Solicitation Amendment FA301620R00410002 SF 30 (1).pdf

PDF 539 KB Posted

Attached to
Repair Lewis Valley Rd & Trl Federal contract opportunity
Solicitation number
FA301620R0041
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document provides details of a federal solicitation to repair Lewis Valley Road and Lewis Valley Trail. The solicitation seeks surveying, design, and construction services to repair approximately 12,144 linear feet of Lewis Valley Road and 28,196 linear feet of Lewis Valley Trail located on Joint Base San Antonio Camp Bullis in Texas. Services include geotechnical analysis, topographic surveying, design plans, traffic control plans, demolition of existing pavement and culverts, lime stabilization of subgrade, construction of stormwater culverts and headwalls, placement of flexible base course and asphalt surface course. The period of performance for design services is 30 days after notice to proceed and 270 days for construction. The solicitation was issued by the Department of the Air Force with a response due date of June 1, 2020. The incumbent is to acknowledge receipt of amendments and modifications to pricing, specifications and periods of performance via signed documents.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The Purpose of This Amendment Is:

The purpose of Amendment 2 is as follows:

1. Extend the proposal due date to Monday, 01 June 2020 at 10:00am CST.

2. Revise Sections 01 11 00 & 32 17 23 for Attachments 1 & 2 Project Specifications.

3. Revise POPs for CLINs 0002, 0003, 0005 & 0006.

4. Incorporate 52.228-11 Pledge of Assets (DEVIATION 2020-O0016)

5. Incorporate 52.228-15 Performance and Payment Bonds - Construction (DEVIATION 2020-O0016)

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) were modified:

0002 - Provide Surveying, Geotechnical analysis and 100% design for the repair of Lewis Valley Road. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 1 Specifications. POP is 30 days after NTP.

INFORMATION FROM TO

Description

Provide Surveying, Geotechnical analysis and 100% design for the repair of Lewis Valley Road. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 1 Specifications. POP is 60 days after NTP.

Provide Surveying, Geotechnical analysis and 100% design for the repair of Lewis Valley Road. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 1 Specifications. POP is 30 days after NTP.

0003 - Provide construction for the repair of Lewis Valley Road. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 1 Specifications. POP is 270 days after NTP.

INFORMATION FROM TO

Description

Provide construction for the repair of Lewis Valley Road. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 1 Specifications. POP is 196 days after NTP.

Provide construction for the repair of Lewis Valley Road. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 1 Specifications. POP is 270 days after NTP.

0005 - Provide Surveying, Geotechnical analysis and 100% design for the repair of Lewis Valley Trail. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 2 Specifications. POP is 30 days after NTP.

INFORMATION FROM TO

Description

Provide Surveying, Geotechnical analysis and 100% design for the repair of Lewis Valley Trail. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 2 Specifications. POP is 60 days after NTP.

Provide Surveying, Geotechnical analysis and 100% design for the repair of Lewis Valley Trail. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 2 Specifications. POP is 30 days after NTP.

0006 - Provide Construction for the repair of Lewis Valley Trail. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 2 Specifications. POP is 270 days after NTP.

INFORMATION FROM TO

Description

Provide Construction for the repair of Lewis Valley Trail. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 2 Specifications. POP is 196 days after NTP.

Provide Construction for the repair of Lewis Valley Trail. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 2 Specifications. POP is 270 days after NTP.

Section F - Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) were modified:

FA301620R00410002

0002 - Provide Surveying, Geotechnical analysis and 100% design for the repair of Lewis Valley Road. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 1 Specifications. POP is 30 days after NTP.

INFORMATION FROM TO

Period of Performance 07/31/2020 to 09/28/2020 07/31/2020 to 08/30/2020

0003 - Provide construction for the repair of Lewis Valley Road. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 1 Specifications. POP is 270 days after NTP.

INFORMATION FROM TO

Period of Performance 09/29/2020 to 04/12/2021 08/31/2020 to 05/27/2021

0005 - Provide Surveying, Geotechnical analysis and 100% design for the repair of Lewis Valley Trail. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 2 Specifications. POP is 30 days after NTP.

INFORMATION FROM TO

Period of Performance 07/31/2020 to 09/28/2020 07/31/2020 to 08/30/2020

0006 - Provide Construction for the repair of Lewis Valley Trail. Contractor to provide personnel, materials and equipment necessary to perform in accordance with Attachment 2 Specifications. POP is 270 days after NTP.

INFORMATION FROM TO

Period of Performance 09/29/2020 to 04/12/2021 08/31/2020 to 05/27/2021

Section I - Contract Clauses

Miscellaneous text in this section has been modified to:

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984 52.204-14 Service Contract Reporting Requirements OCT 2016 52.209-9 Updates of Publicly Available Information Regarding JUL 2013 Responsibility Matters 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data Aug 2011 -Modifications 52.215-12 Subcontractor Certified Cost or Pricing Data OCT 2010 52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications Oct 2010 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement JUL 2005 Benefits (PRB) Other than Pensions 52.215-19 Notification of Ownership Changes OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data and OCT 2010 Data Other Than Certified Cost or Pricing Data -- Modifications 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award NOV 2011 52.223-2 Affirmative Procurement of Biobased Products Under Service SEP 2013 and Construction Contracts 52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-17 Affirmative Procurement of EPA-Designated Items in Service MAY 2008 and Construction Contracts 52.224-1 Privacy Act Notification APR 1984 52.224-2 Privacy Act APR 1984 52.227-2 Notice And Assistance Regarding Patent And Copyright DEC 2007 Infringement 52.228-11 Pledges of Assets (DEVIATION 2020-O0016) 52.228-15 Performance and Payment Bonds - Construction (DEVIATION 2020-O0016) 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) APR 1984 Alternate I 52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) SEP 1996 (Apr 2012) - Alternate I 252.204-7003 Control of Government Personnel Work Product APR 1992 252.215-7000 Pricing Adjustments DEC 2012 252.223-7001 Hazard Warning Labels DEC 1991 252.236-7013 Requirement for Competition Opportunity for American Steel JUN 2013 Producers, Fabricators, and Manufacturers 252.225-7002 Qualifying Country Sources as Subcontractors DEC 2017 252.247-7023 Transportation of Supplies by Sea APR 2014 5352.223-9000 Elimination of Use of Class I Ozone Depleting Substances (ODS) OCT 2019

CLAUSES INCORPORATED BY FULL TEXT

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by: Not Applicable

(b) Weather conditions. See Attachment 6.

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

Attachment 1 - Project Specifications Lewis Valley Road, 20 May 2020, 269 Pages Attachment 2- Project Specifications Lewis Valley Trail, 20 May 2020, 282 Pages Attachment 3 - Submittal Register Lewis Valley Road, 25 March 20, 7 Pages Attachment 4 - Submittal Register Lewis Valley Trail, 25 March 20, 7 Pages Attachment 5 - Wage Determination TX20200007, 03 Jan 2020, 5 Pages Attachment 6 - Climatology Report Attachment 7 - Section L - 27 April 2020, 6 pages Attachment 8 - Section M - 13 April 2020, 4 pages

IDCode:
Page: 1
Pages: 4
AmendNo: 0002
EffDate: 5/20/2020
ReqNo: A006370
ProjNo: CYRB170018 / CYRB130005
IssCode: FA3016
AdmCode:
IssuedBy: FA3016 502 CONS CL

1655 SELFRIDGE AVE BLDG 5450

CP 210-671-3617

JBSA LACKLAND, TX 78236-5286

United States Robert Gallegos, Email: robert.gallegos.4@us.af.mil Telephone: 210-671-7461

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA301620R0041
SolDate: 4/28/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript:

SEE CONTINUATION PAGE