Atch_6-_Government_Estimate_Breakdown_14_June_2017.pdf

PDF 61 KB Posted

Attached to
Remove chromium-contaminated sprayed-on insulation. Federal contract opportunity
Solicitation number
FA301617R0036
Issued by
Department of the Air Force Air Education and Training Command

About this file

Updated Government Estimate Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to Remove chromium-contaminated sprayed-on insulation., newest first.
File Type Posted
FA3016-17-R-0036-0004_Signed.pdf PDF
Atch_11_Site_Visit_Questions_Hanger_61.pdf PDF
Atch_10_Asbestos_Report.pdf PDF
FA3016-17-R-0036-0003_Signed.pdf PDF
Atch_9_-_Hazard_Report.pdf PDF
FA3016-17-R-0036-0002.pdf PDF
Atch_2_Wage_Determination_2_June.pdf PDF
Atch_1_rev_-STATEMENT_OF_WORK_for_TYMX061005_H61_9_June_2017_revision.pdf PDF
AMENDMENT_1__FA3016-17-R-0036.pdf PDF
Atch_3_-_Base_Access_Request_Form.pdf PDF
Atch_7_-_AETC_Form_47.pdf PDF
Atch_8_-_HAZMAT_Letter.pdf PDF
Atch_2_-_WageDetermination_19May17.pdf PDF
Atch_1_-_STATEMENT_OF_WORK_for_H61_Final.pdf PDF
SOLICITATION_Hangar61_RELEASED.pdf PDF
Atch_4__Financial_Information_Questionnaire.docx DOCX document
Atch_6_-_Cost_Estimate_Breakdown.pdf PDF
Atch_5_Contractor_Responsibility_Questionnaire.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

****ITEMS LISTED ARE NOT ALL INCLUSIVE*****

2 01-31-13-20-0140 Field personnel, field engineer, maximum Week

3 01-31-13-20-0200 Field personnel, project manager, average Week

4 01-31-13-20-0280 Field personnel, superintendent, maximum Week

5 01-31-13-20-0290 Field personnel, timekeeper, average Week

6 01-52-13-20-0450 Office and storage space, office trailer, furnished, no hookups, 50' x 10', ren Ea.

7 01-52-13-40-0100 Field office expense, office equipment rental, average Month

8 01-52-13-40-0120 Field office expense, office supplies, average Month

9 01-54-09-50-0050 Personnel protective equipment, hazardous waste protection, respirator car Ea.

10 01-54-09-50-0060 Personnel protective equipment, hazardous waste protection, respirator car Ea.

11 01-54-23-70-0560 Scaffolding, steel tube, regular, no plank, labor only to erect and dismantle, C.S.F.

12 01-54-23-70-1650 Scaffolding, steel tubular, regular, buy, accessories, screw jacks and plates Ea.

13 01-54-23-70-2750 Scaffolding, steel tubular, regular, rent by month, accessories, 8" casters Ea.

14 01-54-23-75-4400 Scaffolding specialties, rolling ladders, complete including wheels, railings, Ea.

15 01-54-33-40-0160-1 Hourly operating cost for general equipment rental, without operators, aer Ea.

16 01-54-33-40-3400-1 Hourly operating cost for general equipment rental, without operators, lad Ea.

17 01-54-33-40-3400-4 Rent per month for general equipment rental, without operators, ladders, e Ea.

18 01-54-33-40-6410-4 Rent per month for general equipment rental, without operators, toilet, por Ea.

19 01-56-16-10-0110 Dust barriers, temporary, accessories, polyethylene sheet, 6 mil Sq.

20 01-56-16-10-1000 Dust barriers, temporary, dust partition, 6 mil polyethylene, 1" x 3" frame S.F.

21 01-74-13-20-0050 Cleaning up, cleanup of floor area, continuous, per day, during construction M.S.F.

22 01-74-13-20-0100 Cleaning up, cleanup of floor area, final by General Contractor at end of job M.S.F.

23 02-41-19-19-2045 Selective demolition, rubbish handling, the following are to be added to the C.Y.

24 02-56-13-10-0520-0035 Containment of hazardous waste, OSHA Hazard level B increase labo S.F.

25 02-56-13-10-0610 Containment of hazardous waste, OSHA hazard level C, excavation of cont S.F.

26 02-81-20-10-1130 Hazardous waste cleanup/pickup/disposal, solid pickup, bulk material, maxi Ton

27 02-81-20-10-1130 Hazardous waste cleanup/pickup/disposal, solid pickup, bulk material, maxi Ton

28 02-81-20-10-6000 Hazardous waste cleanup/pickup/disposal, dumpsite disposal charge, minimTon

29 02-81-20-10-6020 Hazardous waste cleanup/pickup/disposal, dumpsite disposal charge, maxi Ton

30 02-82-13-39-0200 Asbestos remediation plans and methods, asbestos abatement remediation Ea.

31 02-82-13-41-0410 Asbestos abatement equipment, equipment and supplies, buy, personal res Ea.

32 02-82-13-41-2550 Asbestos abatement equipment, equipment and supplies, buy, respirator, s Ea.

33 02-82-13-41-3050 Asbestos abatement equipment, equipment and supplies, buy, HEPA vacuu Ea.

34 02-82-13-41-6000 Asbestos abatement equipment, equipment and supplies, buy, disposable p Ea.

35 02-82-13-42-0100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and S.F.

36 02-82-13-42-0551 Preparation of asbestos containment area, cover surfaces with polyethylene S.F.

37 02-82-13-45-0110 OSHA testing, certified technician, maximum Day

38 02-82-13-45-0130 OSHA testing, industrial hygienist, maximum Day

39 02-82-13-45-0200 OSHA testing, personal sampling, PCM analysis, NIOSH 7400, minimum Ea.

40 02-82-13-45-0210 OSHA testing, personal sampling, PCM analysis, NIOSH 7400, maximum Ea.

41 02-82-13-45-1110 OSHA testing, cleaned area samples, PCM air sample analysis, NIOSH 740 Ea.

42 02-82-13-45-1200 OSHA testing, cleaned area samples, TEM air sample analysis, NIOSH 740 Ea.

General Construction Prime Contractor Bonding General Construction Contingency

TYMX061005

WORK LOCATION

CONTRACT FOR (Work to be performed) Repair Hangar Doors & Insulation, Bldg 61

LINE

TOTAL

EQUIPMENT COSTS OTHER COSTSLABOR COSTS

Proposed Project AmountThis cost proposal is valid for ______________________________days

The period of performance to perform this work is ___________ days.

CONSTRUCTION COST ESTIMATE BREAKDOWN

LINE

NO UNIT OF

MEASITEM DESCRIPTION

MATERIAL COSTS

PROJECT NUMBERPURCHASE REQUEST NUMBER

General Construction Subtotal

General Construction Prime Contractor Overhead

CONTRACTOR ADDRESS

General Construction Prime Contractor Profit

General Construction Labor Burden

****ITEMS LISTED ARE NOT ALL INCLUSIVE*****

General Construction Prime Contractor Bonding General Construction Contingency

TYMX061005

WORK LOCATION

CONTRACT FOR (Work to be performed) Repair Hangar Doors & Insulation, Bldg 61

LINE

TOTAL

EQUIPMENT COSTS OTHER COSTSLABOR COSTS

Proposed Project AmountThis cost proposal is valid for ______________________________days

The period of performance to perform this work is ___________ days.

CONSTRUCTION COST ESTIMATE BREAKDOWN

LINE

NO UNIT OF

MEASITEM DESCRIPTION

MATERIAL COSTS

PROJECT NUMBERPURCHASE REQUEST NUMBER

General Construction Subtotal

General Construction Prime Contractor Overhead

CONTRACTOR ADDRESS

General Construction Prime Contractor Profit

General Construction Labor Burden

43 02-82-13-45-1210 OSHA testing, cleaned area samples, TEM air sample analysis, NIOSH 740 Ea.

44 02-82-13-47-0200 Asbestos waste packaging, handling, and disposal, collect and bag bulk ma Ea.

45 ASBE Asbestos/Insulation Workers/Pipe Coverer - 2016 RSMeans Facilities Bare Rate Hour

Details

File details come from the government source that posted it. Updated .