Revised Bid Schedule ADDENDUM 00005 August 8, 2017

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEQ CHAPTER \h \r 1SECTION B

BIDDING SCHEDULE

ADDENDUM 0005 AUGUST 8, 2017

CONSTRUCT ADMINISTRATION AND MULTIPURPOSE BLDG(S)

(16-040)

ROCKY MOUNTAIN ARSENAL NWR

ITEM

NO. DESCRIPTION UNIT AMOUNT

I. Building(s) SEQ CHAPTER \h \r 1 Construct new 4200 sq. ft. Administration Bldg. and 1000 sq. ft. Multipurpose Bldg., single story slab on grade cast in place concrete, wood framed, HVAC, plumbing Electrical Systems, new septic system, site work (roads and parking lot) and connection to existing services (phone, elect, water).

Div. 1 General Requirements

LS

Div. 2 Existing Conditions

Div. 3 Concrete

Div. 4 Masonry

Div. 5 Metal Fabrication

Div. 6 Wood & Plastics

Div. 7 Thermal Protection

Div. 8 Doors and Windows

Div. 9 Finishes

Div. 10 Specialties

Div. 11 Equipment

Div. 12 Furnishings

Div. 22 Plumbing

Div. 23 HVAC

Div. 26 Electrical

(Excluding PV System)

Div. 27 Communications

Div. 28 Electronic Safety & Security

Div. 31 Earthwork

Div. 32 Ext. Improvements

(Excluding HQ road and Parking) Div. 33 Utilities

Div. 43 Material Handling & Equipment LS

ITEM I BASE TOTAL

ADDITIVE BID ITEM 1A SEAT WALL WEST OF BLDG

ADDITIVE BID ITEM 1B SEAT WALL EAST OF BLDG.

ADDITIVE BID ITEM 2 CONCRETE SIDEWALK TO VISITOR CENTER $________

ADDITIVE BID ITEM 3 BUILT IN CABINETS IN LOCKER ROOM $________

ADDITIVE BID ITEM 4 ELECTRIC VEHICLE CHARGING STATION $________

ITEM I BASE PLUS ADDS 1A, 1B, 2, 3 AND 4 TOTAL

II. New HQ Road and Parking Provide all material, equipment, and labor required to construct the road to new buildings and associated parking lot. .

ITEM II BASE TOTAL

ADDITIVE BID ITEM 7 VISITORS CENTER PARKING LOT REVISIONS $________

ITEM II BASE PLUS ADDITIVE 7 TOTAL

III. PV System Including Alternates (38.85 KW total) Provide all material, equipment, and labor to install a nominal 19.95 KW DC input (base bid) photovoltaic system.

Div. 26 Phototvoltaic System

ITEM III BASE TOTAL

ADDITIVE BID ITEM 5 ADDITIONAL 5.25KW, 25.2KWDC TOTAL $________

ADDITIVE BID ITEM 6 ADDITIONAL 13.65KW, 38.85KWDC TOTAL $________

ITEM III BASE PLUS ADDITIVES 5 & 6 TOTAL

IV. New Entrance Road and Signs Provide all material, equipment, and labor required to realign the entrance road and provide new signage at the entrance.

Div. 1 General Requirements

Div. 2 Existing Conditions

Div. 3 Concrete

Div. 4 Masonry

Div. 6 Wood & Plastics

Div. 10 Specialties

Div. 26 Electrical

Div. 33 Utilities

ITEM IV TOTAL

GRAND TOTAL ITEMS I THROUGH IV INCLUDING ADDITIVES $ ______

NOTE : In the event all proposals received have exceeded our budgetary amount, we will deduct the additives that are numbered the highest in the bid schedule; EG: additive bid item number 6 would be deducted first in all offers and recalculated, ; additive item 5 would be deducted second; etc. The additives therefore are listed in priority order as 1-6 .