Q&A_III.pdf

PDF 38 KB Posted

Attached to
Industrial Wastewater Filtration
Solicitation number
F9D3CE8065AW01
Issued by

View the file

Other files

File Type Posted
Q&A_V.pdf PDF
Lagoon_Release_and_Power.pdf PDF
Q&A_IV.pdf PDF
Wage_Determination.pdf PDF
Q&A_II.pdf PDF
Test_Results_1-20-2017.pdf PDF
Q&A.pdf PDF
W912PQ-18-T-0004.pdf PDF
Aerial_View.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q. What is the anticipated carbon changeout frequency? If unknown, what was the carbon changeout frequency during the pilot test?

A. Unknown as that would be based in part on the size of the filtering system used (amount of media in the filter system).

Q. Does this project require Prevailing Wage Rates or Davis Bacon Wage Rates? If so, can you provide the wage rate schedules?

A. This project would fall under prevailing wage rates. Attached is the wage rate schedule.

Q. If a post filtering test indicated unacceptable levels of PFOA/PFOS and this resulting in additional on‐ site days (more than 36 on‐site days), would that be considered a change order to re‐filter?

A. It would not be considered a change order and not count towards the 36 days since the intent of the contract was not met and that would fall on the winner bidder.

Q. In the RFP, it states multi FRAC tanks and then a single FRAC tank. Is the bidder to assume multiple

FRAC tanks in its base bid pricing, or just a single FRAC tank? If multiple, is the bidder to assume a storage capacity large enough to continuously (24/7) contain a 50GPM flow for the duration of the project?

A. One (1) Frack tank is all the is required as a min, 18,000 gallon capacity min.