TABLE 1 – SUBMISSION REQUIREMENTS
(Rev #1, dated 4 Feb 10)
| Section |
| Reference |
| General Information / Instructions |
| Page |
Limit
| Table of Contents (TOC) and Tabs |
| Include TOC and “separate” each Section with a tab, e.g., I, II, III, etc. Tabs may cover folder labels. Prefer “Company Name” visible, if possible. |
| 1 |
| I |
| CD |
| Include CD in “Original” file folder only. CD shall contain Sections I –XI. |
| 1 CD |
| MRQ |
| Complete MRQ using “drop down” menu or “fill-in” response, as applicable. Save to CD as an EXCEL doc. |
| 8 |
| II |
| SF 330 Part I, Sections A – C |
| Contract – Specific Qualifications |
| 2 |
Section C
Block 9 Firm Name – Provide DUNS for Prime and Subcontractor(s) following the name of the firm, e.g., ABC Corp (DUNS # 999999999). The DUNS # provided will be used with NAICS 541310 to query PPIRS for performance ratings.
| III |
| SF 330 Part I, Section D |
| Organization Chart of Proposed Team |
| 1 |
Section E
| Resumes of Key Personnel - 1 page per person. |
| 1 ea. |
Section F – Prime Contractor
| Example Projects Prime Contractor (Ref MRQ 2.2) (Limit 8 pages; 1 page per project; 2 projects per task area) |
| 8 |
| VI |
| SF 330 Part I, Section F – Subcontractor(s) |
| Example Projects Subcontractor(s) (Ref MRQ 2.3) (Limit 8 pages; 1 page per project; 2 projects per task area) |
| 8 |
Section G
| Key Personnel in Example Projects - Do not provide separate Section G matrices for prime and/or subcontractor(s). Firms may use an “oversized” or “foldout” page to fit information on one (1) page. Information on the page should be easily viewed; therefore, the page does not have to be affixed to the folder. An oversized or foldout page may be placed in Section VII and not affixed to the folder. Easy viewing is key, and page size is not limited. |
| 1 |
| Block 26 |
| Name of Key Personnel (from Section E block 12) - Add name of firm where individual is employed, e.g., John Smith (ABC Corp) |
| Block 28 |
| Example Projects Listed in Section F - Provide “up to” 16 projects listed consecutively / horizontally across the page, e.g., “1 2 3…11 12 …16” |
| Block 29 |
| Example Projects Key - List projects provided in Section F. Limit 16 projects. |
| Section |
| Reference |
| General Information / Instructions (Continued) |
| Page |
Limit
| VIII |
| SF 330 Part I, Section H |
| Additional Information. (Ref MRQ 3.1) Comments for “Marginal” “Poor,” and “Unsatisfactory” PPIRS ratings, if applicable. (Limit 15 lines per project) |
| 2 |
| Additional Information (Teaming). Firms may submit teaming information on projects submitted for the prime and/or subcontractor(s). Text is limited to six (6) lines total: One (1) line to identify “Project Title” and Period of Performance “PoP” followed by up to five (5) lines of text. |
| 3 |
| IX |
| SF 330 Part II |
| General Qualifications. (Limit 1 page per prime and each proposed subcontractor(s)). A Part II is required for each office (Prime and/or subcontractor(s)) that will perform services as described in the SS/RFI. |
| 1 ea. |
| X |
| Labor Categories |
| Provide “primary” labor categories and levels, as applicable, your firm utilizes to perform requirements in the task areas. No pricing shall be submitted. Submit categories in alphabetical order in the attached format titled “EP2AE – Primary Labor Categories.” |
| 1 |
| XI |
| Company Benefits |
| Ref MRQ, 6.4 |
| None |