DRAFT PWS Grounds Maint 30Apr09.doc

DOC document 365 KB Posted

Attached to
Grounds Maintenance Service Federal contract opportunity
Solicitation number
FA2517-09-R-5002
Issued by
Department of the Air Force Space Command

About this file

DRAFT Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Grounds Maintenance Service, newest first.
File Type Posted
Amend 0005.docx DOCX document
Amend 0004.docx DOCX document
Atch 1 PWS Mar 2011.docx DOCX document
Attachment 1 Amendment 0003.docx DOCX document
Amendment 0003.docx DOCX document
Attachment 2 PWS Mar 2011.docx DOCX document
Amend 0002.docx DOCX document
Atch 2 PWS 14 Feb 11.docx DOCX document
Atch 3 Conformed Amend 0002.doc DOC document
Atch 1 Site Visit Minutes.docx DOCX document
Performance Plan.pdf PDF
Amendment 0001.docx DOCX document
RFP 09-R-5002 12Jan11.docx DOCX document
RFP Attch 5 Staffing Plan with min numbers.docx DOCX document
RFP Attch 2 Perf Plan 20 Dec 10.doc DOC document
RFP Attch 3 Wage Determination 2005-2080.pdf PDF
RFP Attch 1 PWS 10 Jan 11.docx DOCX document
RFP Attch 4 Sample Schedule Plan for Mowing Ktr Sched.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

PERFORMANCE WORK STATEMENT (PWS)

FOR

GROUNDS MAINTENANCE SERVICES

GROUNDS MAINTENANCE PWS

TABLE OF CONTENTS

1.DESCRIPTION OF SERVICES

1.1. MAINTAIN IMPROVED GROUNDS

1.1.1. MOW

1.1.1.2 SEMI-IMPROVED WITH IRRIGATION

1.1.2. EDGE

1.1.3. TRIM

1.1.4. IRRIGATION

1.1.4.1 OPERATION OF IRRIGATION SYSTEMS

1.1.4.2 MAINTENANCE OF IRRIGATION SYSTEMS

1.1.4.3 TEST

1.1.4.4 BACKFLOW PREVENTION DEVICES

1.1.4.5 CONTROL OF HAZARDOUS CROSS-CONNECTIONS

1.1.5. REMOVE DEBRIS/POLICE GROUNDS

1.1.5.1 DEBRIS REMOVAL AND DISPOSAL

1.1.5.2. STORM DEBRIS

1.1.5.3 SNOW DEBRIS REMOVAL

1.1.5.4 TUMBLEWEED DEBRIS

1.1.5.5 DEAD ANIMALS

1.1.5.6 LEAF REMOVAL/PINE NEEDLES

1.1.6. FERTILIZATION

1.1.7. AERATE SOIL

1.1.8 REMOVE, REPLACE, TRANSPLANT AND/OR PLANT,TREES,SHRUBS AND PERENNIAL FLOWERS

1.1.8.1 SIZE OF PLANTS

1.1.8.2 NEW PLANTING

1.1.8.3 WARRANTY

1.1.9 PEST AND WEED CONTROL

1.1.10 LAWN REMOVATION

1.1.10.1 GENERAL LAWN REPAIR

1.1.10.2 REPAIR GRASS – SEMI-IMPROVED GROUNDS WITH IRRIGATION

1.1.10.3 MAINTAIN ROCK BEDS

1.1.10.4 MAINTAIN PLANT BEDS

1.1.10.5 MAINTAIN DECORATIVE STONE/PAVERS

1.1.10.6 MAINTAIN RED BREEZE PATHS

1.1.10.7 REPAIR EROSION

1.1.11 PRUNE SHRUBS, HEDGES AND OTHER PLANTS

1.2 MAINTAIN SEMI-IMPROVED GROUNDS

1.2.1. MOW

1.2.2 TRIM

1.2.3 AIRFIELD COORDINATION

1.2.3.1 FLIGHT-LINE DRIVERS

1.3 MAINTAIN UNIMPROVED GROUNDS

1.4 MAINTAIN MULCH BEDS

1.5 MAINTAIN SURFACE DRAINAGE DITCHES

1.6 PERFORM SNOW/ICE REMOVAL

1.6.1 PRIORITY AND NON-PRIORITY

1.6.2 REMOVE ICE

1.6.3 SAND BARRELS

1.7 SPECIAL REQUIREMENTS

1.7.1 CONSULTATION

1.7.2 TREES

1.7.2.1 TREE CARE

1.7.2.2 TRANSPLANT TREES AND SHRUBS

1.7.2.3 REMOVE TREES AND SHRUBS

1.7.2.4 TREE STANDARDS

1.7.2.5 TREE AND STUMP REMOVAL

1.7.2.6 EMERGENCY TREE AND STUMP REMOVAL

1.7.2.7 SPECIAL EVENTS SERVICES

1.7.2.8 SPECIAL CUTS

1.7.2.9 PRE-FINAL AND FINAL INSPECTIONS

1.7.3 PLANTING TREES, SHRUBS AND MULCH BEDS

1.7.4 LANDSCAPE PROJECTS

1.7.4.1 GENERAL

1.7.4.2 PROVIDE DETAILED COSTING INFORMATION

1.8 EMERGENCY

1.8.1 EMERGENCY SERVICES

1.8.2 EMERGENCY HOURS

2. SERVICES SUMMARY

2.1. QUALITY CONTROL PROGRAM

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1. FACILITIES

3.1.1.1. SQUARE FOOTEAGE (INTERIOR)

3.1.1.2. SQUARE FOOTEAGE (EXTERIOR)

3.2. UTILITIES

3.3. MATERIALS

3.4. SECURITY, FIRE, AND MEDICAL SERVICES

3.5. TELEPHONE

3.6. SOLID WASTE COLLECTION & DISPOSAL

4. GENERAL INFORMATION

4.1. DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT, OR VEGETATION

4.2. ENVIRONMENT REQUIREMENTS

4.3 ENVIRONMENTAL PROTECTION

4.3.1 SCOPE

4.3.2 COMPLIANCE

4.3.3 NOTIFICATION

4.3.4 AIR QUALITY

4.3.5 NATURAL RESOURCES

4.3.6 SOLID WASTE MANAGEMENT

4.3.6.1 DISPOSAL

4.3.6.2 CLEANUP

4.3.6.3 RECYCLING

4.3.6.4 REPORTING

4.4 TOXIC HAZARDS

4.4.1 PESTICIDE APPLICATION

4.4.2 PESTICIDE DELIVERY, STORAGE AND DISPOSAL

4.4.3 PESTICIDE TREATMENT AND HANDLING REQUIREMENTS

4.4.4 PESTICIDE LISTS

4.5 HAZARDOUS MATERIALS/WASTE

4.5.1 HAZARDOUS MATERIALS

4.5.2 HAZARDOUS MATERIALS LISTING

4.5.3 HAZARDOUS MATERIALS INVENTORY

4.5.4 HAZARDOUS MATERIALS USAGE REPORTS

4.5.4.1 QUARTERLY REPORTING

4.5.4.2 FINAL REPORT

4.5.5 COMPLIANCE

4.5.6 DISPOSAL

4.5.7 HAZARDOUS WASTE (HAZWASTE)

4.5.8 UNDERGROUND AND ABOVE GROUND STORAGE TANKS

4.5.9 SPILL RESPONSE

4.5.10 POLLUTION ABATEMENT

4.5.11 PRESERVATION OF ARCHEOLOGICAL AND HISTORICAL SITES

4.5.12 GREEN PROCUREMENT

4.5.13 ENVIRONMENTAL BASELINE SURVEYS (EBS)

4.5.14 NOISE

4.5.15 CONCRETE DISPOSAL

4.6. PERMITS, LICENSES AND CERTIFICATIONS

4.6.1 PLUMBERS

4.6.2 ARBORIST

4.7. HOURS OF OPERATION

4.8. RECOGNIZED HOLIDAYS

4.8.1 BASE CLOSURES

4.9. SECURITY REQUIREMENTS

4.9.1 VEHICLE REQUIREMENTS

4.9.2 EMPLOYEE RESTRICTION

4.10. PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY

4.11 . SPECIAL QUALIFICATIONS

4.12 INTERFACES

4.13 CONTRACTING OFFICER AND CONTRACTING OFFICER REPRESENTATIVE

4.14 WORK CLEARANCE REQUESTS

4.15 SAFETY REQUIREMENTS AND REPORTS

APPENDIX A – GROUNDS DESCRIPTION/WORKLOAD ESTIMATES

APPENDIX B – AREA MAPS OR SITE PLANS

APPENDIX C - DATA REQUIREMENTS

APPENDIX D - DEFINITIONS AND ACRONYMS

APPENDIX E – IRRIGATION SYSTEM DESCRIPTION AND SYSTEM MAINTENANCE PROJECTED WORKLOAD DATE

APPENDIX F - GRASS SEED SPECIFICATIONS

APPENDIX G – APPLICABLE PUBLICATIONS

1. DESCRIPTION OF SERVICES

The contractor shall provide non-personal services, to include all personnel, equipment, supervision, transportation, materials, supplies and other items and services necessary to perform grounds maintenance is performed at Peterson Air Force Base,(PAFB) in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a neat and professional appearance. Maintenance at PAFB grounds to include but not limited to mowing, edging and trimming, pruning, irrigating, irrigation areas, fertilizing, aerating soil, installing new plants, removing. Replacing and transplanting trees, shrubs and perennial flowers, removing snow and ice, supporting special events, providing customer support, and landscape projects. The contractor shall comply with applicable federal, regional, state, and local laws and commercial standards.

1.1. MAINTAIN IMPROVED GROUNDS

1.1.1. Mow. The contractor shall mow all improved grounds to look well manicured, with a neat and professional appearance at all times. Maintain grass height between 2 ½” and 4 inches uniform in appearance, free of skips, gaps, rutting, or scalping. The contractor shall be required to pick up debris, natural and manmade, prior to mowing any area. The contractor shall remove or mulch grass clippings when visible after mowing, before leaving work area.

1.1.1.1. Semi-Improved Grounds with Irrigation. The contractor shall mow grass/weeds on all semi-improved grounds to ensure these areas present an even appearance clear of debris. Height of grass/weeds in semi-improved grounds will not exceed a height of 10 inches nor be cut to a height of less than 4 inches. (Requirement under review).

1.1.2. Edge. The contractor shall edge sidewalks, driveways, street edges, curbs, and other hard surfaced areas located within the improved grounds so that grass height matches surrounding area grasses. Edging shall include removal of vegetation from expansion joints and cracks in sidewalks, driveways, curbs and other hard surfaces. Grass, vegetation and weeds shall be cut back no more than 1/2 –inch from the surface edged, maintaining an even contour with the edged surface, uniform in appearance and free of scalping rutting, and uneven or rough cutting.

1.1.3. Trim. The contractor shall trim grass and weeds around trees, shrubs, buildings, fences, poles, post, fire hydrants, parking lots bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on improved grounds. Trimming height shall match surrounding area grass height. All areas shall be trimmed concurrent with mowing. The contractor shall remove or mulch grass clippings when visible after trimming, before leaving work area.

1.1.4. Irrigation

The contractor shall maintain, adjust, and repair existing lawn irrigation systems during the growing season.

1.1.4.1. Operation of irrigation systems. The contractor shall irrigate improved grounds to maintain the health of the turf ensuring no ponding of water or excessive runoff. This includes lawns, plants, flowers, landscaped areas, and all areas requiring manual watering (see Appendix A and B) The contractor shall manually water “new” trees, shrubs and perennial flowers, as necessary to ensure, moist soil using approved water truck (1000 gal). Manual watering shall be done between the hours of 7:00 a.m. and 4:00 p.m. Monday thru Friday unless otherwise approved by the COR. The contractor is prohibited from connecting to any hydrant within the boundaries of the installation. Contractor shall practice water conservation measures whenever possible and shall avoid overspray onto pavements, sidewalks, roadways, etc. Watering shall be performed during nighttime hours for irrigation systems. If daytime watering for irrigation systems is necessary, contractor shall notify the COR of the reason for daytime watering, and the duration daytime watering will be in progress. Irrigation responsibilities also include setup, monitoring, adjusting, etc., of irrigation system computer, clocks/timers, controllers, pumps, etc.

1.1.4.2. Maintenance of irrigation systems. The contractor shall maintain irrigation systems. Maintenance includes but is not limited to emergency shut-off, draining and charging systems, replacing damaged or broken control devices and sprinkler heads, and repair of ruptured pipes. All repairs will be made IAW the current Uniform Plumbing Code (UPC) to prevent contamination to the base drinking water distribution system. Contractor must follow UPC Disinfection of Potable Water System requirements to include flushing the water system, super-chlorination procedures, standing times, and bacteriological examination requirements. Contractor will provide a copy of all bacteriological sample results to the base Bioenvironmental Engineer (base Medical Authority) once Disinfection of Potable Water System requirements are completed. Maintain equipment and systems to be efficient and in good operational working order. Replacement of pumps, controllers, clocks/timers, or backflow prevention devices is not included in routine maintenance of irrigation systems. A public water system or a consecutive distribution system of a public water system shall have no uncontrolled cross-connections to a pipe, fixture, or supply, any of which contain water not meeting all applicable provisions of the state Primary Drinking Water Regulations. Contractor must ensure all containment devices (backflow prevention devices) shall be tested and maintained as necessary on installation and at least annually thereafter, by a Certified Cross-Connection Control Technician. The irrigation system to be maintained and related workload data is identified in Appendix A and B. In the event of an emergency shut off of the system, the contractor shall make repairs and modifications within a 1-hour response time. This requirement is required 24 hours, 7 days a week only during the times the systems are fully operational. The contractor will be contacted by either the COR or the Fire Department. The contractor shall operate irrigation systems so that adequate pressure exists without causing water pressure reduction in mains that could result in safety or operational problems at any time on the installation.

1.1.4.3. Test. Check/test all systems once a week, between 4:00 p.m. to 8:30 p.m., 15 April through 15 October to ensure they are functional. The COR may approve changes to these hours of operation in advance. Remote control systems and all accessories will be adaptable to existing Rainbird permanent pigtails. The Remote Control Technology TRC2 System shall be used.

1.1.4.4. Backflow Prevention Devices. The contractor shall inspect, test and maintain all anti-siphon or backflow prevention devices IAW the most current edition of the Colorado Cross Connection Control Manual. Perform testing within one year of the date of the last test by a Colorado Certified Cross Connection Control Technician. Prepare annually, IAW AFI 32-1066, Backflow Prevention Device Assembly Test and Maintenance Reports, AF Forms 843, 845 and 848 and make available to the COR. Comply with the City of Colorado Springs Water Code, Section 12.4.1211 that requires repairs or replacement of failed backflow prevention devices within ten days of failure discovery. Newly installed backflow preventers will be tested prior to use of the lines and again within 3 months of installation and reported to the COR.

1.1.4.5. Control of Hazardous Cross-Connections

(a) A public water system or a consecutive distribution system of a public water system shall have no uncontrolled cross-connections to a pipe, fixture, or supply, any of which contain water not meeting all applicable provisions of the Colorado Primary Drinking Water Regulations. (b) A supplier of water shall protect the public water system from contamination in the following manner:

(1) Identify potentially uncontrolled hazardous service cross connections.

(2) Require system users to install and maintain containment devices on any uncontrolled hazardous service cross connections, provided Civil Engineer (CE) has determined that the device is consistent with the degree of hazard posed by the uncontrolled cross connection.

(3) Installation of containment devices shall be approved by the public water system upon installation.

(4) All containment devices shall be tested and maintained as necessary on installation and at least annually thereafter, by a Certified Cross-Connection Control Technician.

(c) Public water systems shall retain maintenance records of all containment devices. Section 1.6.3 requires these records to be available for inspection by (CE) Plumbing shop personnel. All maintenance records shall be kept for three years.

(d) A public water system shall notify CE of any cross-connection, as defined in section 1.5.2(29), within 10 calendar days of its discovery. The cross-connection shall be corrected within 10 days of being ordered in writing by CE to correct the problem. Failure to do so may result in an enforcement order.

(e) Violations shall be subject to the provisions and penalties prescribed by sections 25.1.114 and 25.1.114.1, Colorado Revised Statutes, and to such other actions as provided by law.

1.1.5. Remove Debris/Police Grounds. The contractor shall perform general debris in all areas of improved grounds and additional areas identified in Appendix A and B, Monday through Friday. The contractor shall police items including but not limited to removal and dispose of natural debris, (tree limbs, dry brush, rodent habitats, dead animals, tumbleweeds, etc), and man-made debris (i.e., trash). Debris removal excludes cigarette smoking debris. Police areas to maintain a neat and professional appearance. Government identified debris shall be removed within one hour of notification unless otherwise specified.

1.1.5.1. Debris Removal and Disposal. All debris will be disposed of at the contractor’s expense at an off-base location IAW existing local, state, and federal regulations.

1.1.5.2. Storm Debris. The contractor shall remove and dispose of tree limbs, wind and storm damage debris within 1 workday when debris creates a safety hazard or unsightly appearance to ensure these areas are free of storm debris. This may include weekends and holidays.

1.1.5.3. Snow Debris Disposal. The contractor shall remove and dispose of sand, soil, rock, stones, and other snow debris within 48 hours of snow removal to ensure these areas are free of snow debris. This may include weekends and holidays.

1.1.5.4. Tumbleweed Debris. The contractor shall remove and dispose of tumbleweeds from improved and semi-improved grounds with irrigation, barbed wire and chain link fences, plant beds, rock beds, parking lots, sidewalks and streets to ensure these areas are free of tumbleweeds. Tumbleweed removal excludes unimproved areas.

1.1.5.5. Dead Animals. All dead animals are to be collected for disposal. Prior to disposing, report number and type (bird, dog, cat, unrecognizable, etc.) to the COR, who will forward report to Pest Management and Natural Resources. Contractor shall contact pest management and public health within 10 business days after contract award to get instruction on the protocols for handling dead animals (e.g.,Personal Protective Equipment (PPE) and local disease protections).

1.1.5.6 Leaf Removal/Pine Needles: The contractor shall remove leaves and pine needles in base improved grounds to maintain a neat and professional appearance. Leaf and pine needles removal must be completed within 2 days upon issue of the work order. At other times remove leaves during debris removal.

1.1.6. Fertilization. The contractor shall have a pH adjustment and fertilizer application program. The contractor shall perform a laboratory test of the soil in improved grounds and apply fertilizer and lime using procedures appropriate for the soil conditions found, type of grass and season. Apply fertilizer and other soil amendments to bring soil condition to that suitable for the vegetation being treated.

1.1.7. Aerate Soil. The contractor shall aerate improved grounds each spring prior to fertilizing to provide a uniform coverage. Plugs may be left to deteriorate.

1.1.8. Remove, Replace, Transplant and/or Plant, Trees, shrubs and Perennial Flowers. The contractor shall remove, replace or transplant dead and diseased, insect-infected or damaged trees, shrubs and perennial flowers with the same species unless otherwise indicated by the COR. The outcome of these actions shall result in healthy, pest and disease free plants, shrubs and trees with a neat, clean and freshly manicured appearance. Deciduous trees shall have a single straight stem and a fully branched crown. Conifer trees shall have a single straight stem and heavily branched and uniform appearance.

1.1.8.1. Size of Plants. The size of all plants used for replacement or new planting will be as follows: conifer trees (10 ft height minimum), deciduous trees (2 ½” in trunk diameter minimum), shrubs (2 year grown in 5-gal container, minimum) and perennial flowers (1-gal minimum).

1.1.8.2. New Planting. The contractor shall install new plants as part of the basic grounds maintenance requirement within 5 workdays of COR notification (excludes Landscape Projects). Spray all new trees and transplanted trees with an anti-transpirant to ensure healthy, pest and damage free plants.

1.1.8.3. Warranty. The contractor shall provide as a minimum, a one year warranty from the nurseries or growers from which all new plant materials are purchased. The contractor shall be responsible for replacing any defective plant within appropriated period of such warranty. These warranties shall include labor cost for removal and replacement. Replace plants with the same size and species within 5 workdays.

1.1.9. Pest and Weed Control. The contractor shall provide all management, licenses, laboratory testing, tools, supplies, equipment, transportation and labor to develop and implement an Integrated Pest Management (IPM) plan in the areas covered by this PWS in a manner that will ensure the health and general well being of installation personnel. The common pests on this installation and their abatement should be specifically addressed in the IPM plan and used to determine the workload. The contractor shall use only approved pesticides. All pesticides, herbicides, and rodenticides are defined in DoD and Air Force documents. The contractor shall comply with current federal, state, local, DoD, and Air Force Regulations. The contractor shall ensure that all workers have current state certification for the pest control services being performed. Control weeds in improved grounds through execution of a weed control program appropriate for the area to maintain a professional appearance. Restore grounds made barren where weeds are removed to the level of care of the surrounding area (i.e. semi-improved, improved.etc.) Base pest managers must review and forward to MAJCOM for approval, if the base pest manager agrees with the request prior to using pesticides. All herbicides and pesticides used must be on the installation-approved inventory list and applied by certified personnel. The contractor shall remove weeds and eliminate insects without damaging desirable plants. When herbicide or insecticide is used for weed or insect eradication, follow the most stringent local, state, and federal regulations. The contractor shall submit a report to the COR within 5 working days following each month listing all pesticide applications made. Include pesticide name, use concentration, amount applied, date, and detailed location of use. A DD Form 1532-1 will be provided on request to facilitate record keeping. (Add CDRL) The contractor is subject to inspection by DoD certified applicators/inspectors as well as State Department of Agriculture Pesticides Division or equivalent agency.

1.1.10. Lawn Renovation. The contractor shall renovate lawns in improved grounds as identified by the COR. This work will be issued via a separate work order within two (2) workdays of damage occurrence IAW Appendix A and protect the new sod IAW the Peterson AFB Alternate Water Management Plan as approved by the City of Colorado Springs Utilities for two weeks after installation. Remove any debris to present a neat, clean appearance, renovate deteriorated lawn area to match surrounding areas.

1.1.10.1. General Lawn Repair. The contractor shall repair damaged lawn areas and dispose of any resultant collected debris to extent that a uniform and manicured appearance is restored.

1.1.10.2. Repair Grass - Semi-Improved Grounds with Irrigation. The contractor shall repair damaged grass areas to provide erosion control and re-establish native grasses. Prepare grounds to provide a smooth/drain grade to match existing surrounding areas via a separate work order within 3 workdays of damage occurrence. Match seeding to existing surrounding areas to ensure complete coverage. Use green hydro-mulch with native seed at the rate of 75lbs of hydro-mulch per 1000 square feet to provide adequate stabilization IAW Appendix G.

1.1.10.3. Maintain Rock Beds. The contractor shall repair rock beds using roll top metal edging to match exiting materials within 1 workday of damage occurrence. Upon completion the rock beds will appear smooth, neat and manicured.

1.1.10.4. Maintain Plant Beds. The contractor shall repair plant beds using roll top metal edging to match existing materials within 1 workday of damage. Upon completion, plant beds will appear smooth neat, and manicured.

1.1.10.5. Maintain Decorative Stone/Pavers. The contractor shall repair decorative stone areas to provide a smooth surface matched to existing materials within 2 workdays.

1.1.10.6. Maintain Red Breeze Paths. The contractor shall repair red breeze paths and exercise areas to provide a smooth surface matched to existing materials with 2 workdays of damage occurrence. Upon completion, red breeze paths and exercise areas will appear smooth, neat and manicured.

1.1.10.7. Repair Erosion. The contractor shall repair erosion with hydro-seed or soil to stabilize and restore areas to match the appearance of surrounding areas within 5 workdays of damage occurrence.

1.1.11. Prune Shrubs, Hedges and Other Plants. The contractor shall prune, shear and trim shrubs and other plants to maintain their natural growth characteristics to enhance the beauty and health of the plant. This service will be issued as a work order by the COR. Maintain hedges to their natural mature height and shape. Shear Peterson Blvd hedges to 40 inches in height. Keep all hedges uniform in appearance and shape with new growth not exceeding 4 inches. Prune shrubs, plants, hedges, and ground cover, 3 inches away from buildings, fences, curbing, sidewalks, and other fixed obstacles. All ground cover and plants shall be kept within the bed borders. All plants around landscape and ground lights shall be pruned to allow light usage for its intended purpose. Shrubs and hedges located on street corners, curb easements, etc. shall be pruned to keep from obstructing view of oncoming traffic. Keep areas beneath shrubs and hedges free of all grass, weeds, vegetation, and debris. Remove volunteer tree growth seedlings.

1.2. Maintain Semi-Improved Grounds

Semi-improved grounds are identified in Appendix A and B.

1.2.1. Mow. The contractor shall maintain grass height between 4 and 10 inches in all semi-improved grounds areas except in airfield areas designed as Bird Aircraft Strike Hazard (BASH) areas. Maintain grass height between 7 and 14 inches in BASH areas. Cutting of grass on airfield grounds shall be accomplished only after Airfield Management has approved scheduled times. Maintain a uniform appearance in all areas. Where possible, maintain adjacent areas at or near the same grass heights.

1.2.2. Trim. The contractor shall trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking lots bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on improved grounds ensuring height matches surrounding area grass height. All areas shall be trimmed concurrent with mowing. Remove visible grass clippings after trimming and before leaving work area.

1.2.3. Airfield Coordination. The contractor shall coordinate all activities on the airfield by contacting airfield management. Perform work only after airfield management has approved scheduled times.

1.2.3.1. Flight-line Drivers. Drivers training must be completed prior to operating vehicles or mowers on the flight line. All employees working on airfield grounds shall be required to have an AF Form 483, Certificate of Competency (flight line driver’s license) with them at all times. Street licensed vehicles must have a valid POV pass issued by Airfield Management prior to operating on the flight line. All drivers must check in at the Airfield Operations counter prior to operating any equipment on the flight line. No equipment will be left unattended while working on the flight line. The contractor shall be responsible to ensure foreign objects and debris produced by grounds maintenance is cleared off the flight line before leaving the work area.

1.3. Maintain Unimproved Grounds.

Unimproved grounds are identified in Appendix A and B. Maintain unimproved grounds to a height not exceeding 14” and not less than 4” except BASH areas).

1.4. Maintain Mulch Beds.

The contractor shall maintain mulch beds as identified in Appendices A and B to present a neat and professional appearance. This service will be issued as a work order by the CO. Maintenance activities may include but are not limited to fertilizing, watering, weeding, mulching, debris free and repairing or replacing of damaged plants and shrubs.

1.5. Maintain Surface Drainage Ditches

The contractor shall maintain surface drainage ditches to be free of shrubs, trees, silt and trash to prevent erosion and ensure continuous flow of water. Drainage ditches to be maintained are identified in Appendix B.

1.6. PERFORM SNOW/ICE REMOVAL

1.6.1. Priority and Non-Priority. The contractor shall remove snow and ice from all paved areas, sidewalks, steps, stairs, landings, and entrance ramps as shown in Appendix B. The contractor shall ensure a pathway of 3 feet wide is free of snow accumulation, piles, or drifts by removing all snow and ice from sidewalks, steps, landings, and entrance ramps. The snow in Priority areas (Appendix B), shall be removed when accumulation exceeds one (1) inch or within one (1) hour after snowfall stops. For areas identified as Non-Priority (Appendix B), the contractor shall remove snow when accumulation reaches 3 inches or within 2 hours after the snowfall stops. This may require multiple snow/ice removals each day. Contractor personnel required to remove snow and ice are considered mission essential during base closure or delayed reporting.

1.6.2 Remove Ice The contractor shall immediately remove ice to provide secure footing or safe driving conditions by the snow removal operation or by sanding with washed sand. The contractor will provide all sand material and shall remove and dispose of excess sand accumulation.

1.6.3. Sand Barrels. The contractor shall provide, maintain, and place sand barrels in areas identified in Appendix B. The contractor is responsible for all tools, equipment, and sand material required. The COR shall approve the sand barrels prior to placement. The contractor shall keep the barrels full of sand material throughout the winter season. The contractor shall replace or repair any damaged barrels or lids within one (1) day after COR notifies the contractor. The contractor shall keep the area in and around the sand barrels clean. The contractor will dispose of all trash and debris found in those areas.

1.7. SPECIAL REQUIREMENTS

1.7.1. Consultation. The contractor shall provide verbal or in-person consultation support for field measurements or verification regarding maintenance and landscape management. Use digital color pictures and/or drawings of Peterson AFB grounds for this support within two workdays of COR request. Accompany and advise government personnel on pre-final or final inspections for landscape construction projects performed by other contractors.

1.7.2. Trees. The contractor shall prune trees as necessary. The contractor shall be responsible for identifying all trees that require pruning. Accomplish pruning IAW the American National Standards Institute ANSI A300 Part 1 industry standards. Pruning shall be required to lift, remove, and/or cutback branches that conflict with normal traffic or safety. Prune conifer trees annually from 1 January thru 31 March to encourage density and assure a natural shape with a vertical single-stem unless otherwise approved by the COR. Tip prune spruce trees to encourage density and assure a natural shape. Do not remove live limbs and parts of limbs at a height of 6 inches or more from the ground unless approved by the COR. Prune broadleaf evergreens and plant beds annually or as required. Fine chip and reuse clippings up to 6 inches in diameter as mulch in plant beds. In addition, prune trees that pose public safety hazards. Minimum safety clearances area: 14 feet over streets, 12 feet over driveways, 8 feet over walk areas, 4 feet over buildings, and 1 foot from buildings. Remove trees that pose threats to structures or buildings. Topping and de-horning are not permitted. Prune trees that touch or hang over energized utility poles or power lines. Ensure minimum clearance from primary lines (over 600 volts) of 8 feet. Ensure minimum clearance from secondary lines (under 600 volts, i.e. electric service drops, telephone, and cable TV) of 4 feet. Remove all debris generated from pruning operations. This service is issued as a work order and must be completed within five (5) workdays from notification.

1.7.2.1. Tree Care. The contractor shall brace, cable newly installed trees, guy (to keep tree vertical), and deep water damaged trees after identification. Remove guy wires, cables, straps, and stakes when the trees remain vertical (normally, after one growing season). Adjust wires, cables, and straps as required, to prevent girdling.

1.7.2.2. Transplant Trees and Shrubs. The contractor shall excavate, move and transplant trees or shrubs identified by the COR. Transplanted trees or shrubs shall be maintained until a green and healthy condition is established.

1.7.2.3. Remove Trees and Shrubs. The contractor shall remove and dispose of trees and shrubs that become diseased and die or pose a threat to personnel, structures or utilities. Trees, including the stump, shall be removed completely. If a tree or shrub is not replaced, restore the site to match the surrounding area. A work order will be issued for the removal of trees and shrubs.

1.7.2.4. Tree Standards. The contractor shall perform all tree work IAW contract specifications and the following tree care standards, latest addition.

ANSI A300 – Standard Practices for Tree Care Operations including referenced Combined Federal Regulations (Utility Pruning and Emergency Service Restoration)

ANSI A300 (Part 1) – Tree Pruning

ANSI A300 (Part 3) – Tree Support Systems (Cabling, Bracing, and Guying)

ANSI Z60.1 – American Standards for Nursery Stock ANSI Z133.1 – Safety Requirements for Tree Care Operations

1.7.2.5. Tree and Stump Removal. The contractor shall perform tree and stump removal upon issuance of a work order by the COR. The contractor shall perform stump and perimeter roots removal by completely removing all growth to a minimum of 8 inches below grade. Stumps shall be ground within one (1) workday of the tree removal date. Stump-grinding debris shall be removed the same day grinding is performed. In areas where a lawn sprinkler system exists, the contractor shall backfill with topsoil, and lay sod to match the existing ground grade. In areas where no lawn sprinkler system exists, the contractor shall backfill with topsoil and compact to match existing grades. Trees identified for removal shall be considered within the following categories, large, medium, and sapling, as based on their diameter. The diameter of the tree shall be determined by measuring 4.5 feet above the ground. Trees with multiple trunks shall be measured as follows: All trunk diameters shall be measured. The largest trunk diameter shall be recorded. Each remaining trunk diameter shall be halved. All values will then be added together to obtain the final tree diameter Large Trees: Diameter 36” and above, remove within 10 workdays from the work order date.

Medium Trees: Diameter 24” to less than 36”, remove within 10 workdays from the work order date.

Saplings: Diameter 3” to less than 24”, remove within 5 work days from the work order date.

1.7.2.6. Emergency Tree and Stump Removal. The contractor shall perform emergency tree and stump removal only after the issuance of a work order by the COR.

Large Trees: Remove within 2 workdays from the work order date.

Medium Trees: Remove within 2 workdays from the work order date.

Saplings: Remove within 1 working day from the work order date.

1.7.2.7. Special Events Services. The contractor shall upon notification by the COR through the issuance of an oral or written work order, perform special event grounds maintenance service. During normal duty hours the contractor shall have a 1-hour response time upon receiving a work order. Any service requested after normal duty hours will have a 4-hour response time. Special events include the President’s Visit, Change of Commands, and special visits by distinguished visitors and may last up to five days which may include weekends and holidays. Special events may include mowing, edging, pruning, shearing, and water management on improved and semi-improved grounds. Remove debris prior to event starts and after event ends.

1.7.2.8. Special Cuts. The contractor shall upon notification by the COR through the issuance of a work order, perform special cuts. Provide unit pricing for Special Cuts as shown in Appendix A.

1.7.2.9 Pre-Final and Final Inspections. The contractor shall upon notification from the COR accompany them to pre-final and final inspections of projects completed at PAFB to ensure they meet the contract requirements upon acceptance of the project.

1.7.3. Planting trees, shrubs, and mulch beds. The contractor shall upon notification by the COR through the issuance of a work order, perform planting of trees, shrubs, and mulch beds to include but not limited to: removal and disposal of trees, shrubs, or mulch beds being replaced; and performance of maintenance after planting to include watering, pruning, and insect and disease prevention to promote survivability. Provide unit pricing for planting trees, shrubs, and mulch beds as shown in Appendix A.

1.7.4. Landscape Projects

1.7.4.1. General. Landscape projects include but are not limited to new and/or replacement projects and will be identified to the contractor on occurrence. Project work may consist of planting trees, shrubs, broadleaf evergreens, perennial flowers, sod, ground covers and ornamental grasses, enhancement of irrigation systems and new berm construction, rock installation or removal, decorative stone pavers, flagstone, boulders, mulch, surface grading, hydro mulching, seeding, fertilizing and edging. Numerous projects may be on-going at any given time.

1.7.4.2. Provide Detailed Costing Information. The contractor shall provide written cost information, with applicable field measurements and drawings, to the COR within three workdays after a project has been identified. Cost information will include proposal breakdown of labor, materials, equipment, overhead and drawings, to include all obstacles and site dimensions with square footages and other pertinent data, at the contracting officer’s (CO) request. Proposals will be negotiated and mutually agreed upon by contracting parties and incorporated into the contract by modification.

1.8. EMERGENCY SERVICES. Upon notification by the COR through the issuance of a work order, the contractor shall perform emergency services for damage caused by acts of nature such as storm damage. These services may be required to be performed outside normal duty hours.

1.8.1. EMERGENCY HOURS. Upon notification of any emergency, during normal work hours the contract manager shall respond within one-half (1/2) hour to meet with the COR to receive emergency service requirements. During after duty hours the contractor shall respond within two (2) hours. Upon receiving notification by the COR the contractor shall begin emergency work within two hours.

2. SERVICES SUMMARY

2. SERVICES SUMMARY The contract service requirements are summarized in the following performance objectives (PO) that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each PO. The Services Summary (SS) provides information on contract requirements and the expected level of contractor performance. Established thresholds listed are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. During the first initial 30 days of the contract, two additional errors on each work shall be allowed in an effort to identify normal phase-in problems. Any PWS requirements not included in the SS may still be assessed at any time by the government.

Performance Objective
PWS Para
Performance

Threshold Remedy

PO 1 MAINTAIN IMPROVED GROUNDS

a. Mow

b. Edge

c. Trim

d. Irrigation Systems

e. Leaf Removal

f. Fertilization

g. Pest Control

h. Lawn Renovation

i. Prune Shrubs

1.1, inclusive
No more than 5 valid defects total per month
Re-performance

Within 8 hours of notification

PO 2 Maintain Semi-Improved Grounds

a. Mow Non-Airfield semi-improved areas

b. Trim Non-Airfield semi-improved areas

c. Mow Airfield semi-improved areas

d. Trim Airfield semi-improved areas

e. Mow Taxiway, Runway Edge Lights and Signs

1.2, inclusive
No more than 5 valid defects total per month
Re-performance

Within 8 hours of notification

PO 3

Maintain Un-Improved Grounds

1.3, inclusive
No more than 5 defects per month
Re-performance

Within 1 day of notification or a mutually acceptable timeframe to the CO or COR and contractor.

PO 4 Maintain Mulch Beds
1.4
No more than 3 valid defects total per month
Re-performance

Within 4 hours of notification

PO 5 Debris, Trash and Policing
1.1, inclusive
No more than 3 valid defects total per month
Re-performance

Within 4 hours of notification

PO 6 Tree Pruning
1.7, inclusive
No more than 3 valid defects total per month
Re-performance

Within 4 hours of notification

2.1. Quality Control Program. The contractor shall develop and maintain a quality control program to ensure contracted services are performed IAW this PWS. Develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

2.1.1 The contractor’s inspection instructions, auditing, and testing shall be kept current with contract requirements and encompass all aspects of the contract. The inspection instructions shall include the specific criteria for approval and rejection of services that will be used in each inspection or audit; checklists may be used for this purpose.

2.1.2. The contractor’s inspection instructions shall be submitted to the CO no later than the pre-performance conference. Submit an updated copy to the CO on the contract start date and thereafter as changes occur.

2.1.3 The contractor shall maintain records of all audits and inspections and make available to the government upon request. The quality records shall indicate the nature and number of observations made, the number and type of deficiencies found, and the nature of corrective action taken as appropriate.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1. Facilities

The government will provide the facilities identified below for contractor use in support of the requirements of this contract. In order to comply with environment requirements no welding or painting inside the facility nor washing or steam cleaning vehicles, equipment or tools inside or outside the facility will be allowed. The facility shall be clean and neat at all times, free of hazards and free of unsanitary/unsightly conditions and safety hazards. Failure to comply will result in the contractor losing the use of the facility. The facilities are provided “as is.” Obtain COR approval in advance of making any changes to the facilities. Such changes will be at no cost to the government unless otherwise approved by the COR. The contractor shall ensure facilities are maintained in a neat, clean and professional manner. The COR reserves the right to reallocate and relocate assigned facilities during the term of the contract. Upon completion or termination of this contract, or upon such reallocations or relocations return facilities to the government in the same condition as received, fair wear and tear and approved modifications.

3.1.1. Approximately 1,914 square feet of floor space to be provided.

3.1.2. Approximately 14,950 square feet of exterior space provided.

3.2. UTILITIES

The government will furnish electricity, water, and sewage as necessary for accomplishment of work IAW this contract. All facilities do not receive the same utility services. The contractor shall not change or modify any utility system or component; or connect any contractor property, equipment or system without prior COR review and approval. The contractor shall practice energy conservation in the government provided facilities. The contractor shall ensure compound gate is secured at all times during non-working hours.

3.3. MATERIALS. None

3.4. SECURITY, FIRE, AND MEDICAL SERVICES

The government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available on a cost reimbursement basis.

3.5. TELEPHONE

The government will provide one (1) telephone line in the government provided facility for contractor use in making local commercial calls and on base calls in support of contract requirements. Long distance calls and toll calls are not authorized on government phones. Cell phones will be the primary means of communication with the government. Contractor shall furnish in writing to the CO, COR, CE Service Call Desk and the Fire Department, a telephone number of the contract manager and alternate manager within 5 workdays after contract start date and within 1 workday as changes occur. Ensure the government can contact the contract manager or alternate by phone 24-hours per day, 7 days per week.

3.6. SOLID WASTE COLLECTION AND DISPOSAL. The contractor shall dispose of solid waste generated as a result of activities IAW the PWS. Make all arrangements for disposal of waste ensuring that the waste holding area is kept free of debris. The contractor is encouraged to participate in the base recycle program.

4.0. GENERAL INFORMATION

4.1 DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT, OR VEGETATION

Damages to government buildings, equipment, or vegetation are addressed in clause 52.237-2- “Protection of Government Buildings, Equipment, and Vegetation.

4.2. ENVIRONMENTAL REQUIREMENTS.

In addition to all applicable Federal, State and local environmental codes and regulations, the following specific guidance is provided:

4.3 ENVIRONMENTAL PROTECTION.

4.3.1 Scope. The work covered by this section consists of furnishing all labor, materials and equipment and performing all work required for the prevention of environmental pollution during and as the result of work performed IAW this PWS. The control of environmental pollution requires consideration of air, water, and land and involves noise, solid waste-management and management of radiant energy, hazardous materials, radioactive materials and other pollutants.

4.3.2 Compliance. The contractor shall comply with all applicable Federal, State, and local laws and regulations, and installation regulations concerning environmental pollution control and abatement in order to prevent and provide for abatement and control of environmental pollution resulting from the performance of this contract. Attend government provided training on Hazardous Waste Management, Hazardous Materials Management and Spill Prevention, Containment and Countermeasures.

4.3.3 Notification. The contractor shall immediately take corrective actions to remedy noncompliance after government notification of any noncompliance with the foregoing provisions.

4.3.4 Air Quality. The contractor shall comply with the provisions of any installation air operating permits regarding management of air quality. The contractor may be required by the installation Natural Assets Branch to complete an air emissions questionnaire for activities that are anticipated to generate air emissions. Any equipment or activity that emits or has the potential to emit pollutants or that disturbs solid or liquid materials which can become airborne, is a possible source of air pollution that may require a permit. Activities with anticipated air emissions include but are not limited to painting, stripping, cleaning with degreasers or solvents, material hauling, demolition, sand blasting, use of fuel-burning equipment (other than motor vehicles), welding, use of volatile organic compounds or ozone-depleting chemicals, and remediation activities. Submit required completed questionnaires to the contracting officer a minimum of ten (10) working days prior to commencement of work. See Peterson AFB- Title V Operating Permit, 95OPEP147. See Peterson AFB- Title V Operating Permit, 95OPEP147.

4.3.4.1 The contractor shall prohibit the burning of materials on the installation and shall not create noxious odors.

4.3.4.2 The contractor shall ensure all company-owned and employee-owned gasoline and diesel vehicles that are driven on the installation comply with the emissions inspection requirements of the applicable air quality zone.

4.3.4.3 The contractor shall restrict emissions of all smoke and fugitive particulates to levels less than 20 percent opacity at the point of emission and to levels that do not visibly disperse beyond the installation’s property boundaries unless exempt.

4.3.4.4 The contractor shall be responsible for meeting all requirements, obtain permits, licensing and certification required by state or local ordinance to work on activities involving more than one acre. Provide all obtained permits and licenses to the contracting officer (CO).

4.3.4.5 Fuel Throughput. The contractor shall report to 21CES/CEANQ by the 5th calendar day of each month, the amount of fuel throughput for each gasoline tank for the preceding month.

4.3.4.5.1 Potable Water System. The contractor shall notify the QAE and Bioenvironmental if potable water lines are damaged during work IAW this PWS. Notify the installation Natural Assets Branch, civil engineering utilities shop, and Bioenvironmental when backflow prevention devices are installed. Backflow prevention devices must pass testing by a Colorado certified back flow test technician. Notify the Bioenvironmental office and the utilities shop within 30 days of the certification. (could move this to Section 1.7.4) Contractor shall comply with Article 12 of Colorado Primary Drinking Water Regulations:

4.3.4.5.2 Sanitary Sewer System. The contractor shall not dump any restricted materials down the sanitary sewer disposal system without approval of the installation Natural Assets Branch. All discharges to the sewer shall meet Federal, State, and Local regulatory requirements and shall not exceed the installation permit requirements.

4.3.4.5.3 Storm Sewer System. The contractor shall not discharge any non-storm water discharges to the storm drain system with the exception of irrigation water. Obtain approval from the installation Natural Assets Branch for any non-storm liquid discharge.

4.3.4.5.3.1 Land Disturbances of One Acre or Greater. The contractor shall coordinate with 21CES/CEANQ to obtain co-permit under EPA Construction General Permit. Prior to submission of co-Notice of Intent (NOI) Applications to the EPA, the contractor will provide a Storm Water Pollution Prevention Plan (SWPPP) to 21CES/CEANQ for review and signature. SWPPP must be approved by 21CES/CEANQ prior to submission of NOI. The contractor shall provide a copy of coverage approval letter and SWPPP to the contracting officer upon issuance from the EPA. The contractor shall not begin work until 21 Space Wing (21SW) has received coverage under Construction General Permit. Prior to project acceptance, the contractor must provide a copy of all site storm water inspection records and a final version of the project SWPPP to the contracting officer.

4.3.5 Natural Resources. The contractor shall direct any questions regarding impacts to installation natural resources, wildlife or wildlife habitat through the 21 CES/CEANQ, Natural Resource Manager.

4.3.6 Solid Waste Management.

4.3.6.1 Disposal. The contractor shall handle and dispose of solid waste generated as a result of activities IAW the PWS. Make all arrangements for disposal of any wastes including wastes requiring special handling such as asbestos, rubble, etc. Obtain all required laboratory testing and make any documentation submittals required by landfill owners. Colorado State Department of Public Health and Environment Sciences written approval is required for any non-inert materials such as asphalt containing materials, asphalt roofing materials, steel containing materials, etc., that are to be disposed of in a Class III landfill site. Ensure no waste or materials are left on the installation after completion of any project.

4.3.6.2 The contractor shall ensure all non-hazardous wastes are properly disposed of through a licensed landfill site unless specific provision at the installation allows disposal on the installation…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .