Remove chromium-contaminated sprayed-on insulation. Federal contract opportunity
Solicitation number
FA301617R0036
Issued by
Department of the Air Force Air Education and Training Command

About this file

Cost Estimate Breakdown

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Atch 6 - Cost Estimate Breakdown

84.30%

QUANTITY UNIT TOTAL Crew Man-hours Average

Rate TOTAL UNIT TOTAL UNIT TOTAL

1 01-11-31-30-0200 Engineering fees, electrical, minimum Contrct

2 01-31-13-20-0140 Field personnel, field engineer, maximum Week

3 01-31-13-20-0200 Field personnel, project manager, average Week

4 01-31-13-20-0280 Field personnel, superintendent, maximum Week

5 01-31-13-20-0290 Field personnel, timekeeper, average Week

6 01-52-13-20-0450 Office and storage space, office trailer, furnished, no hookups, 50' x 10', rent per month

Ea.

7 01-52-13-40-0100 Field office expense, office equipment rental, average Month

8 01-52-13-40-0120 Field office expense, office supplies, average Month

9 01-54-09-50-0050 Personnel protective equipment, hazardous waste protection, respirator cartridges, 2 required per mask, chemical vapor

Ea.

10 01-54-09-50-0060 Personnel protective equipment, hazardous waste protection, respirator cartridges, 2 required per mask, combination vapor and dust

Ea.

11 01-54-23-70-0560 Scaffolding, steel tube, regular, no plank, labor only to erect and dismantle, building interior, wall face area, 16' to 40' high

C.S.F.

12 01-54-23-70-1650 Scaffolding, steel tubular, regular, buy, accessories, screw jacks and plates Ea.

13 01-54-23-70-2750 Scaffolding, steel tubular, regular, rent by month, accessories, 8" casters Ea.

14 01-54-23-70-2850 Scaffolding, steel tubular, regular, rent by month, accessories, plank 2" x 10" x 16'-0"

Ea.

15 01-54-23-70-5700 Scaffolding, planks, 2" x 10" x 16'-0", labor only to erect and remove, to 50' high

Ea.

16 01-54-23-75-4400 Scaffolding specialties, rolling ladders, complete including wheels, railings, outriggers, 21' high, rent by month = 5% of purchase cost

Ea.

17 01-54-23-75-4400 Scaffolding specialties, rolling ladders, complete including wheels, railings, outriggers, 21' high, rent by month = 5% of purchase cost

Ea.

18 01-54-33-40-0160-1 Hourly operating cost for general equipment rental, without operators, aerial lift, scissor type, electric, to 25' high, 2000 lbs. capacity

Ea.

19 01-54-33-40-3400-1 Hourly operating cost for general equipment rental, without operators, ladders, extension type, 40' to 60' long

Ea.

20 01-54-33-40-6410-4 Rent per month for general equipment rental, without operators, toilet, portable chemical

Ea.

21 01-56-16-10-0110 Dust barriers, temporary, accessories, polyethylene sheet, 6 mil Sq.

22 01-56-16-10-1000 Dust barriers, temporary, dust partition, 6 mil polyethylene, 1" x 3" frame S.F.

23 01-74-13-20-0050 Cleaning up, cleanup of floor area, continuous, per day, during construction M.S.F.

24 01-74-13-20-0100 Cleaning up, cleanup of floor area, final by General Contractor at end of job M.S.F.

25 02-41-19-19-2045 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Load, haul, dump and return, 0' to 100' haul, wheeled

C.Y.

CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTOR ADDRESS

Subtotal

Line Items Subtotal

LINE

TOTAL

LINE

NO.

UNIT OF

MEASUREITEM DESCRIPTION

MATERIAL COSTS LABOR COSTS EQUIPMENT COSTS OTHER COSTS

TYMX061005

WORK LOCATIONPURCHASE REQUEST NUMBER PROJECT NUMBER

JBSA-RND

RSMeans San Antonio, TX CCI

Overhead

Profit

Repair Hangar Doors & Insulation, Bldg 61

Proposed Total Project Price

Bonding

CONTRACT FOR (Work to be performed)

1109077549C Typewritten Text

FA3016-17-R-0036

Attachment 6

1109077549C Typewritten Text

Atch 6 - Cost Estimate Breakdown

84.30%

QUANTITY UNIT TOTAL Crew Man-hours Average

Rate TOTAL UNIT TOTAL UNIT TOTAL

CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTOR ADDRESS

Subtotal

Line Items Subtotal

LINE

TOTAL

LINE

NO.

UNIT OF

MEASUREITEM DESCRIPTION

MATERIAL COSTS LABOR COSTS EQUIPMENT COSTS OTHER COSTS

TYMX061005

WORK LOCATIONPURCHASE REQUEST NUMBER PROJECT NUMBER

JBSA-RND

RSMeans San Antonio, TX CCI

Overhead

Profit

Repair Hangar Doors & Insulation, Bldg 61

Proposed Total Project Price

Bonding

CONTRACT FOR (Work to be performed)

26 02-56-13-10-0520-0035 Containment of hazardous waste, OSHA Hazard level B increase labor and equipment, add (Modified using 02-56-13-10-0035)

S.F.

27 02-56-13-10-0610 Containment of hazardous waste, OSHA hazard level C, excavation of contaminated soil and waste, includes one respirator filter and two disposable suits per work day, secure burial cel

S.F.

28 02-81-20-10-1130 Hazardous waste cleanup/pickup/disposal, solid pickup, bulk material, maximum

Ton

29 02-81-20-10-6000 Hazardous waste cleanup/pickup/disposal, dumpsite disposal charge, minimum

Ton

30 02-82-13-39-0200 Asbestos remediation plans and methods, asbestos abatement remediation plan

Ea.

31 02-82-13-41-0410 Asbestos abatement equipment, equipment and supplies, buy, personal respirators, negative pressure, 1/2 face, dual operation, minimum

Ea.

32 02-82-13-41-2550 Asbestos abatement equipment, equipment and supplies, buy, respirator, single use, cartridge for respirator

Ea.

33 02-82-13-41-3050 Asbestos abatement equipment, equipment and supplies, buy, HEPA vacuum for work area, maximum

Ea.

34 02-82-13-41-6000 Asbestos abatement equipment, equipment and supplies, buy, disposable polyethylene bags, 6 mil, 3 C.F.

Ea.

35 02-82-13-42-0100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces

S.F.

36 02-82-13-42-0551 Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, including glue and tape, floors, each layer, 4 mil

S.F.

37 02-82-13-42-0551 Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, including glue and tape, floors, each layer, 4 mil

S.F.

38 02-82-13-43-0300-9000 Bulk asbestos removal, for type B (supplied air) respirator equipment, add (Modified using 02-82-13-43-9000)

39 02-82-13-45-0110 OSHA testing, certified technician, maximum Day

40 02-82-13-45-0210 OSHA testing, personal sampling, PCM analysis, NIOSH 7400, maximum Ea.

41 02-82-13-45-1210 OSHA testing, cleaned area samples, TEM air sample analysis, NIOSH 7402, maximum

Ea.

42 02-82-13-47-0200 Asbestos waste packaging, handling, and disposal, collect and bag bulk material, 3 C.F. bags, large production vacuum loader

Ea.

1109077549C Typewritten Text

FA3016-17-R-0036

Attachment 6

1109077549C Typewritten Text

1109077549C Typewritten Text

Details

File details come from the government source that posted it. Updated .