Amendment 0002 to FA2521-16-B-0002 3 pages dated 09 Sep 16

View the file

Other files for this federal contract opportunity

Other files attached to Demolish Heritage Launch Deactivation Delta II Complex 17 Phase 2 and Various Locations, newest first.
File Type Posted
Bid_Opening_Attendance_Record.pdf PDF
Abstract_of_Bids.pdf PDF
Attch_13_Answers_to_Questions.pdf PDF
Attch_11_Site_visit_attendance.pdf PDF
Attch_1_SOW_Revised_7_Sep_16.docx DOCX document
01-40906_a.pdf PDF
98K01537.pdf PDF
11)_Project_Map _Floor_Plans _ _Drawings_V2.pdf PDF
01-40906_WATER_PUMP_STATION__1.pdf PDF
Pages_191-199_Attch_3b_CX_17_Index.pdf PDF
Pages_171-180_Attch_3b_CX_17_Index.pdf PDF
Pages_161-170_Attch_3b_CX_17_Index.pdf PDF
Pages_91-100_Attch_3b_CX_17_Index.pdf PDF
Pages_101-110_Attch_3b_CX_17_Index.pdf PDF
Pages_81-90_Attch_3b_CX_17_Index.pdf PDF
Pages_111-120_Attch_3b_CX_17_Index.pdf PDF
Pages_41-50_Attch_3b_CX_17_Index.pdf PDF
Pages_21-30_Attch_3b_CX_17_Index.pdf PDF
Pages_141-150_Attch_3b_CX_17_Index.pdf PDF
Pages_61-70_Attch_3b_CX_17_Index.pdf PDF
Pages_131-140_Attch_3b_CX_17_Index.pdf PDF
Pages_31-40_Attch_3b_CX_17_Index.pdf PDF
Pages_51-60_Attch_3b_CX_17_Index.pdf PDF
Pages_11-20_Attch_3b_CX_17_Index.pdf PDF
Pages_151-160_Attch_3b_CX_17_Index.pdf PDF
Pages_181-190_Attch_3b_CX_17_Index.pdf PDF
Pages_71-80_Attch_3b_CX_17_Index.pdf PDF
Pages_121-130_Attch_3b_CX_17_Index.pdf PDF
Pages_1-10_Attch_3b_CX_17_Index.pdf PDF
Attch_7_CECC_Form_3052.xls XLS spreadsheet
FA2521-16-B-0002_IFB_Demo_Amend_0001.pdf PDF
Attch_6_Haz_Waste_Form.doc DOC document
15507 Elec Gear Trform BMDO.PDF PDF
36003 Electrical Distribution Building.pdf PDF
12)_Demo_CX17_PHII_SOW_V2.docx DOCX document
FA2521-16-B-0002_IFB_Demo_CX20_ _CX17.pdf PDF
Attch_8_Question_and_Answer_Template.docx DOCX document
15530 Pond Contaminated Liquids.pdf PDF
Attch_10_Badge_Request_45_SFS_Form_V9.pdf PDF
36002 Battery Lab.pdf PDF
11)_HLDDII_PHII_Specifications.pdf PDF
Attch_7_CECC_Form_3052.xls XLS spreadsheet
Attch_5_FLSA_WD.pdf PDF
18800 Blockhouse CX20.pdf PDF
70657 ITL X Ray Facility.pdf PDF
Attch_9_GPP_Certification.pdf PDF
70662 Emergency Generator Building.pdf PDF
40906 Pump Station 1.pdf PDF
56632 by EOD Delta Laboratory.pdf PDF
Attch_10_Badge_Request_45_SFS_Form_V9.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DBEH 08-1XXX/10-1755

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. The purpose of this amendment is to provide the site visit attendance log from the mandatory pre-bid site visit on 7 Sep 16; provide an updated SOW and project draw ings and maps; and provide the amount of liquidated damages.

B. The revised Statement of Work, dated 7 Sep 16, is hereby incorporated as Attachment 1, replacing the previous Statement of Work, dated 6 May 16. (Reference Section J - List of Attachments) C. The site visit attendance log is hereby incorporated into the solicitation as Attachment 11. (Reference Section J) D. Attachments 3a, 3c, 3d, and 3e have been revised and updated. Attachments 3f and 3g have been removed.

E. FAR clause 52.211-12 Liquidated Damages--Construction in Section I of the solicitation has been filled-in.

F. The due date for submission of bids has NOT been extended. All other terms and conditions remain the same.

POC: Jose L. Plasencia, Contracting Officer, (321) 853-0877, jose.plasencia.2@us.af.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA2521-16-B-0002

X 9B. DATED (SEE ITEM 11)

22-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Sep-2016

CODE

45 CONS/LGCAC

14640 HANGAR ROAD

CCAFS 1704 ROOM 2102B MS2037

PATRICK AFB FL 32925-2206

FA2521 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA2521-16-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $326.59 for the first calendar day and $256.96 for each calendar day thereafter of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

No. Title / Description No. Pages Date 1 Statement of Work 6 6 May 2016 2 Demolition Specifications 109 N/A 3 Drawings and Plans (708 Total) a Project Map, Floor and Drawings 11 N/A b Complex 17 Index 199 20 Oct 1964 c Pumping Station Mechanical Siting Plan & Details 6 Jan 1956 d Pumping Station No. 1 Drainage Structure Details

II

17 20 Mar 1958 e Pump Station #1 Roof Replacement 5 20 Aug 2004 4 ACM Surveys (47 total) 3 Aug 2016 a 15507 Elec Gear Trform, BMDO 1 b 15530 Pond Contam. Liq/LC-20 1 c 36002 Battery Lab 1 d 36003 Electric Distribution Building 1 e 40906 Water Pump Station #1 3 f 56632 Delta Laboratories 12 g 70659 ITL X-Ray Facility 1 h 70662 Emergency Generator Bldg 1

5 Fair Labor Standards Act Wage Determination 9 29 Dec 2015 6 Forecast of Contractor’s Hazardous Waste 2 N/A

FA2521-16-B-0002

Geneteration Form 7 CECC Form 3052 3 N/A 8 Questions & Answers Template 1 N/A 9 Recovered Materials Determination Form 2 2 Mar 2016 10 Visitor/Badge Request Form 2 N/A 11 Pre-Bid Site Visit Attendance Log 3 7 Sep 2016

(End of Summary of Changes)

File details come from the government source that posted it. Updated .