Updated Government Estimate Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA3016-17-R-0036-0004_Signed.pdf | ||
| Atch_11_Site_Visit_Questions_Hanger_61.pdf | ||
| Atch_10_Asbestos_Report.pdf | ||
| FA3016-17-R-0036-0003_Signed.pdf | ||
| Atch_9_-_Hazard_Report.pdf | ||
| FA3016-17-R-0036-0002.pdf | ||
| Atch_2_Wage_Determination_2_June.pdf | ||
| Atch_1_rev_-STATEMENT_OF_WORK_for_TYMX061005_H61_9_June_2017_revision.pdf | ||
| AMENDMENT_1__FA3016-17-R-0036.pdf | ||
| Atch_3_-_Base_Access_Request_Form.pdf | ||
| Atch_7_-_AETC_Form_47.pdf | ||
| Atch_8_-_HAZMAT_Letter.pdf | ||
| Atch_2_-_WageDetermination_19May17.pdf | ||
| Atch_1_-_STATEMENT_OF_WORK_for_H61_Final.pdf | ||
| SOLICITATION_Hangar61_RELEASED.pdf | ||
| Atch_4__Financial_Information_Questionnaire.docx | DOCX document | |
| Atch_6_-_Cost_Estimate_Breakdown.pdf | ||
| Atch_5_Contractor_Responsibility_Questionnaire.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
****ITEMS LISTED ARE NOT ALL INCLUSIVE*****
2 01-31-13-20-0140 Field personnel, field engineer, maximum Week
3 01-31-13-20-0200 Field personnel, project manager, average Week
4 01-31-13-20-0280 Field personnel, superintendent, maximum Week
5 01-31-13-20-0290 Field personnel, timekeeper, average Week
6 01-52-13-20-0450 Office and storage space, office trailer, furnished, no hookups, 50' x 10', ren Ea.
7 01-52-13-40-0100 Field office expense, office equipment rental, average Month
8 01-52-13-40-0120 Field office expense, office supplies, average Month
9 01-54-09-50-0050 Personnel protective equipment, hazardous waste protection, respirator car Ea.
10 01-54-09-50-0060 Personnel protective equipment, hazardous waste protection, respirator car Ea.
11 01-54-23-70-0560 Scaffolding, steel tube, regular, no plank, labor only to erect and dismantle, C.S.F.
12 01-54-23-70-1650 Scaffolding, steel tubular, regular, buy, accessories, screw jacks and plates Ea.
13 01-54-23-70-2750 Scaffolding, steel tubular, regular, rent by month, accessories, 8" casters Ea.
14 01-54-23-75-4400 Scaffolding specialties, rolling ladders, complete including wheels, railings, Ea.
15 01-54-33-40-0160-1 Hourly operating cost for general equipment rental, without operators, aer Ea.
16 01-54-33-40-3400-1 Hourly operating cost for general equipment rental, without operators, lad Ea.
17 01-54-33-40-3400-4 Rent per month for general equipment rental, without operators, ladders, e Ea.
18 01-54-33-40-6410-4 Rent per month for general equipment rental, without operators, toilet, por Ea.
19 01-56-16-10-0110 Dust barriers, temporary, accessories, polyethylene sheet, 6 mil Sq.
20 01-56-16-10-1000 Dust barriers, temporary, dust partition, 6 mil polyethylene, 1" x 3" frame S.F.
21 01-74-13-20-0050 Cleaning up, cleanup of floor area, continuous, per day, during construction M.S.F.
22 01-74-13-20-0100 Cleaning up, cleanup of floor area, final by General Contractor at end of job M.S.F.
23 02-41-19-19-2045 Selective demolition, rubbish handling, the following are to be added to the C.Y.
24 02-56-13-10-0520-0035 Containment of hazardous waste, OSHA Hazard level B increase labo S.F.
25 02-56-13-10-0610 Containment of hazardous waste, OSHA hazard level C, excavation of cont S.F.
26 02-81-20-10-1130 Hazardous waste cleanup/pickup/disposal, solid pickup, bulk material, maxi Ton
27 02-81-20-10-1130 Hazardous waste cleanup/pickup/disposal, solid pickup, bulk material, maxi Ton
28 02-81-20-10-6000 Hazardous waste cleanup/pickup/disposal, dumpsite disposal charge, minimTon
29 02-81-20-10-6020 Hazardous waste cleanup/pickup/disposal, dumpsite disposal charge, maxi Ton
30 02-82-13-39-0200 Asbestos remediation plans and methods, asbestos abatement remediation Ea.
31 02-82-13-41-0410 Asbestos abatement equipment, equipment and supplies, buy, personal res Ea.
32 02-82-13-41-2550 Asbestos abatement equipment, equipment and supplies, buy, respirator, s Ea.
33 02-82-13-41-3050 Asbestos abatement equipment, equipment and supplies, buy, HEPA vacuu Ea.
34 02-82-13-41-6000 Asbestos abatement equipment, equipment and supplies, buy, disposable p Ea.
35 02-82-13-42-0100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and S.F.
36 02-82-13-42-0551 Preparation of asbestos containment area, cover surfaces with polyethylene S.F.
37 02-82-13-45-0110 OSHA testing, certified technician, maximum Day
38 02-82-13-45-0130 OSHA testing, industrial hygienist, maximum Day
39 02-82-13-45-0200 OSHA testing, personal sampling, PCM analysis, NIOSH 7400, minimum Ea.
40 02-82-13-45-0210 OSHA testing, personal sampling, PCM analysis, NIOSH 7400, maximum Ea.
41 02-82-13-45-1110 OSHA testing, cleaned area samples, PCM air sample analysis, NIOSH 740 Ea.
42 02-82-13-45-1200 OSHA testing, cleaned area samples, TEM air sample analysis, NIOSH 740 Ea.
General Construction Prime Contractor Bonding General Construction Contingency
TYMX061005
WORK LOCATION
CONTRACT FOR (Work to be performed) Repair Hangar Doors & Insulation, Bldg 61
LINE
TOTAL
EQUIPMENT COSTS OTHER COSTSLABOR COSTS
Proposed Project AmountThis cost proposal is valid for ______________________________days
The period of performance to perform this work is ___________ days.
CONSTRUCTION COST ESTIMATE BREAKDOWN
LINE
NO UNIT OF
MEASITEM DESCRIPTION
MATERIAL COSTS
PROJECT NUMBERPURCHASE REQUEST NUMBER
General Construction Subtotal
General Construction Prime Contractor Overhead
CONTRACTOR ADDRESS
General Construction Prime Contractor Profit
General Construction Labor Burden
****ITEMS LISTED ARE NOT ALL INCLUSIVE*****
General Construction Prime Contractor Bonding General Construction Contingency
TYMX061005
WORK LOCATION
CONTRACT FOR (Work to be performed) Repair Hangar Doors & Insulation, Bldg 61
LINE
TOTAL
EQUIPMENT COSTS OTHER COSTSLABOR COSTS
Proposed Project AmountThis cost proposal is valid for ______________________________days
The period of performance to perform this work is ___________ days.
CONSTRUCTION COST ESTIMATE BREAKDOWN
LINE
NO UNIT OF
MEASITEM DESCRIPTION
MATERIAL COSTS
PROJECT NUMBERPURCHASE REQUEST NUMBER
General Construction Subtotal
General Construction Prime Contractor Overhead
CONTRACTOR ADDRESS
General Construction Prime Contractor Profit
General Construction Labor Burden
43 02-82-13-45-1210 OSHA testing, cleaned area samples, TEM air sample analysis, NIOSH 740 Ea.
44 02-82-13-47-0200 Asbestos waste packaging, handling, and disposal, collect and bag bulk ma Ea.
45 ASBE Asbestos/Insulation Workers/Pipe Coverer - 2016 RSMeans Facilities Bare Rate Hour