QUESTIONS AND ANSWERS
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
Replace The Current Internet Protocol Closed Circuit Flight Line Video System (CCFV Or Here-In-After Referred To As “System”).
We need some clarification on some items for "Attachment 1".
They are as follows:
3.1 Relay Server. Does this mean a "Server Based" or a "Embedded Network Appliance" network video recorder are acceptable?
Both are technically acceptable, but an appliance system is preferred for compactness, low energy consumption, and swapability
3.3 Burned for review. If an operator can manually burn video to a file folder, USB drive or other attached media, is that acceptable?
The files should be extractable to a portable media format. USB media storage devices are not permitted on USAF networks, so optical drives are preferred
3.4 The Contractor will troubleshoot the Central Control Station for CP at a location to be disclosed at the site walkthrough. Please explain what needs to be troubleshooted and what is CP?
The meaning of this line is the preponderance of support equipment will reside at the Command Post (CP)
3.7 The Contractor must troubleshoot the certified system that is using the existing JBA data network. Do you want the system on its own dedicated network or on the JBA network or a combination of both?
A combination of both. We would like to be able to pull up video feeds from the CCTV system on a computer attached to the NIPR network via a browser window.
3.9 System must be capable of interfacing with various access control systems, alarms and all approved alarm annunciation systems(see AF/XOS-F memorandum dated 17 Mar 06) using windows. Are input and output contact closure or TTL signals an acceptable interface and can you supply a copy or link to the AF/XOS-F for review?
the proposed method is an industry standard and technically suitable -
3.10
2. Starts with 2. Is there a 1. Or just an error?
6. Install nine (11) exterior PTZ cameras, nine (10) wall mounts. Should it read Install eleven (11) exterior PTZ cameras, ten wall mounts,?
E & F. Both state Hangar 3. Should E be Hangar 2 and F be Hangar 3?
D, E, F, G, H and I. State "network connectivity equipment". Is the JBA providing fiber optic cable connections in these areas?
Is the (I) PTZ within the warehouse in Bldg. 1900 an interior camera?
3.11 Back Up Power for Control Stations. Are you asking for a 4 hour backup power for the Control Stations or do you want all NVR, Control Stations Cameras and all associated equipment on a 4 hour uninterrupted backup power?
Are the Control Station Software to be installed in the Operation Center, CAT Room and Bldg. 1900? There was mention of (4) additional client licenses. Does this mean you want (4) additional Control Station Software's in addition to the Operation Center, CAT Room and Bldg. 1900?
Thank you