11)_HLDDII_PHII_Specifications.pdf
PDF 423 KB Posted
- Attached to
- Demolish Heritage Launch Deactivation Delta II Complex 17 Phase 2 and Various Locations Federal contract opportunity
- Solicitation number
- FA2521-16-B-0002
About this file
Attachment 2 Demolition Specifications 109 pages
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 1
DEMOLITION SPECIFICATIONS
DEMOLITION OF VARIOUS FACILITIES AT CCAFS, PAFB AND ANNEXES
DEMOLITION CONTRACT 2
01000
TABLE OF CONTENTS
DIVISION I — GENERAL REQUIREMENTS
01000 General Provisions 01090 Reference Standards 01300 Submittals
DIVISION 2- SITE WORK
02060 Building Demolition 02090 Lead Based Paint Removal 02110 Site Clearing 02211 Rough Grading 02222 Excavating 02223 Backfilling 02831 Chain Link Fences and Gates 02923 Landscape Grading 02936 Seeding 02938 Sodding
DIVISION 13-SPECIAL CONSTRUCTION
13285 Asbestos
DEMOLITION CONTRACT 3
SECTION 01000
GENERAL PROVISIONS
PART 1 — GENERAL
1.01 LOCATION
The work to be accomplished under the contract is at Patrick Air Force Base, Cape Canaveral Air Force Station, and Annexes, Florida. The base is located approximately three miles south of Cocoa Beach on State Road AlA. The station is located approximately three miles north of Cape Canaveral on State Road
528. Annexes are located at Jupiter and Malabar.
1.02 DESCRIPTION
The work covered under this contract consists of furnishing all labor, materials, and equipment necessary to demolish various facilities. Generally the work is as follows:
1. Remove and dispose of asbestos containing materials/components
2. Remove and dispose of lead containing materials/components.
3. Demolish buildings and miscellaneous structures and dispose of materials off base.
4. Demolish and remove foundations and slabs on grade.
5. Disconnect, remove, and cap utilities.
6. Demolish pavements.
7. Backfill in way of demolition.
8. Sodding and seeding.
9. Restore sites to pre-construction conditions.
1.03 REFERENCE STANDARDS AND PUBLICATIONS
DEMOLITION CONTRACT 4
A. The standards and publications listed in each section of these specifications form part of these specifications to the extent referenced. The Contractor shall conform with the requirements of the dated issue of the listed standard or publication. if the project drawings and specifications do not specify a standard, then Brevard County’s codes and regulations apply. In the event of a conflict between codes, the more stringent standard shall apply.
B. Contractor shall obtain copies of all applicable standards and maintain file at project site.
1.04 QUALITY CONTROL
A. The Contractor shall use skilled workers, and adequate number of which are thoroughly trained and have a minimum of 3 years experience in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for the proper performance of the work in each section of these specifications. The Contractor shall submit to the Contraction Officer a copy of the Contractor’s self-inspection system.
B. Licenses: the Contractor or their subcontractors shall be licensed by the State of
Florida or have an equivalent out-of-state license in all areas applicable to this contract. Asbestos Abatement Contractor shall be licensed by the State of Florida.
All required licenses must be provided to the Contracting Officer prior to award of a contract.
1.05 DRAWINGS
The drawings indicate the general location and arrangement of existing conditions. It is strongly recommended that the Contractor visit the site to determine the complexity of the work and the existing conditions affecting the work. Field measurements may be necessary to determine the size and quantity of materials. Conditions which are obvious/visible or which should be reasonably anticipated by the Contractor on inspection will not be considered under the Differing Site Conditions clause of this contract.
1.06 CONTRACTOR PROGRESS:
A. The Contractor shall complete an original AF Form 3064, Contract Progress Schedule, plus three copies, to the Contracting Officer not later than five days after the Notice-To-Proceed is issued. The AF Form 3065, Contract Progress Report, will be accomplished on a weekly basis after the Contractor commences work.
PART 2— SUBMITTALS AND CONTRACTOR FURNISHED ITEMS
A. All submittals, including items requiring drawings, diagrams, certifications, manufacture’s literature, data brochures, technical data, samples, request, forms, and other information as noted in the specifications and on drawings are
DEMOLITION CONTRACT 5
required to be submitted to the Contracting Officer for approval.
B. Approval of submittals does not relieve the Contractor from performance in strict accordance with the specifications and drawings, nor does such approval constitute “acceptance’.
C. Changes required to accommodate approved substitutions shall be made at no additional cost to the Government. For example, an approved motor substitution may require increased electrical cable and conduit.
D. Procure no materials without an approved submittal.
E. The Contractor shall submit five (5) copies of all required submittals on AF Form 3000. Provide a separate AF Form 3000 for each submittal. All items contained within the submittals shall be clearly identified to show specification division/section/paragraph and/or drawing number/schedule. Identify Project Title, Contractor, Subcontractor, Supplier, pertinent drawing and detail number, and specification number on AF Form 3000 for each submittal.
F. All submittals for the entire contract shall be submitted together in single, complete package.
G. Incomplete submittals will be returned to the Contractor without review.
H. The Contractor shall not incorporate any material containing Asbestos, Benzene, Cadmium, Carbon Tetrachloride, Chloroform, Chromium, Cyanides, Dichloromethane, Lead, Mercury, Methyl Ethyl Ketone, Methyl lsobutyl Ketone, Nickel, Perchloroethylene, Toluene, Trichloroethane, Trichloroethylene or Xylene in the work.
2.02 RETURN OF DISAPPROVED SUBMITTALS
The Contracting Officer will return the submittals within 30 days after receipt using an AF Form 3000 to show approval or disapproval. Resubmittals shall be accomplished within 10 days after receipt of disapproval using AF Form, Identify all changes made since previous submittal. Disapprovals shall not be caused for a time extension.
2.03 LONG LEAD TIME ITEMS
The Contractor shall submit evidence of procurement for all potential long lead material items. Submittals shall include written confirmation that the Contractor has entered into a signed contract with a manufacturer or supplier of the item for which this data is submitted. Anticipated delivery dates confirmed by the manufacturer or supplier shall be included and received by the Contracting Officer as indicated in the bidding schedule.
2.04 SUPERINTENDENT
DEMOLITION CONTRACT 6
Provide name and qualifications and past experience for review. Designate a competent superintendent who shall have full authority to act for the Contractor and who shall be the primary contact with the Government until acceptance. The Contractor’s superintendent shall be at the iob site at all times and shall have full authority to act for the Contractor.
2.05 TURN-IN OF IDENTIFIED EQUIPMENT, SPARE PARTS, TOOLS, ETC
Items indicated in construction documents for turn-in to the Government shall be delivered as directed before pre-final inspection. Obtain receipts from Government employees receiving the materials and deliver them to the Contracting Officer before pre-final inspection.
2.06 FINAL INSPECTION
Contractor shall request in writing, a minimum of seven (7) days in advance, for a final inspection. If the Contracting Officer elects to have only a final inspection, turn in pre-final inspection submittals before the final inspection.
PART 3— EXECUTION
3.1 WORK SCHEDULE
A. Unless otherwise stated in the contract, working hours for the Contractor will normally be between the hours of 7:00 A.M. and 4:00 P.M., excluding Saturdays, Sundays and Federal holidays. If the Contractor desires to work during periods other than above, additional Government inspection forces may be required. The Contractor shall notify the Contracting Officer three days in advance of his intentions to work during other periods to allow assignment of additional inspection forces when the Contracting Officer determines they are reasonably available. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days solely for the Contractor, the cost of the inspection at overtime rates will be charged to the Contractor and will be deducted from the final payment of the contract amount.
B. No construction work shall take place over the Christmas/New Year holiday period. This period will start one full workday before the Federal Christmas holiday and end the first work day after the Federal New Year holiday.
3.2 SPECIAL DEMOLITION REQUIREMENTS
A. Each facility, one at a time, will be unoccupied and available to the Contractor during construction.
B. Controlled Areas: Some areas are under the protection of the Air Force Security
Police. The Contractor shall comply with all security regulations imposed by this activity. The Contractor, subcontractors, and all of their employees shall have
DEMOLITION CONTRACT 7
access only to those areas required for execution of this work.
C. Access: All Contractor personnel must be approved by the Contracting Officer and badged for entry prior to commencing work. The Contractor shall complete an access list for all employees, including subcontractor personnel, if applicable, and forward such list to the Contracting Officer prior to anticipated entry. Blank forms are obtainable in the Contracting Office.
D. Badges: All Contractor personnel shall display badges while working in the controlled area.
E. Contractor access to Cape Canaveral Air Force Station: Access may be restricted on the day of a scheduled rocket or shuttle launch. If the Contractor is working, promptly vacate the area when notified by Safety or Security Police personnel.
F. Modifications or Changes: The Contractor shall comply with any modifications or changes in the military security requirements prescribed in writing by the Commander of the Air Force installation at which the work under this contract, or any part thereof, is being performed. Whenever the Contractor is notified by the installation Commander of a military security requirement, the contractor shall notify the Contracting Officer of the change within five (5) days of the change.
G. Access to Facilities to be Demolished: Contractor is responsible for clearing trees, brush, and other vegetation to gain access to Facilities to be demolished.
3.03 UTILITIES
A. Utility outages shall be requested in writing to the Contracting Officer a minimum of fourteen (14) days prior to desired outage. Outages shall be limited to a four (4) hour maximum at any one time, unless otherwise approved by the Contracting Officer due to unusual circumstances. Existing utility services may be interrupted only when approved by the Contracting Officer. The interruption shall be scheduled at a time of minimum demand on the utility, convenient to the Government. Outages on weekends, holidays, or evenings shall be performed at no additional cost to the Government.
B. The Contractor shall make all necessary arrangements to schedule and provide connections to existing utilities and to cause minimum interruption to system operation. All temporary utility hook-ups and disconnects shall be made by the Contractor.
C. If the Contractor fails to comply with a scheduled outage, the cost to reschedule the outage will be deducted from the final contract payment.
3.04 LAYOUT OF WORK AND ELEVATIONS
DEMOLITION CONTRACT 8
The Contractor shall verify dimensions and elevations indicated in the layout of work. Discrepancies between the drawings, specifications and br existing conditions shall be referred to the Contracting Officer in writing, for review, before the affected work is performed. Failure to make notification shall place the responsibility upon the Contractor to carry out the work in a satisfactory and workmanlike manner.
3.05 STORAGE, TRANSPORTATION AND PROTECTION
A. Contractor shall be assigned a storage area upon written request to the Contracting Officer for the base and/or at Cape Canaveral Air Force Station.
Contractor’s request shall indicate dimensions of trailer, size of storage area, and utilities required. The Contracting Officer will assign space at one of the central storage areas to the Contractor. All trailers shall be in good and safe condition.
For PAFB, office trailers and long term storage trailers should be painted to match the base standard color “Conch Shell”, as noted in the base Facilities Excellence guide. Trailers located on site for short-term storage, 10 or less days, will not need to meet this requirement. In addition, all office trailers and long-term storage trailers, either at PAFB or CCAFS shall be skirted along the entire perimeter with a wood lattice material. This skirting shall be painted to match the same trailer color as described above at PAFB. Contractor shall be responsible for the storage and protection of all his materials and equipment, whether incorporated into the job or not. The Contractor shall also be responsible for enclosing the assigned storage area with a minimum 6’ high privacy fence. The fence shall be chain link wire, with a brown nylon screen covering as approved by the Contracting Officer. The fence shall be in good repair and continuously maintained throughout the contract. The intent is to conceal construction materials, equipment and debris from adjacent occupied areas during the life of the contract. Upon completion of the contract, the Contractor shall be responsible for removing the fence and restoring the site to it original condition. (See FAR 52.236-10, Operation and Storage Area)
B. Store and protect products in accordance with manufacture’s instructions. Store products with seals, labels intact and legible. Store sensitive products in weather tight, climate controlled enclosures in an environment favorable to the product.
Products acceptable for exterior storage shall be on sloped supports above ground.
C. Transport and handle products in accordance with manufacturer’s instructions.
Promptly inspect shipments to insure the products comply with requirements, quantities are correct, and products are undamaged. Protect products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products. Store loose granular materials on solid flat surfaces in a well drained area. Prevent mixing with foreign materials.
D. Hazardous Materials & petroleum product containers shall be stored on an impervious surface with containment. Incompatible material shall be segregated and have separate containment systems. All containers must be properly labeled to indicate their contents.
DEMOLITION CONTRACT 9
3.06 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT AND
VEGETATION
The Contractor shall replace or repair contractor damage to Government property as directed by the Contracting Officer.
3.07 CLEANUP AND DISPOSAL
A. The Contractor shall keep the contract area, including storage areas, free from accumulation of waste materials or rubbish at all times. Contractor shall also cut the grass within the contract area(s) and storage area(s).
B. All waste materials, except indicated salvaged items and hazardous waste, generated by the demolition shall be hauled off U.S. Government property at the end of each workday and deposited at a disposal site selected by the Contractor.
Disposal shall be in accordance with federal, state, county, and city ordinances and at the expense of the Contractor.
C. Upon completion of the contract, the Contractor shall leave the work premises in a clean, neat and workmanlike condition, satisfactory to the Contracting Officer.
3.08 RADIO FREQUENCY MANAGEMENT PROCEDURES
The following procedures shall be followed in obtaining radio frequency authorization:
1. The policy and procedures contained in AFI 33-1 18 shall be followed to obtain frequency allocation approval of electronic devices and USAF Radio Frequency Assignment.
2. Frequency allocation proposals, presented on DD Forms 1494, Shall be submitted via the Contracting Officer for processing through Air Force channels.
3. Attach FCC Forms 130 to the basic frequency allocation proposal, DD Form 1494, for space systems and their associated earth terminal transmission equipment.
4. Frequency assignment requirements shall be presented in Standard Frequency Action
Format (SFAF) and submitted in accordance with AFR 700-1 4, Attachment 6.
5. Further administrative guidance is available from the 45th Space Wing Frequency Manager.
3.09 COMMUNICATION SECURITY
Government telecommunications networks are continually subject to interception by hostile/unfriendly intelligent organizations. Therefore, the DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls from, or terminating, DOD organizations. The Contractor shall assume the responsibility for ensuring frequent dissemination of this information to all employees dealing with
DEMOLITION CONTRACT 10
official DOD information.
3.10 CONTRACTOR EMPLOYEE IDENTIFICATION
A. The place of performance for work is Patrick Air Force Base and/or Cape Canaveral Air Force Station, Florida. The Contractor and his employees shall comply with all the security and law enforcement requirements imposed by the respective local installation Commander at all times.
B. When working on Patrick Air Force Base, the Contractor’s employees are required to have in their possession a current AFSPC Form 122. DD Form 1172, Application for Civilian Identification Card, will be used to obtain the AQFSPC Form 122. The Contractor will insure that it’s personnel process DD Form 1172 through the Pass and Registration Section, Bldg. 537, Patrick Air Force Base. All AFSPC Forms 122 must be turned in prior to final payment of the contract.
AFSPC Form 122 is not required for contractor employees whose contracts have an expiration date of (1) year or less. Contractor employees will be issued an AF Form 75 for those contract periods of less than one (1) year. (For entry into designated restricted areas, contractor employees must have in their possession Contractor Form 1199, Automated Entry Control Card(AECC). AF Form 2586, Unescorted Entry Authorization Certificate, is required to obtain Contractor Form 1199). The Contracting Officer or his/her authorized representative will issue applications for obtaining these identification cards/badges to the contractor.
C. Cape Canaveral Air Force Station (CCAFS) Badging Requirements:
1. When working on Cape Canaveral Air Force Station, the Contractor’s employees are required to have in their possession a current AF Form 1201/1 202, USAF Controlled Area Badge or Contractor or Air Force(CF/AF Form 1199, Entry Control Card. Personnel requiring unescorted entry into restricted areas must have in their possession CF/AF Form 1199, Entry Control Card.
For access to Controlled Areas, personnel must possess the CF/AF Form 1201/1202. AF Form 2586, Unescorted Entry Authorization Certificate, is required for both forms. The issue of both the CF/AF Form 1201/1 202 type badges will be required for those employees requiring unescorted entry into both restricted and controlled areas. The Contraction Officer or his/her authorized representative will issue applications for obtaining these identification cards/badges to the Contractor. The Contractor will insure it’s personnel process AF Form 1201/1202, USAF Controlled Area Badge, through the Pass and Registration Section, Building 1068, at Cape Canaveral Air Force Station. The CF/AF Form 1199 is issued through the Enrollment Center, Building 1068, at Cape Canaveral Air Force Station. All badges and credentials must be turned in prior to final payment of the contract.
2. Those individuals with Pass signature authorization may badge contractor/subcontractor employees via the following two methods: 1) submit a letter or FAX to the Pass and ID office at CCAFS, P0 Box 1228/Mail Unit 5411, Cape Canaveral, FL 32920-1228, FAX 321-853-3441; or2) telephone
DEMOLITION CONTRACT 11
Pass and ID (321-853-5261). The information necessary for the employees to receive a badge includes the following:
A. name (in alphabetical order) B. social security number of the designated individual(s) C. contract number D. location of the work to be performed E. period of performance
3. Those employees working in general areas of CCAFS are required to have in their possession a current Cape Visitor Badge. These may be obtained at the CCAFS Pass and ID office (Bldg. # 1068) or PIDS Ill on the NASA causeway after the above mentioned information is submitted. Current picture identification is required. Upon contract completion, the contractor shall be responsible for retrieval of the badges and return to Pass and ID, CCAFS, within 10 days of the completion date.
4. Listing of Personnel: Submit a numbered listing of all personnel who will be working in the area to the contracting officer at the post award conference. This list will be used for access control.
5. Nonaccess Periods: Government operations have priority over contractor operations. No digging or excavation will be allowed during specific launch windows operations unless a waiver is granted to the contractor. Contractor should contact the contracting officer to obtain a current listing of “no dig” days before work on a specific delivery order occurs.
3.11 VEHICLE REGISTRATION
A. No later than five (5) days before the contract start date, the Contractor shall submit, to the 45 SPS/SPAP, a list of employees (including those of any subcontractor) who will require access to Patrick Air Force Base. The list (alphabetized) will include the names and social security account numbers of the employees, the contract number, and the duration of the contract. This letter must be coordinated through the Contracting Officer before an AF Form 75 can be issued (see paragraph (D) below).
B. After submission of the list, the Contractor and each employee on the list may, between the hours of 7:30 AM and 4:00 PM weekdays go to the Pass and Registration Section in Building 537, located adjacent to the Main Gate, where after presentation of a valid state registration, a valid drivers license, and proof of insurance, he/she will be issued a AF Form 75, Visitors/Vehicle Pass for vehicle registration. The registration will be for the length of the contract, not to exceed 365 days.
C. It will be the Contractor’s responsibility to update the list whenever new employees are hired or an employee is dismissed or quits. The project manager designated on the initial list may make minor additions or deletions in writing to
DEMOLITION CONTRACT 12
the 45 SPS/SPAP for personnel changes without going through the Contracting Officer. Should the contract completion date be extended, the Contractor shall submit a current list of employees to the 45 SPS/SPAP. The new list shall reflect the revised contract completion date. It shall be the responsibility of each registrant to renew his/her AF Form 75 following the procedures set forth in (A) and (B) above. The Contracting Officer will provide the 45 SPS/SPAP with an updated letter reflecting the new completion date of the contract whenever there is a contract extension. The AF Form 75 cannot be extended prior to receipt of said letter.
D. The DOD Form 2220, DOD Registered Vehicle, is not required for entry to Cape
Canaveral Air Force Station, Florida. However, the operator of the vehicle shall have in their possession a current AF Form 1201/1 202, USAF Controlled Area Badge, Contractor Form 1199 (AECC) of AF Form 1199, Entry Control Credential, which shall be shown to the gate guard to gain entry.
3.12 DIGGING/EXCAVATION REQUIREMENTS
A. Work Clearance Request: Prior to any digging, an Excavation permit will be required To obtain an excavation permit, contact SGS Mission Support, Excavation Administrator, at 861-4453. Additionally, an Air Force Form 103, BCE Work Clearance Request, will be required. Contact the Cape Superintendent for guidance on the use of AF Form 103.
B. Location of Buried Structures and Utility Lines: Accurately locate and stake structures and utility lines indicated. Provide a drawing indicating the full extent of digging/excavation (width, depth, and length of trench or hole) and attach to the AF Form 103. If unidentified underground utilities are encountered during excavation, notify the Contracting Officer and cease operation until they are properly identified.
C. Verification of TCP: After obtaining immediate clearance from Cape Support for verifying any Test Control Periods (TCP’s) and the Contracting Officer, the Contractor shall proceed with excavating work, or other surface penetration work.
D. Excavation. Trenching, and Backfilling: Open only those trenches for which material is ready to be placed. If ground disturbing activities are adjacent to a ditch or other surface water, silt barriers or other erosion control devices must be used to prohibit runoff. As soon as approved by the Technical Representative, trenches shall be backfilled and tamped as required by drawings and specifications. As a minimum, the topsoil shall be replaced and the disturbed area shall be grassed by seeding, watered and maintained for a minimum of 60 days.
Stockpile excavated materials a minimum of two feet from the edge of the excavation. Mark or barricade construction work which may present a hazard.
E. Cutting of Roads, Streets, Driveways, and Paved Areas: Repair roads, streets, and paved parking areas which require surface cutting under this project within 10 days after initial cutting. The topping shall be a minimum of 2 inches of asphalt
DEMOLITION CONTRACT 13
(concrete topping on asphalt areas is not allowed). Mark, barricade, and illuminate construction work on or near roads or streets which may present a traffic hazard per OSHAI 910 (1995) and 1926 (1995). The Contractor shall provide signaling, lighting, and barricades in the construction area conforming to the Manual on Uniform Traffic Control Devices (1972), OSHA Standards 1926.201 and
1926.202 (1996). Closures of streets, parking lots, and other traffic areas will not be permitted unless approved by the Contraction Officer after written request 14 days before the scheduled closure.
3.13 GOVERNMENT-FURNISHED MATERIALS:
A. None.
3.14 SALVAGEABLE MATERIALS
A. All materials, equipment and metals identified below shall be salvaged for the Government by the Contractor. Salvaged items shall be stripped of coverings, segregated and hauled to the Patrick AFB or to the Cape Canaveral AFS Defense Reutilization Marketing Office (DRMO) Storage Area and off loaded at the location(s) selected by the DRMO personnel at the expense of the Contractor
B. The following equipment and materials shall be salvaged for the
Government:
All metals shall be salvaged.
The Contractor shall salvage metals as part of his demolition costs.
3.15 SAFETY AND HEALTH REQUIREMENTS
A. The Contractor shall submit a comprehensive accident prevention plan. This plan shall address all hazards and safety precaution associated with this contract. The Contractor is responsible for insuring that all company employees and any subcontractors associated with this contract comply with the company’s approved safety plan. As a minimum, include items identified under the section defining the scope of work to be accomplished, i.e. saw cutting, drilling, excavation, cleaning, painting and any other activities involving chemicals. Address other areas as applicable, e.g., where there is a danger to the public or workers, warning signs must be placed near the hazardous area.
B. The contractor must submit a site specific health and safety plan that includes, at a minimum, verification that workers have received appropriate hazard communication training, and training required by the lead, cadmium, and asbestos construction standards, if these commodities will be potentially disturbed during demolition operations. If personnel will be required to use respiratory protection, they must also meet the requirements established in the OSHA respiratory protection standard, 29 CFR 1910.134.
C. The Contractor shall comply with State of Florida Department of Transportation
DEMOLITION CONTRACT 14
regulations in regard to safety, barrier and marking requirements for road construction.
3.16 FIRE PROTECTION
The Contractor shall be responsible for furnishing adequate and proper fire protection for all phases of the contract work. The Contractor shall immediately notify the Base Fire Department for all emergencies (Dial 9l1 from any Base phone). All office trailers and other housing type structures occupied by the Contractor or subcontractors shall be equipped with smoke detectors. Contractor shall obtain a welding/burning permit through the Base Fire Department prior to any welding, brazing or torch cutting. Provide fire extinguishers of proper type and size for each open flame operation to be performed. Minimum: 20 lb, ABC dry chemical.
3.17 ENVIRONMENTAL REQUIREMENTS
A. General Conditions: It is the Contractor’s responsibility to assure all work to be accomplished will be in compliance with federal, state, and local environmental regulations. Contractor shall perform work in strict accordance with all conditions specified in the environmental permits. The required permits shall be obtained prior to start of construction and posted at the job site. The Contractor shall ensure all notification required by any permits or regulations have been made to the applicable regulatory agency through CES/CEV for PAFB activities and through the Environmental Support Contractor (ESC) for CCAFS and the Florida Annexes activities.
B. Storage and Protection: Contractor shall be responsible for the storage and protection of all materials, equipment, and wastes, whether incorporated into the job or not. All containers must be properly labeled to indicate their contents. Hazardous Materials and Petroleum Product Containers shall be stored on an impervious surface with proper containment. Incompatible materials shall be segregated and have separate containment systems.
C. Cleanup and Disposal: Disposal of any wastes or material to the Base sewage treatment system must be approved by the Contracting Officer in writing and coordinated with Base Environmental Office. Management and disposal of any materials or non-hazardous wastes and any cleanup of contaminated property shall be in accordance with federal, state, county regulations at no additional cost to the Government. The Contractor must provide the Air Force proof of hazardous waste training and a job description which meet the requirements of 40 CFR 265.16, prior to generating any hazardous waste. Hazardous wastes shall be managed by the Contractor in accordance with 40 CFR 262-279, FAG 62-730, and the 45th Space Wing OPLAN 19-14 at the Contractors expense, and shall include the following at a minimum: management of one or more hazardous waste accumulation sites; provide portable fire extinguishers, eyewash stations and required signs for each hazardous waste accumulation site; provide appropriate Department of
DEMOLITION CONTRACT 15
Transportation (DOT) containers for storing hazardous wastes; properly mark and label containers; perform and document required weekly hazardous waste accumulation site inspections; provide spill equipment; provide drum handling equipment; provide sampling and laboratory analysis of wastes generated; submit analysis results to the Contracting Officer for hazard determination; prepare internal manifest and deliver the drums of hazardous waste to the designated on-base storage facility within time frames specified by the Government. Locations of accumulation sites shall be approved by the Government prior to generating hazardous waste. Contractor shall provide enclosed, lockable storage for hazardous waste containers. Hazardous materials shall not be stored in same location as hazardous waste. The Prime Contractor shall be responsible for ensuring subcontractors are in compliance with all hazardous waste requirements. The Contractor must provide the Air Force proof of hazardous waste training and a job description which meet the requirements of 40 CFR 265.16, prior to generating any hazardous waste.
D. Fire and Chemical Spills: The Contractor shall notify the Base Fire Department (Dial 911 from any Base phone) in the event any fire or release of any chemical into the environment including air emissions, as well as, spills inside or outside of a building.
E. Hazardous Materials/Wastes:
1. The Contractor shall follow all requirements found in any and all Air Force, federal, state, and local statutes, rules, regulations and policies pertaining to the handling, treatment, disposal, etc., of any hazardous wastes and/or materials used or discovered in the performance of this contract including, but not limited to the obligations in 40 Code of Federal Regulations (CFR), 42 United States Code (USC), and 62 Florida Administrative Code (FAC). Contractor shall ensure that all personnel have been properly trained in accordance with 40 CFR 265.16 which requires all personnel responsible for managing hazardous waste to be given Hazardous Waste Management training. Training must be accomplished prior to the start of the contract and a list of the personnel who were trained and the type training received must be provided to the Contracting Officer at the preconstruction conference. Contractor shall make trained personnel available for inspection of hazardous waste accumulation sites within one hour of notification by the Government.
2. The Contractor shall notify the Contracting Officer immediately if any contaminated soil, ground water or suspect debris is encountered during excavation, demolition or construction of the project.
3. Submit data on all hazardous materials to be used on this project in accordance with DFARS 52.223-3, Hazardous Material Identification and Material Safety Data. The Contractor shall complete a Hazardous Materials Usage Approval Form and submit to the Contracting Officer at the post award conference.
4. The Contractor shall provide the Contracting Officer, at the post award conference, a list of all “Hazardous Materials” to be incorporated into the contract. The list shall contain a maximum one-time usage quantity, maximum storage quantities, storage location and material safety data sheets. The Contractor
DEMOLITION CONTRACT 16
shall make available to the Government any information required concerning materials, processes, or application to enable the Government to determine if the waste generated by the Contractor is hazardous. The Contractor shall complete and provide data monthly indicating actual quantities of hazardous material used, stored, and hazardous waste generated. The Contractor shall submit copies of signed internal manifests to the Contracting Officer monthly.
5. Fluorescent lamps and silent wall switches contain mercury and shall be managed and disposed of as universal wastes in accordance with federal and state laws and Air Force regulations and policies. Contractor shall ensure fluorescent lamps are carefully handled with minimal breakage and packaged at no additional cost to the Government in accordance with established base procedures as follows:
Lamps must not be taped or fastened to each other and should be packaged to avoid breakage; lamps must be packaged in cardboard boxes specifically designed to ship fluorescent lamps; lamps and cardboard containers must be kept dry; all containers must be taped closed on all sides; containers must be marked with the number of lamps in the container and the length of the lamps; each container must have a Universal Waste label affixed to one end of the container; debris must not be placed in lamp containers (i.e. light guards, wires, etc.; all containers must be palletized with boxes stacked no higher than 6 feet. Contractor shall contact Contacting Officer for disposition of palletized boxes of fluorescent lamps.
Fluorescent bulbs generated at PAFB can be turned into HazMart facility during normal business hours. Those generated at CCAFS can be turned in at Facility 1708 Tuesdays and Thursdays between 1300-1 400 hours.
F. ASBESTOS:
1. Asbestos containing material (ACM) may be hazardous and requires special handling and disposal procedures. If the Contractor suspects the presence of ACM not shown on the drawings or must disturb ACM which is not part of the contract, the Contractor shall immediately inform the Contracting Officer. The Contracting Officer will determine whether removal of the questionable material is required and who will accomplish the removal.
2. ACM has been identified in the contract work area. Removal of the ACM is included in the Contract as shown on the plans and in the specifications. The Contractor shall comply with all Federal, State and Local Regulations concerning the removal and disposal of asbestos containing materials and the protection of all personnel working in and around the work site.
3. The Contractor shall be liable to the Government for all cost incurred to clean up, handle, remove and dispose of any ACM resulting from the Contractor’s actions or non-actions that do not comply with the requirements of this section.
G. LEAD-BASED PAINT:
DEMOLITION CONTRACT 17
Lead-based paint has been identified in the contract work area. Lead-based paint removal can create potential health hazards for workers. All applicable provisions of standards and requirements listed in Section 01000, paragraph 3.15 SAFETY AND HEALTH REQUIREMENTS of this specification, and Occupational Safety and Health Administration requirements 29 CFR 1926.55, 1926.62, and 1926.63 shall be observed by the Contractor. The contractor shall submit a written compliance plan for 45 AMDS/SGPB approval in accordance with 29 CFR
1926.62 or 19626.63 as applicable.
2. The Contractor shall comply with all Federal, State, and Local regulations concerning ambient air quality standards for lead in areas surrounding the lead paint removal operations. Removal of lead-based paint with abrasive blasting, high-pressure water streams, power tools, etc. can produce air emissions containing lead in excess of this standard. Air sampling for lead shall be conducted by the Contractor to ensure compliance with these and all other applicable standards. Environmental controls shall be established prior to any lead-based paint removal.
3. Lead-based paint waste may be hazardous waste. All loose paint, paint chips, blast media and any other suspected contaminated solid residue shall be collected, containerized, and labeled for off Base disposal. Wash and rinse water shall be containerized and sampled prior to discharge to sanitary sewer or grade. The Contractor shall obtain written authorization from the Contracting Officer prior to discharging process waters to sanitary sewer or grade. At no time shall wash and rinse water be permitted to flow to surface waters or storm sewers. Containerized waste shall be tested, stored and disposed of in accordance with paragraph 3.17, Environmental Requirements
4. The Contractor shall be liable to the Government for all cost incurred by the
Government from the Contractor’s failure to comply with the requirements of the Contract documents, including but not limited to cost for fines and penalties and the cost to clean up. Handle, remove, and dispose of any lead-based paint or lead-based paint residues
H. OZONE DEPLEATING CHENMICAL LIMITATION
1. In accordance with the National Defense Authorization Act for Fiscal Year 1993, Title Ill, Section 326 (Public Law 102-484), the Contractor shall not make use of, nor provide to the Government, any chemical, solvent, material, or any system making use of materials, classified as a Class I Ozone Depleting Chemical (ODC).
Class I ODC’s include chlorofluorocarbons (CFL’s-11,-12,-113,-114-115-12-111- 112-211-213-214-215-126, and —217), carbon tetrachloride, methyl chloroform, methyl bromide, HG140A/Methyl Chloroform, HC-10/Carbon Tetrachloride and Halons 1211, 1301, 1202, 2402, and 1011. Contractor shall also comply with the requirements identified in section 608 of the Clean Air Act”.
DEMOLITION CONTRACT 18
2. Contractors working with Class I ODC refrigerants shall comply with all requirements identified in Section 603 of the Clean Air Act.
I. HISTORICAL and ARCHAEOLOGICAL RESOURCES
1. If the Contractor observes items that may have historical or archaeological value, such observation shall be reported immediately to the Contracting Officer and 45 CES/CEVP Cultural Resource Manager so that the appropriate authorities may be notified and a determination can be made as to their significance and what, if any, special disposition of the finds should be made. The Contractor shall cease all activities that may result in the destruction of the resources and shall prevent his employees from trespassing on, removing or otherwise damaging such resource.
For the purpose of this clause, resources shall be defined as arrowheads, Indian pottery, bones (animal or human), and any manmade artifact which pre-dates Air Force occupation of Patrick Air Force Base.
J. ENDANGERED SPECIES
1. Endangered species habitat and nesting sites may be affected by the work. The following species may be affected: Sea Turtles, Gopher Tortoise, Indigo Snake, Least Tern and the Florida Beach Mouse. If the Contractor suspects the presence of any of the above mentioned species, the Contractor shall immediately notify the Contracting Officer.
K. CONNECTION to EXISTING WATER or SEWER LINES
1. The Contractor shall obtain written approval from the Contracting Officer a minimum of 14 days prior to scheduling connection to existing water or sewer lines to ensure all applicable environmental permits are obtained prior to connection.
L. EXTERIOR LIGHTING
1. Only low-pressure sodium lighting fixtures shall be used for exterior lighting applications. Any substitutions or exceptions must be submitted to the Contracting Officer to obtain the appropriate information for the notification.
END OF SECTION
DEMOLITION CONTRACT 19
01090
SECTION 01090
REFERENCE STANDARDS
1 PART 1 GENERAL
1.1 SECTION INCLUDES
A. Quality assurance.
1.2 RELATED SECTIONS
A. Section 0100 General Conditions
1.3 QUALITY ASSURANCE
A. For Products or workmanship specified by association, trade, or other consensus standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Conform to reference standards by date of issue current on date of Contract
Documents.
C. Obtain copies of standards when required by the Contract Documents.
D. Maintain copy at project site during submittals, planning, and progress of the specific work, until Substantial Completion.
2 PART 2 PRODUCTS
Not Used.
3 PART 3 EXECUTION
Not Used
DEMOLITION CONTRACT 20
01300
SECTION 01300
SUBMITTALS
PART 1 GENERAL
A. Submittal procedures.
B. Construction progress schedules.
C. Test reports.
D. Certificates.
A. Section 0100 General Conditions
1.3 REFERENCES (not applicable)
1.4 SUBMITTAL PROCEDURES
A. Transmit each submittal with a separate AF Form 3000 as described in Section 01000— General Provisions.
B. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.
C. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number, and specification section number, as appropriate..
D. Apply Contractor’s stamp, signed or initialed certifying that review, approval, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents.
E. Schedule submittals to expedite the Project, and to the Contracting Officer.
Coordinate submission of related items.
F. For each submittal for review, allow 14 days excluding delivery time to and from
DEMOLITION CONTRACT 21
the contractor.
G. Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work.
H. When revised for resubmission, identify all changes made since previous submission.
I. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.
J. Submittals not requested will not be recognized or processed.
1.5 PROGRESS SCHEDULES
A. Submit initial schedule in duplicate within 14 days after date established in Notice to Proceed.
B. Revise and resubmit as required.
C. Submit revised schedules with each Application for Payment, identifying changes since previous version.
D. Submit a computer generated horizontal bar chart, comparable to Microsoft Project, with separate line for each section of Work, identifying first workday of each week.
E. Show complete sequence of demolition by activity, identifying Work of separate stages and other logically grouped activities, Indicate the early and late start, early and late finish, float dates, and duration.
F. Indicate estimated percentage of completion for each item of Work at each submission.
G. Indicate submittal dates required for shop drawings, product data, samples, and product delivery dates.
1.6 PRODUCT DATA
A. Product Data: Submit to the Contracting Officer for review.
B. Submit five copies of each submittal to the Contracting Officer. Two copies which will be retained by the Contracting Officer upon approval.
C. Mark each copy to identify applicable products, models, options, and other data.
Supplement manufacturers’ standard data to provide information specific to this
DEMOLITION CONTRACT 22
Project.
D. Indicate Product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
E. After review distribute in accordance with the Submittal Procedures article above and provide copies for record documents as described in Section 0100— General Provisions.
1.7 SHOP DRAWINGS
A. Shop Drawings for Information: Submit to the Contracting Officer for review.
B. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
C. Submit five copies of opaque reproductions to the Contracting Officer. Two copies will be retained by the Contracting Officer upon approval.
1.8 SAMPLES
A. Samples For Information: Submit to the Contracting Officer for review.
B. Samples for Selection:
1. Submitted to the Contracting Officer for aesthetic, color, or finish selection.
2. Submit samples of finishes from the full range of manufacturers’ standard colors, textures, and patterns for the Contracting Officer’s selection.
C. After review, produce duplicates and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01000 — General Provisions.
D. Submit samples to illustrate functional and aesthetic characteristics of the
Product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
E. Include Identification on each sample, with full Project information.
F. Submit the number of samples specified in individual specification sections.
DEMOLITION CONTRACT 23
G. Reviewed samples which may be used in the Work are indicated in individual specification sections.
H. Samples will not be used for testing purposes unless specifically stated in the specification section.
1.9 TEST REPORTS
A. Submit for the Contracting Officer’s review.
B. Submit test reports for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents.
1.10 CERTIFICATES
A. When specified in individual specification sections, submit certification by the manufacturer, installation/application subcontractor, or the Contractor, in quantities specified for Product Data.
B. Indicate material or Product conforms to or exceeds specified requirements.
Submit supporting reference data, affidavits, and certifications as appropriate.
C. Certificates may be recent or previous test results on material or Product, but must be acceptable to the Contracting Officer.
1.11 MANUFACTURER’S INSTRUCTIONS
A. When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, adjusting, and finishing, to the Contracting Officer for delivery in quantities specified for Product Data.
B. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or
1.12 MANUFACTURER’S FIELD REPORTS
A. Submit reports for the Contracting Officer’s review.
B. Submit report within 30 days of observation to Contracting Officer for information.
C. Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents.
DEMOLITION CONTRACT 24
2 PART2 PRODUCTS
Not Used.
3 PART3 EXECUTION
Not Used
DEMOLITION CONTRACT 25
02060
SECTION 02060
BUILDING DEMOLITION
PART 1 GENERAL
A. Demolition of designated structures and removal of materials from site.
B. Demolition and removal of foundations and slabs-on-grade.
C. Disconnecting and capping and/or removal of identified utilities.
D. Fence/Wall demolition.
E. Miscellaneous utility demolition.
F. Marine Environment demolition.
G. Miscellaneous demolition.
H. Removal of materials from site.
A. Section 01000 - General Provisions
B. Section 02110 - Site clearing: Clearing outside periphery of structures.
C. Section 02211 - Rough Grading
D. Section 02222 - Excavation
E. Section 02223 - Backfill
F. Section 02923 - Landscape Grading
1.3 SUBMITTALS
A. Submit under provisions of Section 01000 and 01300.
DEMOLITION CONTRACT 26
B. Demolition Plan: Submitted in written form to the contracting Officer at least 14 days prior to the commencement of any demolition work. The plan shall be according to OSHA regulations CFR 29 Part 1926, Subpart T.
C.