Attachment 12 Questions and Answers.pdf
PDF 217 KB Posted
- Attached to
- Repair Backup Generator Building 423, Patrick Space Force Base, Fl Federal contract opportunity
- Solicitation number
- FA252122B0010
About this file
This document contains questions and answers related to a federal contract opportunity to replace a backup generator at Patrick Space Force Base. The opportunity involves removing and replacing an existing generator and circuitry that provides power to a command post building. Drawing notes instruct the electrical contractor to install a new 150 amp circuit breaker and reconfigure existing feeder conductors and conduit. One question seeks clarification on connecting a load bank for generator testing, with the response confirming the load bank location is correct and no additional accessories are required.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWER FORM
Project Number: SXHT 16-1104
Project Description: Replace Generator Command Post, B423
Question (#1):
Other (Specify) E-601
Is the electrical contractor responsible for connecting this 150A CB to the load? If this is true, please provide more information.
Government Response (#1): The electrical contractor is responsible for connecting the 150 amp circuit breaker to the load. Drawing E-101 Flag Notes 7 and 8 instruct the contractor to install new 150 amp enclosed circuit breaker to provide secondary protection for command post transformer and to reconfigure existing command post ATS feeder conductors and conduit to refeed command post.
Question (#2):
RFP Section: E-601
Please provide the sequence of operation for the generator load bank process?
The location of the load bank connections, without interlocking, might cause power from the generator to flow to the ATS (E lugs) and through the 70A generator CB. The desired load bank testing sequence of operation should clarify. The load bank connection may require additional accessories depending on the sequence.
Government Response (#2): Location of load bank connection is correct. Load bank can be used to supplement facility load for generator testing. No additional accessories are required.