Attach 4 Sample Schedule Plan for Mowing Contractor Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0005.docx | DOCX document | |
| Amend 0004.docx | DOCX document | |
| Atch 1 PWS Mar 2011.docx | DOCX document | |
| Amendment 0003.docx | DOCX document | |
| Attachment 1 Amendment 0003.docx | DOCX document | |
| Attachment 2 PWS Mar 2011.docx | DOCX document | |
| Atch 2 PWS 14 Feb 11.docx | DOCX document | |
| Atch 3 Conformed Amend 0002.doc | DOC document | |
| Amend 0002.docx | DOCX document | |
| Atch 1 Site Visit Minutes.docx | DOCX document | |
| Performance Plan.pdf | ||
| Amendment 0001.docx | DOCX document | |
| RFP Attch 3 Wage Determination 2005-2080.pdf | ||
| RFP Attch 5 Staffing Plan with min numbers.docx | DOCX document | |
| RFP Attch 2 Perf Plan 20 Dec 10.doc | DOC document | |
| RFP 09-R-5002 12Jan11.docx | DOCX document | |
| RFP Attch 1 PWS 10 Jan 11.docx | DOCX document | |
| DRAFT PWS Grounds Maint 30Apr09.doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule Breakdown for Mowing at PAFB
PAFB has approximately 92 acres of improved grounds (map provided below) that require mowing, edging, and clean-up each week. The areas are a combination of open areas and confined areas with numerous obstacles at every location. There are approximately 100 facilities surrounded by sidewalks, planted shrubs, mulch beds and trees, and there are street islands with shrubs and trees.
The growing season is approximately 31weeks and the service is required typically 1(one) time a week during this season. Based on the acreage, required schedule, and varying landscape layouts, a variety of equipment and personnel will be needed to ensure the areas can be maintained IAW the PWS.
Based on your anticipated amount of equipment and personnel necessary to effectively maintain the acreage (for the anticipated timeframe of 31 weeks), Offeror shall complete a sample schedule plan and fill in the appropriate information below.
| Equipment Type and Description |
| QTY Equipment |
| QTY Full Time Equivalent / Personnel |