Attch_7_CECC_Form_3052.xls

XLS spreadsheet 33 KB Posted

Attached to
Demolish Heritage Launch Deactivation Delta II Complex 17 Phase 2 and Various Locations Federal contract opportunity
Solicitation number
FA2521-16-B-0002
Issued by
Department of the Air Force Space Command

About this file

Corrected Attachment 7 CECC Form 3052 2 pages

View the file

Other files for this federal contract opportunity

Other files attached to Demolish Heritage Launch Deactivation Delta II Complex 17 Phase 2 and Various Locations, newest first.
File Type Posted
Abstract_of_Bids.pdf PDF
Bid_Opening_Attendance_Record.pdf PDF
Attch_13_Answers_to_Questions.pdf PDF
Attch_11_Site_visit_attendance.pdf PDF
Attch_1_SOW_Revised_7_Sep_16.docx DOCX document
FA2521-16-B-0002_IFB_Demo_Amend_0002.pdf PDF
01-40906_a.pdf PDF
11)_Project_Map _Floor_Plans _ _Drawings_V2.pdf PDF
01-40906_WATER_PUMP_STATION__1.pdf PDF
98K01537.pdf PDF
Pages_111-120_Attch_3b_CX_17_Index.pdf PDF
Pages_41-50_Attch_3b_CX_17_Index.pdf PDF
Pages_21-30_Attch_3b_CX_17_Index.pdf PDF
Pages_141-150_Attch_3b_CX_17_Index.pdf PDF
Pages_61-70_Attch_3b_CX_17_Index.pdf PDF
Pages_131-140_Attch_3b_CX_17_Index.pdf PDF
Pages_31-40_Attch_3b_CX_17_Index.pdf PDF
Pages_71-80_Attch_3b_CX_17_Index.pdf PDF
Pages_121-130_Attch_3b_CX_17_Index.pdf PDF
Pages_1-10_Attch_3b_CX_17_Index.pdf PDF
Pages_51-60_Attch_3b_CX_17_Index.pdf PDF
Pages_11-20_Attch_3b_CX_17_Index.pdf PDF
Pages_151-160_Attch_3b_CX_17_Index.pdf PDF
Pages_181-190_Attch_3b_CX_17_Index.pdf PDF
Pages_191-199_Attch_3b_CX_17_Index.pdf PDF
Pages_171-180_Attch_3b_CX_17_Index.pdf PDF
Pages_161-170_Attch_3b_CX_17_Index.pdf PDF
Pages_91-100_Attch_3b_CX_17_Index.pdf PDF
Pages_101-110_Attch_3b_CX_17_Index.pdf PDF
Pages_81-90_Attch_3b_CX_17_Index.pdf PDF
FA2521-16-B-0002_IFB_Demo_Amend_0001.pdf PDF
Attch_10_Badge_Request_45_SFS_Form_V9.pdf PDF
36002 Battery Lab.pdf PDF
11)_HLDDII_PHII_Specifications.pdf PDF
40906 Pump Station 1.pdf PDF
56632 by EOD Delta Laboratory.pdf PDF
Attch_7_CECC_Form_3052.xls XLS spreadsheet
Attch_5_FLSA_WD.pdf PDF
18800 Blockhouse CX20.pdf PDF
70657 ITL X Ray Facility.pdf PDF
Attch_9_GPP_Certification.pdf PDF
70662 Emergency Generator Building.pdf PDF
Attch_6_Haz_Waste_Form.doc DOC document
15507 Elec Gear Trform BMDO.PDF PDF
36003 Electrical Distribution Building.pdf PDF
12)_Demo_CX17_PHII_SOW_V2.docx DOCX document
FA2521-16-B-0002_IFB_Demo_CX20_ _CX17.pdf PDF
Attch_8_Question_and_Answer_Template.docx DOCX document
15530 Pond Contaminated Liquids.pdf PDF
Attch_10_Badge_Request_45_SFS_Form_V9.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3052 CLIN 001

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST FORMPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGETOTALDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
0.000.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.00
0.00
00.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.00
0.000.000.00
0.000.000.00
CECC FORM 3052PAGE 1
INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient
detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples--square yards--SY, cubic yards--
CY, square feet--SF, linear feet--LF, board feet--BF, each--EA, pound--LB).
Col 3 Quantity. Constractor's estimate of quantity required in terms of unit of measure (couldmn 2). Itms and units of measure will
be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price
contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total costs (Col 5) for items listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in
column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the
contract and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on
the last page as follows.
TOTAL MATERIAL COSTS$
TOTAL LABOR COSTS$
TOTAL OTHER DIRECT COSTS$
TOAL DIRECT COSTS$
OVERHEAD$
SUBTOTAL$
PROFIT$
TOTAL PRICE$
DATEFIRM NAME
TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of
incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award
of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a
certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit
with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an
appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that
there be a clear understanding of
a. The existing, verifiable data
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticalbe, the data will be described (with schdules as
appropriate), and made available to the contracting officer or his authorized representative on request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine,
for the purpose of verifying the cost or pricing data submitted, those books, records, documents, and other supporting data which
will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right
may be exercised in connection with any negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88)
*U.S. GOVERNMENT PRINTING OFFICE: 1988-24D-979:51319

Page &P of &N

File details come from the government source that posted it. Updated .