Addendum_0005_revised__Bid_sched_-_rev_8_7_17_.doc
DOC document 42 KB Posted
- Attached to
- CONSTRUCT RMAOFFICE/MULTI-PURPOSE BLDG Federal contract opportunity
- Solicitation number
- F17PS00790
About this file
Revised Bid Schedule ADDENDUM 00005 August 8, 2017
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEQ CHAPTER \h \r 1SECTION B
BIDDING SCHEDULE
ADDENDUM 0005 AUGUST 8, 2017
CONSTRUCT ADMINISTRATION AND MULTIPURPOSE BLDG(S)
(16-040)
ROCKY MOUNTAIN ARSENAL NWR
ITEM
NO. DESCRIPTION UNIT AMOUNT
I. Building(s) SEQ CHAPTER \h \r 1 Construct new 4200 sq. ft. Administration Bldg. and 1000 sq. ft. Multipurpose Bldg., single story slab on grade cast in place concrete, wood framed, HVAC, plumbing Electrical Systems, new septic system, site work (roads and parking lot) and connection to existing services (phone, elect, water).
Div. 1 General Requirements
LS
Div. 2 Existing Conditions
Div. 3 Concrete
Div. 4 Masonry
Div. 5 Metal Fabrication
Div. 6 Wood & Plastics
Div. 7 Thermal Protection
Div. 8 Doors and Windows
Div. 9 Finishes
Div. 10 Specialties
Div. 11 Equipment
Div. 12 Furnishings
Div. 22 Plumbing
Div. 23 HVAC
Div. 26 Electrical
(Excluding PV System)
Div. 27 Communications
Div. 28 Electronic Safety & Security
Div. 31 Earthwork
Div. 32 Ext. Improvements
(Excluding HQ road and Parking) Div. 33 Utilities
Div. 43 Material Handling & Equipment LS
ITEM I BASE TOTAL
ADDITIVE BID ITEM 1A SEAT WALL WEST OF BLDG
ADDITIVE BID ITEM 1B SEAT WALL EAST OF BLDG.
ADDITIVE BID ITEM 2 CONCRETE SIDEWALK TO VISITOR CENTER $________
ADDITIVE BID ITEM 3 BUILT IN CABINETS IN LOCKER ROOM $________
ADDITIVE BID ITEM 4 ELECTRIC VEHICLE CHARGING STATION $________
ITEM I BASE PLUS ADDS 1A, 1B, 2, 3 AND 4 TOTAL
II. New HQ Road and Parking Provide all material, equipment, and labor required to construct the road to new buildings and associated parking lot. .
ITEM II BASE TOTAL
ADDITIVE BID ITEM 7 VISITORS CENTER PARKING LOT REVISIONS $________
ITEM II BASE PLUS ADDITIVE 7 TOTAL
III. PV System Including Alternates (38.85 KW total) Provide all material, equipment, and labor to install a nominal 19.95 KW DC input (base bid) photovoltaic system.
Div. 26 Phototvoltaic System
ITEM III BASE TOTAL
ADDITIVE BID ITEM 5 ADDITIONAL 5.25KW, 25.2KWDC TOTAL $________
ADDITIVE BID ITEM 6 ADDITIONAL 13.65KW, 38.85KWDC TOTAL $________
ITEM III BASE PLUS ADDITIVES 5 & 6 TOTAL
IV. New Entrance Road and Signs Provide all material, equipment, and labor required to realign the entrance road and provide new signage at the entrance.
Div. 1 General Requirements
Div. 2 Existing Conditions
Div. 3 Concrete
Div. 4 Masonry
Div. 6 Wood & Plastics
Div. 10 Specialties
Div. 26 Electrical
Div. 33 Utilities
ITEM IV TOTAL
GRAND TOTAL ITEMS I THROUGH IV INCLUDING ADDITIVES $ ______
NOTE : In the event all proposals received have exceeded our budgetary amount, we will deduct the additives that are numbered the highest in the bid schedule; EG: additive bid item number 6 would be deducted first in all offers and recalculated, ; additive item 5 would be deducted second; etc. The additives therefore are listed in priority order as 1-6 .