02_-_Price_Exhibit_-_Blank_FINAL.xlsx

XLSX spreadsheet 203 KB Posted

Attached to
Asbestos & Lead Based Paint Abatement ID/IQ Federal contract opportunity
Solicitation number
FA3020-18-R-0012
Issued by
Department of the Air Force Air Education and Training Command

About this file

Blank Price Exhibit in Excel

View the file

Other files for this federal contract opportunity

Other files attached to Asbestos & Lead Based Paint Abatement ID/IQ, newest first.
File Type Posted
Amendment_3.pdf PDF
Amendment_2.pdf PDF
RFP_FA3020-18-R-0012_Asbestos_IDIQ.pdf PDF
FA3020-18-R-0012_Amendment_1.pdf PDF
01_-_VNVP_149202_Specifications_-_SOW.pdf PDF
02_-_Price_Exhibit_-_Blank_FINAL.pdf PDF
01_-_VNVP_149202_ACM-LBP_IDIQ_Package.pdf PDF
RFP_FA3020-18-R-0012_Asbestos_IDIQ.pdf PDF
06_-_SAFB_Form_151_-_Base_Pass.pdf PDF
04_-_Past_and_Present_Performance_Questionaire_Sheet.pdf PDF
05_-_SF_LLL.pdf PDF
07_-_SWP3_Checklist.pdf PDF
03_-_TX180326Wichita.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

A$ - 0
B$ - 0
C$ - 0
D$ - 0
$ - 0

A - Basic Year

SCHEDULE "B" – BASIC CONTRACT PERIOD

Award through 30 Sep 2019

Sub-Contractor
PROJECT:VNVP 149202, Asbestos and Lead Based Paint Abatement, Indefinite Delivery, Indefinite Quantity (IDIQ) ContractOverheadProfit
Prime Contractor
BASE:Sheppard Air Force Base, Texas 76311OverheadProfit
BondInter period Increase
PROPOSAL SCHEDULE:In the shaded spaces to the right, bidder will enter the Overhead and Profit percentages for Prime Contractor (and sub-contractors, if applicable), and the percentage for bond. Also, Bidder will enter in the shaded spaces below: Unit Material Price per line item, Unit Labor Price per line item, and Unit ODC price per line item. The quantities listed are estimated values used for determining the low offer. The successful bidder is guaranteed to receive the stated minimum total contract value of $2,500.00. The guaranteed minimum total contract value may be comprised of any combination of any of the items listed on the following pages.GRAND TOTAL:$ - 0
Contract Line Item NumberITEMUNIT OF MEASUREQTYMATERIAL COSTLABOR COSTOTHER DIRECT COSTSSub ContractorPrime ContractorLINECLINLINE
Unit MaterialTOTALUnit LaborTOTALUnit ODCTOTALWith Overhead IncludedWith Profit IncludedWith Overhead IncludedWith Profit IncudedWith Bond IncludedTOTALUNIT PRICETOTAL
A1-0000PRE-WORK REQUIREMENTS
A1-0100State Notifications
A1-0101State Notification and Administrative fee - Minimum $55.00, up to maximum $3,210.00LOT20N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
A1-0200Submittals
A1-0201Asbestos Abatement plans, Certifications and submittalsEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A2-0000EQUIPMENT RENTAL
A2-0100Scaffolding
A2-0110Elevated Rolling Scaffolding (up to 20 ft. high)
A2-0111Daily RentalDY28$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A2-0112Weekly RentalWK8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A2-0113Monthly RentalMO4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A2-0120Steel - Tubular Stationary Scaffolding (up to 20 ft. high) Includes build and teardown
A2-0121Daily RentalDY28$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A2-0122Weekly RentalWK8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A2-0123Monthly RentalMO4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A2-0200Mobile Lifts
A2-0210Lift Rental, to 40 Feet Height
A2-0211Daily RentalDY28$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A2-0212Weekly RentalWK8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A2-0213Monthly RentalMO4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A3-0000MONITORING / SAMPLING
A3-0100Monitoring / Sampling
A3-0101OSHA testing, cleaned area samples, PCM air sample analysis, NIOSH 7400EA100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A3-0102OSHA testing, personal sampling, PCM analysis, NIOSH 7400EA400$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A3-0103OSHA testing, cleaned area samples, TEM air sample analysis, NIOSH 7402EA50$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A3-0200Consultants
A3-0201Industrial hygienistDay2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A3-0202Emergency Response, respond to call within 48 hrs, contain contamination, or provide accessDay2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0000CONTAINMENT & PREPERATION IN ASBESTOS ABATEMENT WORK AREA
A4-0100Work area Preparation
A4-0101Removing and relocating within facility all movable furniture, equipment, etc. (excluding office partition units)SF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0102for Office Partition removal, addLF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0103Preparation of ACM containment area, Danger signsEA30$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0104Contractor's equipment and personal set-up at job site and move-out at completion of work. This cost also to include the construction and dismantling of decontamination facilities and showersEA30$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0105Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 8' heightSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0106Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 12' heightSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0107for heights above 12' addSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0200Cleaning
A4-0201Pre-cleaning, HEPA vacuum and wet wipe, flat surfacesSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0202Set up Neg. Air MachineEA30$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0300Cover Surfaces with Polyethylene Sheeting, Including Glue and Tape
A4-0301Masking and sealing Walls with single layer plastic sheeting (6 mil)SF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0302for Wall Heights above 12' addSF750$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0303for Wall Heights above 20' addSF750$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0304Masking and sealing Ceilings with single layer plastic sheeting (6 mil)SF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0305Preparation of asbestos containment area, protect Special Flooring area, 2 layers 6 mil polyethylene on 3/4" plywoodSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0306Masking and sealing Floors with double layer plastic sheeting (6 mil)SF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0307Masking and sealing with double layer plastic sheeting (6 mil) to be used for windows, doors and isolation barriersSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0400Demolition of Non-Asbestos Containing Materials
A4-0401Remove Interior Base, Rubber or VinylLF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0402Remove Interior Wood BaseLF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0403Remove Interior Wood TrimLF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0404Remove Paneling over SheetrockSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0500Cut Openings in Existing Non-Asbestos Containing Materials for access to ACM
A4-0501Gypsum Board, WallsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0502Plaster, WallsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0503Gypsum or Plaster, CeilingsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0504Concrete Masonry WallsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0600Remove Non-ACM Interior Partition complete
A4-0601Demolition in asbestos contaminated area, partitions, non load bearing, plaster, lath, and studsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0602Demolition in asbestos contaminated area, partitions, non load bearing, gypsum board and studsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0700Remove existing suspended acoustical ceiling tile
A4-0701Remove and store existing suspended acoustical tile, grid to remain in placeSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0702Remove, clean and store existing suspended acoustical ceiling tile system complete with grid and tileSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0703Demolition in asbestos contaminated area, Plaster and Lath ceiling, including suspension systemSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0704Demolition in asbestos contaminated area, ceiling, finished Plaster, leaving wire lathSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0705Demolition in asbestos contaminated area, ceiling, suspended acoustical tileSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0706Demolition in asbestos contaminated area, cemented–on or concealed spline ceiling systemSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0707Demolition in asbestos contaminated area, ceiling, gypsum boardSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0708Remove and clean 2 x 4 fluorescent Light fixtures, store in facilitySF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0709Remove and clean 2 x 4 fluorescent Light fixtures, store on siteEA150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0710Remove and clean miscellaneous fixtures, store in facilityEA150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A4-0711Detach miscellaneous fixtures, protect in placeEA150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0000BULK ASBESTOS CONTAINING MATERIAL REMOVAL
A5-0100Transite Board
A5-0101Cement-asbestos Tansite BoardSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0102Exterior Transite shingle sidingSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0200Plaster / Drywall
A5-0201Ceiling, including suspension system, plaster and lathSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0202Finished plaster, leaving wire lathSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0203Gypsum WallboardSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0204Plaster, lath, and studsSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0205Gypsum board and studs completeSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0300Ceiling Tiles
A5-0301Ceiling tiles & Mastic adhesiveSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0400Caulking / Sealant
A5-0401Remove & dispose of asbestos containing caulking / sealantLF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0500Remove Vinyl Asbestos Tile & Mastic from Floor
A5-0501Single Layer of Vinyl Asbestos Tile and MasticSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0502for each additional Layer of VAT and Mastic addSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0503Single Layer of Vinyl Composition Tile (non-ACM) & MasticSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0504for each additional Layers of VCT and Mastic addSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0505Remove ACM Mastic (only) from Concrete floorsSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0600Remove VAT & Mastic on Wood Flooring
A5-0601Single Layer of VAT and Mastic is removed. No wood flooring must be removedSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0602Single Layer of VAT and/or Mastic is removed with wooden sub flooringSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0603for Additional layers of VAT and Mastic addSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0604for additional layers of wood flooring addSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0605Remove ACM Mastic (only) from wood flooringSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0700Remove Carpeting
A5-0701Remove carpeting from flooringSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0800Remove Asbestos Containing Insulation/Fire Proofing
A5-0801Remove asbestos insulation or fire proofing from decking, beams, columns, joists or other flat structural surfaces plus any overspray. Clean thoroughly, encapsulate (use separate clin) and leave surfaces ready for new fireproofingSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0802Remove asbestos insulation or fire proofing from irregular surfaces plus any overspray. Clean thoroughly, encapsulate (use separate clin) and leave surfaces ready for new fireproofingSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0803Encapsulate asbestos insulation or fire proofing on surfaces plus any over spray.SF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0900Roofing
A5-0901Remove 3-Ply Built up RoofingSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0902for additional Ply's addSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0903Remove Bituminous flashingSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-0904Remove Shingle roofing, non-friableSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1000Boiler Insulation
A5-1001Remove asbestos insulation from boiler and breechingSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1100Duct Insulation
A5-1101Remove Semi-Rigid InsulationSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1102Remove Flexible InsulationSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1103Remove Duct or AHU insulationSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1104Remove Duct vibration isolation joints, up to 24 square inch ductEA30$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1105Remove Duct vibration isolation joints, 25 square inch to 48 square inch ductEA30$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1106Remove Duct vibration isolation joints, 49 square inch to 76 square inch ductEA30$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1200Remove Pipe Insulation (Regular Method)
A5-1201to 4" Insulation Size (Outside Dia.)LF75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1202to 8" Insulation Size (Outside Dia.)LF75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1203to 12" Insulation Size (Outside Dia.)LF75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1204to 16" Insulation Size (Outside Dia.)LF75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1205to 20" Insulation Size (Outside Dia.)LF75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1206over 20" Insulation Size (Outside Dia.)SF150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1300Remove Pipe Insulation (GloveBag Method)
A5-1301to 4" Insulation Size (Outside Dia.)LF75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1302to 8" Insulation Size (Outside Dia.)LF75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1303to 12" Insulation Size (Outside Dia.)LF75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1304to 16" Insulation Size (Outside Dia.)LF75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1305to 20" Insulation Size (Outside Dia.)LF75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1306over 20" Insulation Size (Outside Dia.)SF150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1400Remove Pipe Fittings (I.e., valves, flanges, tees and other fittings). Use only if pipe insulation remains (Regular Method)
A5-1401to 4" Insulation Size (Outside Dia.)EA75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1402to 8" Insulation Size (Outside Dia.)EA75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1403to 12" Insulation Size (Outside Dia.)EA75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1404to 16" Insulation Size (Outside Dia.)EA75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1405to 20" Insulation Size (Outside Dia.)EA75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1406over 20" Insulation Size (Outside Dia.)SF150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1500Remove Pipe Fittings (I.e., valves, flanges, tees and other fittings). Use only if pipe insulation remains (GloveBag Method)
A5-1501to 4" Insulation Size (Outside Dia.)EA75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1502to 8" Insulation Size (Outside Dia.)EA75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1503to 12" Insulation Size (Outside Dia.)EA75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1504to 16" Insulation Size (Outside Dia.)EA75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1505to 20" Insulation Size (Outside Dia.)EA75$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1506over 20" Insulation Size (Outside Dia.)SF150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1600Remove fiberglass Batt insulation above ceiling
A5-1601If Construction DebrisSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A5-1602If Asbestos WasteSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0000DECONTAMINATION OF ASBESTOS WITH ENCAPSULANT
A6-0100Decontamination
A6-0101Spray exposed substrate with surfactant (bridging), flat surfacesS.F.3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0102Spray exposed substrate with surfactant (bridging), irregular surfacesS.F.3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0103Spray exposed substrate with surfactant (bridging), pipes, beams, and columnsL.F.1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0104Spray encapsulate polyethylene sheetingS.F.3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0105Roll down polyethylene sheetingS.F.3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0106Bag polyethylene sheetingEa.150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0107Fine clean exposed substrate, with nylon brushS.F.3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0108Wet wipe substrateS.F.3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0109Fine clean exposed substrate, vacuum surfaces, fine brushS.F.3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0110HEPA vacuum, shampoo carpetingS.F.3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A6-0111Final cleaning of protected surfacesS.F.3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0000REMOVAL OF LEAD BASED PAINT (LBP)
A7-0100Pre-Work
A7-0101Lead paint remediation plans and methods, lead abatement remediation planEA10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0102Preparation of lead containment area, lead abatement work area, caution signEA10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0200Cleaning
A7-0201Preparation of lead containment area, pre-cleaning, HEPA vacuum and wet wipe, floor and wall surfacesS.F.1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0202Preparation of lead containment area, pre-cleaning, HEPA vacuum and wet wipe, ceiling, to 11' highS.F.1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0203Preparation of lead containment area, pre-cleaning, HEPA vacuum and wet wipe, ceiling, . to 15' highS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0204Preparation of lead containment area, pre-cleaning, HEPA vacuum and wet wipe, ceiling, over 15' highS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0300Containment
A7-0301Preparation of lead containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 milS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0302Preparation of lead containment area, cover surfaces with polyethylene sheeting, walls, each layer, 6 milS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0303Preparation of lead containment area, for heights above 12', addS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0304Preparation of lead containment area, post abatement cleaning of protective sheeting, HEPA vacuum and wet wipeS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0400Encapsulation
A7-0401Encapsulation of lead-based paint, interior, brushwork, trim, under 6"L.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0402Encapsulation of lead-based paint, interior, brushwork, trim, 6" to 12" wideL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0403Encapsulation of lead-based paint, interior, brushwork, balustradesL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0404Encapsulation of lead-based paint, interior, brushwork, pipe, to 4" diameterL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0405Encapsulation of lead-based paint, interior, brushwork, pipe, to 8" diameterL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0406Encapsulation of lead-based paint, interior, brushwork, pipe, to 12" diameterL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0407Encapsulation of lead-based paint, interior, brushwork, pipe, to 16" diameterL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0408Encapsulation of lead-based paint, miscellaneous, steel, flat surfacesS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0409Encapsulation of lead-based paint, miscellaneous, steel, beams, brushworkS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0410Encapsulation of lead-based paint, miscellaneous, steel, trussesS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0411for color encapsulate, add %%2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0500Removal
A7-0501Removal of lead-based paint, baseboard, to 6" wideL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0502Removal of lead-based paint, baseboard, to 12" wideL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0503Removal of lead-based paint, balustrades, one sideS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0504Removal of lead-based paint from doorsS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0505Removal of lead-based paint, from door frames, trim to 6"L.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0506Removal of lead-based paint, handrailsL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0507Removal of lead-based paint, pipes, to 4" diameterL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0508Removal of lead-based paint, pipes, to 8" diameterL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0509Removal of lead-based paint, pipes, to 12" diameterL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0510Removal of lead-based paint, to 16" diameterL.F.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0511Removal of lead-based paint, for pipe hangers, addEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0512Removal of lead-based paint, sidingS.F.200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0513Removal of lead-based paint, trusses, openSF Face200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0514Removal of lead-based paint, Window Glazing, one side onlySF Face200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A7-0515Removal of lead-based paint, frame and trimLF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A8-0000REINSTALL ITEMS (INCLUDES CLEANING)
A8-0100Reinstallation
A8-0101Re-install existing 2 x 4 fluorescent light fixtureEA100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A8-0102Re-install existing incandescent light fixture and/or accessoriesEA100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A8-0103Re-install existing suspended acoustical ceiling tiles in existing gridSF1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A8-0104Reinstall all movable furniture, equipment, etc. after work is complete (excluding office partition units)Day10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A9-0000WASTE PACKAGING, HANDLING AND DISPOSAL
A9-0100Packaging
A9-0101Collect and bag bulk material, 3 C.F. bags, by handEA500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A9-0102for double bag and decontaminate, addEA500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A9-0103Containerize bagged material in drums, per 3 C.F. drumEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A9-0200Disposal
A9-0201Asbestos waste disposal charges, including haulC.Y.400$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A9-0202Disposal of Construction Materials (CM), haul and disposeC.Y.20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0000NEW FINISH WORK
A10-0100Base & Flooring
A10-0101Install Base Cove, Rubber or Vinyl, Standard Colors, 4-6" highLF500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0102Provide & Install Vinyl FlooringSF1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0103Provide & Install Carpet FlooringSF1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0200Gypsum Board
A10-0201Install new 5/8" Type 'X' Sheetrock Gypsum BoardSF1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0202Provide & Install new 5/8" Moisture & Mold resistant Gypsum BoardSF1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0203Skim coat wall existing wall surfaceSF1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0300Ceilings
A10-0301Install New Acoustical Ceiling tiles which are Government supplied, in existing grid systemSF1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0302Re-Install Acoustical Ceiling tiles and install in existing grid systemSF1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0303Provide & Install New 24" x 24" Tegular Acoustical Ceiling tiles and Suspension systemSF1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0304Provide & Install New 24" x 48" Acoustical Ceiling tiles and Suspension systemSF1,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0400Painting
A10-0401Prepare & Paint Metal Door FrameEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0402Prepare & Paint Metal DoorEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0403Prepare & Texture (Level 4), Walls, Ceilings, DrywallSF200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0404Prepare and Paint Metal Railings and RailsLF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0405Prepare and Paint Handrail, Inc attachmentsLF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0406Prepare and Paint Pipes up To 4" Diameter, including supportsLF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0407Prepare and paint pipes 5" to 8" Diameter, including supportsLF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0408Prepare and paint pipes Over 8" Diameter, including supportsLF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0409Prepare and paint other ferrous metal surfacesSF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0500HVAC Duct Work
A10-0501Semi-rigid 1-1/2" thick fiberglass board of 3 lb. DensitySF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0502Flexible 2" thick fiberglass duct insulation of 3 lb. DensitySF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0600Boiler/Tank/Chiller Insulation
A10-06011" thick insulationSF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-06021-1/2" thick insulationSF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0603Insulate Boilers, Breeching, Chillers or Tanks complete with 1-1/2" thick calcium silicate block, complete with banding, clips etc.SF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0700Sprayed-on Fireproofing
A10-07011-Hr fire-rated F/PSF400$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-07022-Hr fire-rated F/PSF400$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-07033-Hr fire-rated F/PSF400$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-07044-Hr fire-rated F/PSF400$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0705Application of F/P SealantSF400$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-08001" Fiberglass Pipe Insulation, with All Service Jacket (25 ASJ/SSL)
A10-08011-1/2" and below Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-08022" to 3-1/2" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-08034" to 6" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-08047" to 8" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-080510" to 12" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-080614" to 16" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-080718" to 20" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0808Over 20" Dia. Pipe sizeSF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-09001-1/2" Fiberglass Pipe Insulation, with All Service Jacket (25 ASJ/SSL)
A10-09011-1/2" and below Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-09022" to 3-1/2" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-09034" to 6" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-09047" to 8" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-090510" to 12" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-090614" to 16" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-090718" to 20" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-0908Over 20" Dia. Pipe sizeSF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-10002" Fiberglass Pipe Insulation, with All Service Jacket (25 ASJ/SSL)
A10-10011-1/2" and below Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-10022" to 3-1/2" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-10034" to 6" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-10047" to 8" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-100510" to 12" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-100614" to 16" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-100718" to 20" Dia. Pipe sizeLF20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-1008Over 20" Dia. Pipe sizeSF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-11001" Fiberglass Fitting & Flange Insulation, with All Service Jacket (25 ASJ/SSL)
A10-11011-1/2" and Below Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-11021-1/2" and Below Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-11032" to 3-1/2" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-11042" to 3-1/2" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-11054" to 6" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-11064" to 6" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-11077" to 8" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-11087" to 8" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-110910" to 12" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-111010" to 12" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-111114" to 16" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-111214" to 16" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-111318" to 20" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-111418" to 20" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-1115Over 20" Dia. Pipe size - Fitting - calculated at (3.14 x Dia. in feet) x 4 feetSF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-12001-1/2" Fiberglass Fitting & Flange Insulation, with All Service Jacket (25 ASJ/SSL)
A10-12011-1/2" and Below Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-12021-1/2" and Below Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-12032" to 3-1/2" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-12042" to 3-1/2" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-12054" to 6" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-12064" to 6" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-12077" to 8" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-12087" to 8" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-120910" to 12" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-121010" to 12" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-121114" to 16" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-121214" to 16" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-121318" to 20" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-121418" to 20" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-1215Over 20" Dia. Pipe size - Fitting - calculated at (3.14 x Dia. in feet) x 4 feetSF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-13002" Fiberglass Fitting & Flange Insulation, with All Service Jacket (25 ASJ/SSL)
A10-13011-1/2" and Below Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-13021-1/2" and Below Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-13032" to 3-1/2" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-13042" to 3-1/2" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-13054" to 6" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-13064" to 6" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-13077" to 8" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-13087" to 8" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-130910" to 12" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-131010" to 12" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-131114" to 16" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-131214" to 16" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-131318" to 20" Dia. Pipe size - FittingEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-131418" to 20" Dia. Pipe size - FlangeEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A10-1315Over 20" Dia. Pipe size - Fitting - calculated at (3.14 x Dia. in feet) x 4 feetSF100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

BASIC CONTRACT PERIOD - GRAND TOTAL $ - 0

SCHEDULE B

ACM/LBP IDIQ-BASIC CONTRACT PERIOD

Date Printed:

&DCurrent as of:
Month YearPage &P of

&N Pages

B - First Option Year

SCHEDULE "B" – FIRST CONTRACT OPTION PERIOD

01 Oct 2019 through 30 Sep 2020

Sub-Contractor
PROJECT:VNVP 149202, Asbestos and Lead Based Paint Abatement, Indefinite Delivery, Indefinite Quantity (IDIQ) ContractOverhead0.00%Profit0.00%
Prime Contractor
BASE:Sheppard Air Force Base, Texas 76311Overhead0.00%Profit0.00%
Bond0.00%Inter period Increase0.00%
GRAND TOTAL:$ - 0
Contract Line Item NumberITEMUNIT OF MEASUREQTYMATERIAL COSTLABOR COSTOTHER DIRECT COSTSSub ContractorPrime ContractorLINECLINLINE
Unit MaterialTOTALUnit LaborTOTALUnit ODCTOTALWith Overhead IncludedWith Profit IncludedWith Overhead IncludedWith Profit IncudedWith Bond IncludedTOTALUNIT PRICETOTAL
B1-0000PRE-WORK REQUIREMENTS
B1-0100State Notifications
B1-0101State Notification and Administrative fee - Minimum $55.00, up to maximum $3,210.00LOT20N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
B1-0200Submittals
B1-0201Asbestos Abatement plans, Certifications and submittalsEA20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B2-0000EQUIPMENT RENTAL
B2-0100Scaffolding
B2-0110Elevated Rolling Scaffolding (up to 20 ft. high)
B2-0111Daily RentalDY28$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B2-0112Weekly RentalWK8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B2-0113Monthly RentalMO4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
A2-0120Steel - Tubular Stationary Scaffolding (up to 20 ft. high) Includes build and teardown
B2-0121Daily RentalDY28$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B2-0122Weekly RentalWK8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B2-0123Monthly RentalMO4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B2-0200Mobile Lifts
B2-0210Lift Rental, to 40 Feet Height
B2-0211Daily RentalDY28$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B2-0212Weekly RentalWK8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B2-0213Monthly RentalMO4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B3-0000MONITORING / SAMPLING
B3-0100Monitoring / Sampling
B3-0101OSHA testing, cleaned area samples, PCM air sample analysis, NIOSH 7400EA100$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B3-0102OSHA testing, personal sampling, PCM analysis, NIOSH 7400EA400$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B3-0103OSHA testing, cleaned area samples, TEM air sample analysis, NIOSH 7402EA50$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B3-0200Consultants
B3-0201Industrial hygienistDay2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B3-0202Emergency Response, respond to call within 48 hrs, contain contamination, or provide accessDay2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0000CONTAINMENT & PREPERATION IN ASBESTOS ABATEMENT WORK AREA
B4-0100Work area Preparation
B4-0101Removing and relocating within facility all movable furniture, equipment, etc. (excluding office partition units)SF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0102for Office Partition removal, addLF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0103Preparation of ACM containment area, Danger signsEA30$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0104Contractor's equipment and personal set-up at job site and move-out at completion of work. This cost also to include the construction and dismantling of decontamination facilities and showersEA30$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0105Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 8' heightSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0106Separation barrier, 2" x 4" wood studs @ 16", 1/2" plywood ea. side to 12' heightSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0107for heights above 12' addSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0200Cleaning
B4-0201Pre-cleaning, HEPA vacuum and wet wipe, flat surfacesSF15,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0202Set up Neg. Air MachineEA30$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0300Cover Surfaces with Polyethylene Sheeting, Including Glue and Tape
B4-0301Masking and sealing Walls with single layer plastic sheeting (6 mil)SF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0302for Wall Heights above 12' addSF750$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0303for Wall Heights above 20' addSF750$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0304Masking and sealing Ceilings with single layer plastic sheeting (6 mil)SF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0305Preparation of asbestos containment area, protect Special Flooring area, 2 layers 6 mil polyethylene on 3/4" plywoodSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0306Masking and sealing Floors with double layer plastic sheeting (6 mil)SF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0307Masking and sealing with double layer plastic sheeting (6 mil) to be used for windows, doors and isolation barriersSF3,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0400Demolition of Non-Asbestos Containing Materials
B4-0401Remove Interior Base, Rubber or VinylLF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0402Remove Interior Wood BaseLF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0403Remove Interior Wood TrimLF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0404Remove Paneling over SheetrockSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0500Cut Openings in Existing Non-Asbestos Containing Materials for access to ACM
B4-0501Gypsum Board, WallsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0502Plaster, WallsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0503Gypsum or Plaster, CeilingsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0504Concrete Masonry WallsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0600Remove Non-ACM Interior Partition complete
B4-0601Demolition in asbestos contaminated area, partitions, non load bearing, plaster, lath, and studsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0602Demolition in asbestos contaminated area, partitions, non load bearing, gypsum board and studsSF300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0700Remove existing suspended acoustical ceiling tile
B4-0701Remove and store existing suspended acoustical tile, grid to remain in placeSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0702Remove, clean and store existing suspended acoustical ceiling tile system complete with grid and tileSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0703Demolition in asbestos contaminated area, Plaster and Lath ceiling, including suspension systemSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0704Demolition in asbestos contaminated area, ceiling, finished Plaster, leaving wire lathSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0705Demolition in asbestos contaminated area, ceiling, suspended acoustical tileSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
B4-0706Demolition in asbestos contaminated area, cemented–on or concealed spline ceiling systemSF1,500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.