Attachment 4 - Submittal Register Lewis Valley Trail 25 March 20.pdf
PDF 461 KB Posted
- Attached to
- Repair Lewis Valley Rd & Trl Federal contract opportunity
- Solicitation number
- FA301620R0041
About this file
This submittal register outlines the required submissions for a federal contract to repair Lewis Valley Road and Trail. The contractor must provide preconstruction submissions including a traffic control plan, project schedule, safety plans and environmental protection plans. During construction, the contractor must submit test and inspection reports for concrete, asphalt, and other materials. Certifications are required for reinforcement bars, paints, and culvert materials. Upon completion, the contractor must provide as-built drawings and inspection reports. The work includes demolition, culvert and road reconstruction, grading, paving and signage along 12 miles of road and 28 miles of trail on Joint Base San Antonio Camp Bullis in Texas.
View the file
Other files for this federal contract opportunity
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES
SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
Repair Lewis Valley Trail
CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G # R A P H
G O V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 11 00 SD-01 Preconstruction Submittals Traffic Control Plan 1.2.1.1.2 G
01 14 00 SD-01 Preconstruction Submittals list of Contract Personnel 1.4.1.1 G Installation Access 1.4.1.2
01 30 00 SD-01 Preconstruction Submittals View Location Map 1.2 G Progress and Completion 1.3 G Pictures
01 32 01.00 10 SD-01 Preconstruction Submittals Project Schedule CPM 1.2 GA
01 33 00 SD-01 Preconstruction Submittals Submittal Register 1.7 G
01 35 29 SD-01 Preconstruction Submittals Accident Prevention Plan (APP) 1.5 GA
Activity Hazard Analysis (AHA) 1.6 G 01 35 29 SD-06 Test Reports
Accident Reports G Monthly Exposure Reports GA Regulatory Citations and GA Violations
SD-07 Certificates Confined Space Entry Permit Hot work permit
ATTACHMENT 4 25 MAR 2020
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES
TITLE AND LOCATION
Repair Lewis Valley Trail
CONTRACTOR
A C T I V I T Y
N O
R A N S M I T T
L
S P E
DESCRIPTION
ITEM SUBMITTED
R A G # R A
H
G
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
ACTION
APPROVING AUTHORITY
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH
REMARKS
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
T I
D
DATE
OF
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
TO OTHER
REVIEWER
DATE RCD
FROM OTH
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 35 30 SD-08 Manufacturer’s Instructions
Site Safety and Health Plan 1.2 G
SD-09 Manufacturer’s Field
Reports
Safety and Health Phase-Out 1.2 G
Report
01 35 35 SD-01 Preconstruction Submittals
ENVIRONMENTAL 1.6
PROTECTION PLAN G
Fish and Wildlife Protection
Measures as applicable; G
Environmental Permits as applicable; G
01 45 00.00 20 SD-01 Preconstruction Submittals
Contractor Quality Control (CQC) G
Plan
01 50 00 SD-01 Preconstruction Submittals
Construction Site Plan 1.2 G
Traffic Control Plan G
SD-06 Test Reports
Backflow Preventer Tests
SD-07 Certificates
Backflow Tester
Backflow Preventers Certification 1.3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTR/
DATE RCD
T I
AUTH/
DATE RCD
T I
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 78 00 Warranty Management Plan 1.4.1 G
02 41 00 SD-01 Preconstruction Submittals
Existing Conditions 1.8
SD-11 Closeout Submittals
Receipts
03 30 00 SD-01 Preconstruction Submittals
Concrete Curing Plan 1.6.3.1
Quality Control Plan 1.6.6 G
Quality Control Personnel 1.6.7 G
Certifications
Laboratory Accreditation 1.6.9 G
Form Removal Schedule G
Formwork 1.6.2.1
Reinforcing Steel 1.6.2.2 G
SD-03 Product Data
Joint Sealants 2.4.7
Joint Filler 2.4.6
Materials for Forms 2.1
Cementitious Materials 2.4.1
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTR/
DATE RCD
T I
AUTH/
DATE RCD
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
03 30 00 Concrete Curing Materials 2.3.2
Reinforcement 2.5
Admixtures 2.4.4 S
SD-06 Test Reports
Concrete Mix Design 1.6.1.2 G
Compressive Strength Tests 3.14.2.3 G
Unit Weight of Structural 3.14.2.5
Concrete
Air Content 3.14.2.4
Slump Tests 3.14.2.1
Water 2.4.2
SD-07 Certificates
Reinforcing Bars 2.5.1
Safety Data Sheets 1.6.3.6
Curing Compound 2.3.2
31 00 00 SD-03 Product Data
SD-10 Precon Submittals 3.2
SD-06 Test Reports
Testing
SD-07 Certificates
Testing
32 11 23 SD-03 Product Data 1.4
Plant, Equipment, and Tools 1.4 G
Waybills and Delivery Tickets 1.4 G
SD-06 Test Reports
Initial Tests 1.5 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTR/
DATE RCD
T I
AUTH/
DATE RCD
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
32 11 23 In-Place Tests 1.4 G
32 12 13 SD-03 Product Data
Waybills and Delivery Tickets 1.3 G
Local/Regional Materials 1.3
SD-06 Test Reports
Sampling and Testing 3.7
32 12 16 SD-03 Product Data
Mix Design 2.4 G
Quality Control 3.10 G
Material Acceptance 3.11 G
Percent Payment 1.1.3 G
SD-04 Samples
Asphalt Cement Binder 2.3
Aggregates 2.2
SD-06 Test Reports
Aggregates 2.2 G
QC Monitoring 3.10.3.10
SD-07 Certificates
Asphalt Cement Binder 2.3 G
Testing Laboratory 3.6
32 17 23 SD-03 Product Data
Surface Preparation Equipment 2.1.1.2 G
List
Application Equipment List 2.1.2 G
Exterior Surface Preparation 3.2
Safety Data Sheets 1.4.1 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTR/
DATE RCD
T I
AUTH/
DATE RCD
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
32 17 23 Reflective media for roads 2.2.5.1 G
Solventborne Paint 2.2.1 G
Raised Pavement Markers 2.2.4 G
Primers and Adhesives G
SD-06 Test Reports
Reflective Media for Roads 2.2.5.1 G
Solventborne Paint 2.2.1 G
Raised Pavement Markers 2.2.4 G
Primers and Adhesives
Test Reports 3.4.1
SD-07 Certificates
Qualifications 1.4.2 G
Reflective Media for Roads 2.2.5.1
Solventborne Paint 2.2.1
Volatile Organic Compound 1.4.1 G
SD-08 Manufacturer’s Instructions
Solventborne Paint 2.2.1 G
32 92 23 SD-03 Product Data
Fertilizer 2.5
SD-06 Test Reports
Topsoil composition tests 2.3.3
SD-07 Certificates sods 2.1
33 40 00 SD-04 Samples
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTR/
DATE RCD
T I
AUTH/
DATE RCD
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
33 40 00 Pipe for Culverts and Storm 2.1
Drains
SD-07 Certificates
Resin Certification 2.1.1
Oil Resistant Gasket 2.3.6.1
Leakage Test 3.9.1.2
Hydrostatic Test on Watertight 3.9.1.1
Joints
Determination of Density 3.9.1.3
Frame and Cover for Gratings 2.3.3
Post-Installation Inspection 3.9.2.1.3
Report