Atch_10_-_Sample_Project_SOW_and_Response_Form.pdf

PDF 219 KB Posted

Attached to
Repair Building Envelope Federal contract opportunity
Solicitation number
FA2521-18-R-0018
Issued by
Department of the Air Force Space Command

About this file

RFP Attch 10 Sample Project 1 Page

View the file

Other files for this federal contract opportunity

Other files attached to Repair Building Envelope, newest first.
File Type Posted
FA2521-18-R-0018_-04.pdf PDF
FA2521-18-R-0018_Amendment_03.pdf PDF
Atch_3_-_Davis_Bacon_6_Jul_18.pdf PDF
Answers__for_18-R-0018_Solicitation_13_Jul_18.pdf PDF
FA2521-18-R-0018-02_Update_Section_L,_Instructions.pdf PDF
Attch_12_Question_and_Answer_Template.docx DOCX document
FA2521-18-R-0018-01.pdf PDF
Atch_1_-_Specifications.pdf PDF
Atch_11_-_Sample_Project_Drawings.pdf PDF
Atch_5_-_Hazardous_Waste_Form.doc.pdf PDF
Atch_4_-_GPP_Form.doc.pdf PDF
Atch_2_-_Statement_of_Work.pdf PDF
Atch_7_-_Past_Performance_Questionairre.pdf PDF
Atch_9_-_Price_Schedule.xlsx XLSX spreadsheet
Atch_8_-_SubKtr_Consent_Letter_Template.docx DOCX document
Solicitation_FA2521-18-R-0018,_Building_Envelope_CCAFS.pdf PDF
Atch_6_-_Badge_Request_Form.pdf PDF
Atch_3_-_Davis_Bacon_1_Jun_18.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMPLE PROJECT

SAMPLE PROJECT STATEMENT OF WORK (SOW)

1. All work to be accomplished in accordance with contract details, specifications, and drawings, unless indicated otherwise.

2. WARRANTY AND WARRANTY SIGN: Upon completion of the project, contractor shall provide and install 1 warranty sign for each facility. Warranty sign shall include the following information:

Completion Date, Warranty Expiration Date, Warranty Number, Manufacturer and Contractor Information, Roof System

Information, Roof Type Application, Roof Area and Deck Type, and statement, “Do Not Make Repairs or Alterations to this

Roof Without Approval from the Facility Manager.”

For this Sample Project, Contractor must select the appropriate Item Number(s) for the Warranty Sign. An actual sign is not required.

3. Performance period for project will be 90-days to include 15 non-access days.

4. Provide all the equipment, labor and materials necessary to Replace Roof of SAMPLE PROJECT, CCAFS, FL as shown on

Project Drawings. Project will provide a complete usable roof system.

OFFEROR RESPONSE

i. SCHEDULE OF WORK: Prepare a schedule of work for the individual work tasks required to complete the Sample Project. Each unique work task shall be reflected in the appropriate sequence, that is, the tasks shall be presented in the order they would need to occur for satisfactory completion of the Project. In the table below, provide a task description, a task begin day, a task end day, and duration of each task. Tasks that occur concurrently will show overlap in the time period between of the begin day and end day. If contractor proposes to complete the actual construction in 53 days, the “begin day” of Task 1 will have a begin day of “1,” and the

End Day of the last task will be “53.” A narrative describing any assumptions that were made may be placed in the last column. You may insert more rows as needed.

SAMPLE PROJECT – SCHEDULE OF WORK

Task

No.

Task Description

Task

Begin

Day

Task

End

Day

Task

Duration

(Days)

Task Narrative

1 1

ii. PROPOSED LINE ITEMS: In the first column below, provide Line Item Numbers from the Price Schedule (Attachment 10), required to fulfill the work given on the SOW and Drawings of the Sample Project. In the second column provide the “Reason for

Selection of the Line Item Number” such as, the corresponding drawing flag note, SOW paragraph number, Specification reference or other reason(s) for selecting the specific line item number. A narrative describing any assumptions for each line item selection may be added in the last column. You may insert more rows as needed.

SAMPLE PROJECT - LINE ITEM NUMBERS

IDIQ Line

Item No.

Reason for Selection of Line Item No. Narrative