OTHER DIRECT COSTS Sub Contractor Prime Contractor

A10-0404 Prepare and Paint Metal Railings and Rails LF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0405 Prepare and Paint Handrail, Inc attachments LF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0406 Prepare and Paint Pipes up To 4" Diameter, including supports

LF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0407 Prepare and paint pipes 5" to 8" Diameter, including supports

LF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0408 Prepare and paint pipes Over 8" Diameter, including supports

LF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0409 Prepare and paint other ferrous metal surfaces

SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0500 HVAC Duct Work

A10-0501 Semi-rigid 1-1/2" thick fiberglass board of 3

lb. Density

SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0502 Flexible 2" thick fiberglass duct insulation of 3 lb. Density

SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0600 Boiler/Tank/Chiller Insulation A10-0601 1" thick insulation SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0602 1-1/2" thick insulation SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0603

Insulate Boilers, Breeching, Chillers or Tanks complete with 1-1/2" thick calcium silicate block, complete with banding, clips etc.

SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-0700 Sprayed-on Fireproofing A10-0701 1-Hr fire-rated F/P SF 400 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0702 2-Hr fire-rated F/P SF 400 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0703 3-Hr fire-rated F/P SF 400 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0704 4-Hr fire-rated F/P SF 400 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0705 Application of F/P Sealant SF 400 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0800 1" Fiberglass Pipe Insulation, with All Service Jacket (25 ASJ/SSL) A10-0801 1-1/2" and below Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0802 2" to 3-1/2" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0803 4" to 6" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0804 7" to 8" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0805 10" to 12" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0806 14" to 16" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0807 18" to 20" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0808 Over 20" Dia. Pipe size SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0900 1-1/2" Fiberglass Pipe Insulation, with All Service Jacket (25 ASJ/SSL) A10-0901 1-1/2" and below Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0902 2" to 3-1/2" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0903 4" to 6" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0904 7" to 8" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0905 10" to 12" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0906 14" to 16" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0907 18" to 20" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-0908 Over 20" Dia. Pipe size SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1000 2" Fiberglass Pipe Insulation, with All Service Jacket (25 ASJ/SSL) A10-1001 1-1/2" and below Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1002 2" to 3-1/2" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1003 4" to 6" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1004 7" to 8" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1005 10" to 12" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1006 14" to 16" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1007 18" to 20" Dia. Pipe size LF 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1008 Over 20" Dia. Pipe size SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1100 1" Fiberglass Fitting & Flange Insulation, with All Service Jacket (25 ASJ/SSL)

A10-1101 1-1/2" and Below Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1102 1-1/2" and Below Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1103 2" to 3-1/2" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1104 2" to 3-1/2" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1105 4" to 6" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1106 4" to 6" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1107 7" to 8" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Date Printed:

4/14/2018

Current as of:

Month Year

Page 8 of 32 Pages

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

QTYUNIT OF

MEASUREITEM

Contract Line Item Number

OTHER DIRECT COSTS Sub Contractor Prime Contractor

A10-1108 7" to 8" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1109 10" to 12" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1110 10" to 12" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1111 14" to 16" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1112 14" to 16" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1113 18" to 20" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1114 18" to 20" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1115 Over 20" Dia. Pipe size - Fitting -calculated at (3.14 x Dia. in feet) x 4 feet

SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1200 1-1/2" Fiberglass Fitting & Flange Insulation, with All Service Jacket (25 ASJ/SSL)

A10-1201 1-1/2" and Below Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1202 1-1/2" and Below Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1203 2" to 3-1/2" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1204 2" to 3-1/2" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1205 4" to 6" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1206 4" to 6" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1207 7" to 8" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1208 7" to 8" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1209 10" to 12" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1210 10" to 12" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1211 14" to 16" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1212 14" to 16" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1213 18" to 20" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1214 18" to 20" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1215 Over 20" Dia. Pipe size - Fitting -calculated at (3.14 x Dia. in feet) x 4 feet

SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1300 2" Fiberglass Fitting & Flange Insulation, with All Service Jacket (25 ASJ/SSL)

A10-1301 1-1/2" and Below Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1302 1-1/2" and Below Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1303 2" to 3-1/2" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1304 2" to 3-1/2" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1305 4" to 6" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1306 4" to 6" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1307 7" to 8" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1308 7" to 8" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1309 10" to 12" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1310 10" to 12" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1311 14" to 16" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1312 14" to 16" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1313 18" to 20" Dia. Pipe size - Fitting EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A10-1314 18" to 20" Dia. Pipe size - Flange EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

A10-1315 Over 20" Dia. Pipe size - Fitting -calculated at (3.14 x Dia. in feet) x 4 feet

SF 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

-$ BASIC CONTRACT PERIOD - GRAND TOTAL

ACM/LBP IDIQ-FIRST CONTRACT OPTION PERIOD

Date Printed:

4/14/2018

Current as of:

Month Year

Page 9 of 32 Pages

PROJECT: Overhead 0.00% Profit 0.00%

BASE: Overhead 0.00% Profit 0.00%

Bond 0.00% Inter period Increase

0.00%

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

B1-0000 PRE-WORK REQUIREMENTS

B1-0100 State Notifications

B1-0101 State Notification and Administrative fee - Minimum $55.00, up to maximum $3,210.00

LOT 20 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

B1-0200 Submittals

B1-0201 Asbestos Abatement plans, Certifications and submittals EA 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B2-0000 EQUIPMENT RENTAL

B2-0100 Scaffolding B2-0110 Elevated Rolling Scaffolding (up to 20 ft. high) B2-0111 Daily Rental DY 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B2-0112 Weekly Rental WK 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B2-0113 Monthly Rental MO 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A2-0120 Steel - Tubular Stationary Scaffolding (up to 20 ft. high) Includes build and teardown B2-0121 Daily Rental DY 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B2-0122 Weekly Rental WK 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B2-0123 Monthly Rental MO 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B2-0200 Mobile Lifts B2-0210 Lift Rental, to 40 Feet Height B2-0211 Daily Rental DY 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B2-0212 Weekly Rental WK 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B2-0213 Monthly Rental MO 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B3-0000 MONITORING / SAMPLING

B3-0100 Monitoring / Sampling

B3-0101 OSHA testing, cleaned area samples, PCM air sample analysis, NIOSH 7400

EA 100 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B3-0102 OSHA testing, personal sampling, PCM analysis, NIOSH 7400

EA 400 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B3-0103 OSHA testing, cleaned area samples, TEM air sample analysis, NIOSH 7402

EA 50 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B3-0200 Consultants B3-0201 Industrial hygienist Day 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B3-0202 Emergency Response, respond to call within 48 hrs, contain contamination, or provide access

Day 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0000 CONTAINMENT & PREPERATION IN ASBESTOS ABATEMENT WORK AREA

B4-0100 Work area Preparation

B4-0101 Removing and relocating within facility all movable furniture, equipment, etc.

(excluding office partition units)

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0102 for Office Partition removal, add LF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0103 Preparation of ACM containment area, Danger signs

EA 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0104

Contractor's equipment and personal set-up at job site and move-out at completion of work. This cost also to include the construction and dismantling of decontamination facilities and showers

EA 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0105 Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 8' height

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0106 Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 12' height

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

SCHEDULE "B" – FIRST CONTRACT OPTION PERIOD

01 Oct 2019 through 30 Sep 2020

Sub-Contractor VNVP 149202, Asbestos and Lead Based Paint Abatement, Indefinite Delivery, Indefinite Quantity (IDIQ) Contract

Prime Contractor Sheppard Air Force Base, Texas 76311

Prime Contractor

Contract Line Item Number

ITEM UNIT OF

MEASURE QTY

OTHER DIRECT COSTS Sub Contractor

GRAND TOTAL:

Date Printed:

4/14/2018

Current as of:

Month Year

Page 10 of 32 Pages

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

Prime ContractorContract Line Item Number

ITEM UNIT OF

MEASURE QTY

OTHER DIRECT COSTS Sub Contractor

B4-0107 for heights above 12' add SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0200 Cleaning

B4-0201 Pre-cleaning, HEPA vacuum and wet wipe, flat surfaces

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0202 Set up Neg. Air Machine EA 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0300 Cover Surfaces with Polyethylene Sheeting, Including Glue and Tape

B4-0301 Masking and sealing Walls with single layer plastic sheeting (6 mil)

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0302 for Wall Heights above 12' add SF 750 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0303 for Wall Heights above 20' add SF 750 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0304 Masking and sealing Ceilings with single layer plastic sheeting (6 mil)

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0305 Preparation of asbestos containment area, protect Special Flooring area, 2 layers 6 mil polyethylene on 3/4" plywood

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0306 Masking and sealing Floors with double layer plastic sheeting (6 mil)

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0307 Masking and sealing with double layer plastic sheeting (6 mil) to be used for windows, doors and isolation barriers

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0400 Demolition of Non-Asbestos Containing Materials B4-0401 Remove Interior Base, Rubber or Vinyl LF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0402 Remove Interior Wood Base LF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0403 Remove Interior Wood Trim LF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0404 Remove Paneling over Sheetrock SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0500 Cut Openings in Existing Non-Asbestos Containing Materials for access to ACM B4-0501 Gypsum Board, Walls SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0502 Plaster, Walls SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0503 Gypsum or Plaster, Ceilings SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0504 Concrete Masonry Walls SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B4-0600 Remove Non-ACM Interior Partition complete

B4-0601 Demolition in asbestos contaminated area, partitions, non load bearing, plaster, lath, and studs

SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0602 Demolition in asbestos contaminated area, partitions, non load bearing, gypsum board and studs

SF 300 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0700 Remove existing suspended acoustical ceiling tile

B4-0701 Remove and store existing suspended acoustical tile, grid to remain in place

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0702 Remove, clean and store existing suspended acoustical ceiling tile system complete with grid and tile

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0703 Demolition in asbestos contaminated area, Plaster and Lath ceiling, including suspension system

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0704 Demolition in asbestos contaminated area, ceiling, finished Plaster, leaving wire lath

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0705 Demolition in asbestos contaminated area, ceiling, suspended acoustical tile

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0706 Demolition in asbestos contaminated area, cemented–on or concealed spline ceiling system

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0707 Demolition in asbestos contaminated area, ceiling, gypsum board

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0708 Remove and clean 2 x 4 fluorescent Light fixtures, store in facility

SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0709 Remove and clean 2 x 4 fluorescent Light fixtures, store on site

EA 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0710 Remove and clean miscellaneous fixtures, store in facility

EA 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B4-0711 Detach miscellaneous fixtures, protect in place

EA 150 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B5-0000 BULK ASBESTOS CONTAINING MATERIAL REMOVAL

B5-0100 Transite Board

Date Printed:

4/14/2018

Current as of:

Month Year

Page 11 of 32 Pages

MATERIAL COST LABOR COST LINE CLIN

Unit Material TOTAL Unit Labor TOTAL Unit ODC TOTAL With Overhead Included

With Profit Included

With Overhead Included

With Profit Incuded

With Bond Included TOTAL UNIT PRICE

Prime ContractorContract Line Item Number

ITEM UNIT OF

MEASURE QTY

OTHER DIRECT COSTS Sub Contractor

B5-0101 Cement-asbestos Tansite Board SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B5-0102 Exterior Transite shingle siding SF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B5-0200 Plaster / Drywall

B5-0201 Ceiling, including suspension system, plaster and lath

SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B5-0202 Finished plaster, leaving wire lath SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B5-0203 Gypsum Wallboard SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B5-0204 Plaster, lath, and studs SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B5-0205 Gypsum board and studs complete SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B5-0300 Ceiling Tiles B5-0301 Ceiling tiles & Mastic adhesive SF 3,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ B5-0400 Caulking / Sealant

B5-0401 Remove & dispose of asbestos containing caulking / sealant

LF 1,500 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B5-0500 Remove Vinyl Asbestos Tile & Mastic from Floor

B5-0501 Single Layer of Vinyl Asbestos Tile and Mastic

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B5-0502 for each additional Layer of VAT and Mastic add

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B5-0503 Single Layer of Vinyl Composition Tile (non- ACM) & Mastic

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B5-0504 for each additional Layers of VCT and Mastic add

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B5-0505 Remove ACM Mastic (only) from Concrete floors

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

B5-0600 Remove VAT & Mastic on Wood Flooring

B5-0601 Single Layer of VAT and Mastic is removed. No wood flooring must be removed

SF 15,000 -$ -$ -$ -$ -$ -$ -$ -$ -$

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.