Attachment 3 - Submittal Register Lewis Valley Road 25 March 20.pdf

PDF 476 KB Posted

Attached to
Repair Lewis Valley Rd & Trl Federal contract opportunity
Solicitation number
FA301620R0041
Issued by
Department of the Air Force Air Education and Training Command

About this file

This submittal register outlines the required submissions for a federal contract to repair Lewis Valley Road and Trail. The contractor must provide pre-construction submissions including traffic control plans, project schedules, safety plans, quality control plans and certifications. During construction, the contractor must submit test reports for concrete, asphalt, and other materials as well as certifications for materials and testing laboratories. Post-construction closeout submissions include as-built documentation and warranties. The work includes demolition, culvert and road reconstruction, paving, and other repairs to approximately 40 miles of roads and trails on Joint Base San Antonio Camp Bullis in Texas. The Air Force is the contracting agency.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Repair Lewis Valley Road Overall

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 11 00 SD-01 Preconstruction Submittals Traffic Control Plan 1.2.1.1.2 G

01 14 00 SD-01 Preconstruction Submittals list of Contract Personnel 1.4.1.1 G Installation Access 1.4.1.2

01 30 00 SD-01 Preconstruction Submittals View Location Map 1.2 G Progress and Completion 1.3 G Pictures

01 32 01.00 10 SD-01 Preconstruction Submittals Project Schedule CPM 1.2 GA

01 33 00 SD-01 Preconstruction Submittals Submittal Register 1.7 G

01 35 29 SD-01 Preconstruction Submittals Accident Prevention Plan (APP) 1.5 GA

Activity Hazard Analysis (AHA) 1.6 G 01 35 29 SD-06 Test Reports

Accident Reports G Monthly Exposure Reports GA Regulatory Citations and GA Violations

SD-07 Certificates Confined Space Entry Permit Hot work permit

ATTACHMENT 3 25 MAR 2020

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES

TITLE AND LOCATION

Repair Lewis Valley Road Overall

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 35 30 SD-08 Manufacturer’s Instructions Site Safety and Health Plan 1.2 G

SD-09 Manufacturer’s Field Reports Safety and Health Phase-Out 1.2 G Report

01 35 35 SD-01 Preconstruction Submittals

ENVIRONMENTAL 1.6

PROTECTION PLAN G

Fish and Wildlife Protection Measures as applicable; G

Environmental Permits as applicable; G

01 45 00.00 20 SD-01 Preconstruction Submittals Contractor Quality Control (CQC) G Plan

01 50 00 SD-01 Preconstruction Submittals Construction Site Plan 1.2 G Traffic Control Plan G

SD-06 Test Reports Backflow Preventer Tests

SD-07 Certificates Backflow Tester Backflow Preventers Certification 1.3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES

TITLE AND LOCATION

Repair Lewis Valley Road Overall

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 78 00 Warranty Management Plan 1.4.1 G 02 41 00 SD-01 Preconstruction Submittals

Existing Conditions 1.8 SD-11 Closeout Submittals Receipts

03 30 00 SD-01 Preconstruction Submittals Concrete Curing Plan 1.6.3.1 Quality Control Plan 1.6.6 G Quality Control Personnel 1.6.7 G Certifications

Laboratory Accreditation 1.6.9 G Form Removal Schedule G Formwork 1.6.2.1 Reinforcing Steel 1.6.2.2 G

SD-03 Product Data Joint Sealants 2.4.7 Joint Filler 2.4.6 Materials for Forms 2.1 Cementitious Materials 2.4.1

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES

TITLE AND LOCATION

Repair Lewis Valley Road Overall

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

03 30 00 Concrete Curing Materials 2.3.2 Reinforcement 2.5 Admixtures 2.4.4 S

SD-06 Test Reports Concrete Mix Design 1.6.1.2 G Compressive Strength Tests 3.14.2.3 G Unit Weight of Structural 3.14.2.5 Concrete

Air Content 3.14.2.4 Slump Tests 3.14.2.1 Water 2.4.2

SD-07 Certificates Reinforcing Bars 2.5.1 Safety Data Sheets 1.6.3.6 Curing Compound 2.3.2

31 00 00 SD-03 Product Data SD-10 Precon Submittals 3.2

SD-06 Test Reports Testing

SD-07 Certificates Testing

32 11 23 SD-03 Product Data 1.4

Plant, Equipment, and Tools 1.4 G Waybills and Delivery Tickets 1.4 G

SD-06 Test Reports Initial Tests 1.5 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES

TITLE AND LOCATION

Repair Lewis Valley Road Overall

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

32 11 23 In-Place Tests 1.4 G 32 12 13 SD-03 Product Data

Waybills and Delivery Tickets 1.3 G Local/Regional Materials 1.3

SD-06 Test Reports Sampling and Testing 3.7

32 12 16 SD-03 Product Data Mix Design 2.4 G Quality Control 3.10 G Material Acceptance 3.11 G Percent Payment 1.1.3 G

SD-04 Samples Asphalt Cement Binder 2.3 Aggregates 2.2

SD-06 Test Reports Aggregates 2.2 G QC Monitoring 3.10.3.10

SD-07 Certificates Asphalt Cement Binder 2.3 G Testing Laboratory 3.6

32 17 23 SD-03 Product Data Surface Preparation Equipment 2.1.1.2 G List

Application Equipment List 2.1.2 G Exterior Surface Preparation 3.2 Safety Data Sheets 1.4.1 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES

TITLE AND LOCATION

Repair Lewis Valley Road Overall

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

32 17 23 Reflective media for roads 2.2.5.1 G Solventborne Paint 2.2.1 G Raised Pavement Markers 2.2.4 G Primers and Adhesives G

SD-06 Test Reports Reflective Media for Roads 2.2.5.1 G Solventborne Paint 2.2.1 G

Raised Pavement Markers 2.2.4 G Primers and Adhesives

Test Reports 3.4.1 SD-07 Certificates Qualifications 1.4.2 G Reflective Media for Roads 2.2.5.1 Solventborne Paint 2.2.1 Volatile Organic Compound 1.4.1 G

SD-08 Manufacturer’s Instructions Solventborne Paint 2.2.1 G

32 92 23 SD-03 Product Data Fertilizer 2.5

SD-06 Test Reports Topsoil composition tests 2.3.3

SD-07 Certificates sods 2.1

33 40 00 SD-04 Samples

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES

TITLE AND LOCATION

Repair Lewis Valley Road Overall

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

33 40 00 Pipe for Culverts and Storm 2.1 Drains

SD-07 Certificates Resin Certification 2.1.1 Oil Resistant Gasket 2.3.6.1 Leakage Test 3.9.1.2 Hydrostatic Test on Watertight 3.9.1.1 Joints

Determination of Density 3.9.1.3 Frame and Cover for Gratings 2.3.3 Post-Installation Inspection 3.9.2.1.3 Report