Attch_1_SOW_Revised_7_Sep_16.docx
DOCX document 2 MB Posted
- Attached to
- Demolish Heritage Launch Deactivation Delta II Complex 17 Phase 2 and Various Locations Federal contract opportunity
- Solicitation number
- FA2521-16-B-0002
About this file
Attachment 1 Revised Statement of Work 6 pages dated 7 Sep 16
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DEMOLISH HLDD II FACILITIES
CAPE CANAVERAL AIR FORCE STATION
Statement of Work
For Demolish HLDD II Facilities
· DBEH 08-1617 DEMOLISH HLDD II CX 17A LAUNCH PAD, FAC. 28501 & 28411
· DBEH 08-1620 Demolish HLDD II Misc Group 3, FAC. 28509 & 28515
· DBEH 08-1580 Demolish HLDD II Misc Facs., CX 17
· DBEH 08-1611 DEMOLISH HLDD II DELTA LAB, BLDG 56632
· DBEH 08-1623 DEMOLISH HLDD II PS 1
· DBEH 08-1581 DEMOLISH HLDD II PS 1 AREA
DATE: 7 September 2016
1. OVERVIEW
a. The work to be accomplished under the contract is located at various locations in proximity to Complex 17 (CX 17), Cape Canaveral Air Force Station (CCAFS), Florida. The work involves the demolition of numerous facilities, associated structures, pavement, and site restoration.
b. The contractor shall provide all planning, including work plans and testing, labor, materials, equipment, design and supervision necessary for the demolition and/or deconstruction of buildings/facilities/infrastructure under the Building Demolition Contract at Cape Canaveral Air Force Station (CCAFS). All work shall be done in accordance with the requirements contained in the original contract specifications and any drawings that will be attached as required.
c. No alterations, additions, or deletions shall be made unless approval by the Contracting officer is obtained. The contractor shall thoroughly review the request for constructability and advice of possible problem areas prior to negotiations.
d. All work must be IAW Demolition Specifications unless expressed written permission is received from the Contracting Officer for any deviations. Under no circumstances is the Contractor to begin any work on the Delivery Order until the Contracting Officer issues a "Notice to Proceed".
e. Verify all quantities and dimensions. Note any deficiencies in the Government and customers drawings to the Contracting Officer.
f. The Air Force is committed to effective environment compliance and stewardship activities for the Air Force lands to maintain access to the air, land, and water needed to maintain and improve Air Force mission capability. This commitment is accomplished by complying with federal, state, and local environmental statutes and regulations. Compliance is accomplished under many Air Force programs.
2. SCOPE
The work under this contract consists of furnishing all labor, materials, and equipment and performing all operations in connection with the Building Demolition Contract. Demolition and/or deconstruction work includes removal, transportation and disposal of all items to be demolished, as well as restoration of site demolition as indicated in specifications.
3. DESCRIPTION OF WORK
A. Demolition and/or deconstruction of indicated facility structures in its entirety including building structures, launch complex structures and other industrial facilities. Demolition and/or deconstruction of indicated facilities shall not be limited to load and non-load bearing walls, floor slabs, interior and exterior stairs, windows, exterior doors and roof systems. Demolition of interior wall assemblies, floor, wall and ceiling finishes, interior door assemblies special construction and building infrastructure. Removal and disposal of hazardous construction materials including but not limited to asbestos-containing materials, lead base paint, and PCBs. Facility demolition and/or deconstruction work shall also include electrical equipment, fire alarm and communication systems as well as mechanical systems, where applicable.
a. DBEH 08-1617 DEMOLISH HLDDII CX 17A LAUNCH PAD, FAC. 28501:
i. Perform demolition, removal and site restoration of 48,407 square feet at facility 28501 & 28411 with associated structures and pavement; includes pad, launcher building and ramp with support areas. Demolish all remaining pavement at CX-17 site, excluding areas around tenant assigned facilities. Sample for Asbestos Containing Material. Permit Required
b. DBEH 08-1620 Demolish HLDDII, FAC. 28509 & 28515:
i. Perform demolition, removal and site restoration of L2 storage tank and berm wall formerly dedicated to the Delta II Launch Program with associated structures and pavement. Sample for Asbestos Containing Material. Permit Required
c. DBEH 08-1580 Demolish HLDD II Misc Facs., CX 17:
i. Perform demolition, removal and site restoration of 1106 square feet of Facility 36002 and 36003 associated structures and pavement.
d. DBEH 08-1611 DEMOLISH HLDDII DELTA LAB, BLDG 56632:
i. Perform demolition, removal and site restoration of 9,676 square feet at facility 56632 with associated structures and pavement.
e. DBEH 13-1623 Demolish HLDD II PS 1:
i. Perform demolition, removal and site restoration of 6,640 square feet at facility 40906 with associated structures 40905 (water well), 40909 (water tank), 40906A-1 (diesel tank), and pavement. Work includes the diesel fuel storage tank with enclosure and the waste oil tank supporting the diesel engines within this facility. Permit Required.
f. DBEH 08-1581 DEMOLISH HLDD II PS 1 AREA:
i. Perform demolition, removal and site restoration of support facilities 40904 and 40912 with associated structures and pavement. Sample for Asbestos Containing Material.
B. Ensure asbestos containing material, lead base paint, and PCBs sample results are submitted to the contracting officer.
C. Disconnect and cap utilities and communication conduit 5 feet from building perimeter.
D. Remove all electrical connections back to transformer. Coordinate outage and remove wires to low voltage side of transformer.
E. Contractor shall back fill with compactable materials all holes and other depressions resulting from demolition and/or deconstruction of buildings. Material shall be compacted per demolition specifications.
F. Site restoration: sodding is required for disturbed areas.
G. Demo Location(s) may require special clearance to access; the General Contractor, assigned to that specific project will escort and obtain work clearance.
NOTE: The above general outline of features of the work does not in any way limit the responsibility of the contractor to perform all work and furnish all labor, materials, and equipment required by the plans and specifications.
4. SALVAGE AND DISPOSAL RECORD KEEPING
Contractor shall maintain and submit quarterly and at the completion of the project to the contracting officer a Disposal Log of all materials removed from the job site. This inventory shall include waste materials disposed in landfills and materials reused on the job, sold for salvage and recycled. At a minimum the Contractor shall identify the type of materials, material weight, disposition (landfill or recycle), receiving facility (name, address and phone number). Contractor will take possession of all recyclable material and provide the Government with weight slips for such material.
5. SITE INSPECTION
Contractors are expected to visit the areas of work and verify all conditions and dimensions prior commencement of any demolition work.
6. STORM PROTECTION
Should warnings of high winds or lightning be issued, the contractor shall take every practical precaution to minimize danger to persons, to the work, and to adjacent property. These precautions shall include closing all openings, removing all loose materials, tools, and equipment from exposed locations, and removing or securing scaffolding and other temporary work.
7. INTERFERENCE WITH STATION OPERATIONS
Permission to interrupt any utility, communication, operational or traffic service or pattern shall be requested in writing at least 3 working days prior to the date of the desired interruption. The Contractor shall receive approval in writing from the Contracting Officer before the requested interruption may be put into effect. Any power outage shall be approved by the Contracting Officer in writing.
8. SAFETY
The Contractor shall perform all excavation according to Occupational Safety and Health Administration 1926 Subpart P.
9. SCHEDULING
The Contractor shall submit a schedule of proposed work to the Contracting Officer using AF Form 3064 for approval. The schedule shall show the proposed activities, including locations where work is planned and planned shutdown of equipment. All work sequencing and phasing is subject to the approval of the Contracting Officer.
10. SUBMITTALS
Five (5) copies of submittal information (or electronic PDF files of the submittal package) for all listed items must be submitted on AF Form 3000. Material submittals must be submitted as a complete package for each specification section, ready for the Contracting Officer's approval (Page 110-111 Demolition Specifications).
10. SITE LOCATION
CX 17 Cape Canaveral Air Force Station, Florida image3.jpeg image4.PNG image1.png image2.png
File details come from the government source that posted it. Updated .