SITE VISIT MINUTES

View the file

Other files

File Type Posted
RFI_1 _2_-_Building_300_As_Built_(rev_1).pdf PDF
RFI_7.pdf PDF
RFI_1.pdf PDF
RFI_3.pdf PDF
RFI_6.pdf PDF
RFI_5.pdf PDF
RFI_2.pdf PDF
RFI_4.pdf PDF
J A_-_brand_name_(aruba_WAP's)-signed.pdf PDF
FBO_doc_-_AT-OPSEC_REQUIREMENTS.pdf PDF
FBO_doc_-_Statement_of_Work.pdf PDF
FBO_doc_-_provisions_ _clauses_attachment_(services).pdf PDF
FBO_doc_-_RFI_template.doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

179 AW/MSC 06 September 2016

SITE VISIT MINUTES

PROJECT: Wireless Access Points (WAP’s) Installation

Location: 179 AW, Mansfield Ohio Air National Guard

1. The site visit was conducted on 01 September 16 @ 1:00pm. The following were in attendance:

a. Gordon Strom, Base Contracting Officer

b. TSgt Taylor Keltz, 179AW/Comm Flight (COR)

c. Chad Baker, Clarktel

d. Alisha Laminack, Fiber Plus

e. Douglas Hyde, Fiber Plus

f. Matt Peppard, Fiber Plus

g. Shawn Miskovich, Linxus

h. Bryan Higgins, Ace Electronics

i. Ron Moore, ProCon

j. Jeff Darby, ProCon

2. All were welcomed and signed attendance sheet; hand-outs were provided (slide brief). The following was noted:

a. Contractor personnel/pre-start requirements were reiterated (access form completion/submission requirements; antiterrorism training requirements – certs to be submitted prior to start of installation).

b. Contracting Officer briefed hand-out contents; reiterated requirement to submit all questions/requests for information utilizing RFI template.

c. All RFI’s and responses shall be distributed no later than 08 Sep – sooner if possible.

d. TSgt Keltz briefed overview of project.

3. There was nothing else discussed of pertinence; all but the Contracting Officer proceeded to locations of each installation requirement.

a. TSgt Keltz informed Contracting Officer drawing of bldg. 300 will require update

(will be distributed upon receipt).

4. There was nothing else discussed of pertinence; this concluded site visit for WAP’s

Installation project.

5. Contractors are reminded to ensure all questions are submitted no later than the date and time noted in solicitation. Extension to bid closing due date/time will only occur if contractor’s effort to submit a viable proposal is impeded by the Government (i.e. through delay getting answers to RFI’s returned in a timely manner, etc.). Outside of a Government delay, all other requested extensions will be taken into consideration on a case-by-case basis.

SITE VISIT MINUTES – WAPS INSTALLATION

6. Any questions or concerns related to these minutes shall be forwarded to the undersigned.

Note: If there are any questions related to these minutes or any aspect of this project, please contact Gordon Strom at 419-520-6390 or via email gordon.m.strom.mil@mail.mil .

GORDON STROM, MSgt

Mansfield Ohio ANG

Base Contracting Officer