SPECIFICATIONS

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administration and Multipurpose Building

Rocky Mountain Arsenal National Wildlife Refuge

Technical Specifications

April 28, 2017

Administration and Multipurpose Building

Rocky Mountain Arsenal National Wildlife Refuge

These Technical Specifications have been prepared under the direction of a licensed Professional Engineer, Architect or Landscape Architect, registered in the State of Colorado

Jordan C. Jefferies Stantec Consulting Services, Inc.

011000 SUMMARY OF WORK

013119 PROJECT MEETINGS

013200 CONSTRUCTION PROGRESS

DOCUMENTATION

013300 SUBMITTAL PROCEDURES

014500 QUALITY REQUIREMENTS

015000 TEMPORARY FACILITIES AND

CONTROLS

015010 PROTECTION OF EXISTING

FACILITIES

016010 EROSION AND SEDIMENTATION

CONTROL

017123 CONSTRUCTION SURVEYING

017419 CONSTRUCTION WASTE

MANAGEMENT AND DISPOSAL

017420 GRAVITY PIPELINE TESTING

017430 PRESSURE PIPE TESTING AND

DISINFECTION

017700 CLOSEOUT PROCEDURES

018113 SUSTAINABLE DESIGN

REQUIREMENTS AND LEED

CHECKLIST

019113 GENERAL COMMISSIONING

REQUIREMENTS

024119 DEMOLITION

042200 CONCRETE UNIT MASONRY

101453 TRAFIC SIGNAGE

221353 WASTEWATER TREATMENT

SYSTEM & ABSORPTION FIELD

311000 SITE PREPARATION

313000 EARTHWORK

313419 GEOTEXTILES

313526 EROSION CONTROL BARRIER

313700 RIPRAP

321113 ASPHALT CONCRETE PAVEMENT

AND BASE

321313 PORTLAND CEMENT PAVEMENT

AND BASE

321723 PAVEMENT MARKING

330516 PRECAST CONCRETE VAULTS

339010 REINFORCED CONCRETE PIPING

(ASTM C 76, MODIFIED

339540 SMALL POLY VINYL CHLORIDE

NON-PRESSURE PIPING, RUBBER

JOINTS (ASTM D 3034,(MODIFIED)

339550 PVC PRESSURE PIPING, RUBBER

JOINTS

433022 GATE VALVES

Clifford A. Lind

Otak, Inc.

040513 MASONRY MORTARING

042113.13 BRICK VENEER MASONRY

044313 STONE MASONRY VENEER

Douglas L. Sarkkinen Otak, Inc.

033000 CAST-IN-PLACE CONCRETE

051200 STRUCTURAL STEEL

053100 STEEL DECKING

061000 ROUGH CARPENTRY

061800 GLUE LAMINATED WOOD

BEAMS

John R. McMichael

Interface Engineering, Inc.

220000 PLUMBING BASIC

REQUIREMENTS

220519 PLUMBING DEVICES

220523 GENERAL DUTY VALVES FOR

PLUMBING PIPING

220529 HANGERS AND SUPPORTS FOR

PLUMBING PIPING AND

EQUIPMENT

220700 PLUMBING INSULATION

221000 PLUMBING PIPING

221353 SEPTIC TANK AND ABSORBTION

BED

223000 PLUMBING EQUIPMENT

224000 PLUMBING FIXTURES

230000 HEATING, VENTILATING AND

AIR CONDITIONING (HVAC)

BASIC REQUIREMENTS

230513 COMMON MOTOR

REQUIREMENTS FOR HVAC

EQUIPMENT

230519 METERS AND GAUGES FOR HVAC

PIPING

230523 GENERAL-DUTY VALVES FOR

HVAC PIPING

230529 HANGERS AND SUPPORTS FOR

HVAC PIPING, DUCTWORK AND

EQUIPMENT

230548 VIBRATION AND SEISMIC

CONTROLS FOR HVAC

EQUIPMENT

230553 IDENTIFICATION FOR HVAC

PIPING, DUCTWORK AND

EQUIPMENT

230593 TESTING, ADJUSTING AND

BALANCING FOR HVAC

230700 HVAC INSULATION

230933 ELECTRIC AND ELECTRONIC

CONTROL SYSTEM FOR HVAC

232113 HVAC PIPING

232113.33 GOUND-LOOP HEAT-PUMP

PIPING

232116 HYDRONIC PIPING SPECIALTIES

232123 HYDRONIC PUMPS

232500 HVAC WATER TREATMENT

233100 HVAC DUCTS AND CASINGS

233300 AIR DUCT ACCESSORIES

233400 HVAC FANS

233700 AIR OUTLETS AND INLETS

234000 HVAC AIR CLEANING DEVICES

237223 PACKAGED AIR-TO-AIR ENERGY

RECOVERY UNITS

238126 SMALL SPLIT SYSTEM AND

UNITARY HVAC EQUIPMENT

238200 TERMINAL HEAT TRANSFER

EQUIPMENT

EXP. 10/31/17 4/24/17

EXP. 10/31/2017 4/24/2017

TABLE OF CONTENTS TOC - 1

TABLE OF CONTENTS

DIVISION 01: GENERAL REQUIREMENTS

011000 SUMMARY OF WORK 6 PAGES

013119 PROJECT MEETINGS 2 PAGES

013200 CONSTRUCTION PROGRESS DOCUMENTATION 2 PAGES

013300 SUBMITTAL PROCEDURES 8 PAGES

014000 QUALITY REQUIREMENTS 8 PAGES

015000 TEMPORARY FACILITIES AND CONTROLS 6 PAGES

015010 PROTECTION OF EXISTING FACILITIES 4 PAGES

016010 EROSION AND SEDIMENTATION CONTROL 6 PAGES

017123 CONSTRUCTION SURVEYING 4 PAGES

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 8 PAGES

017420 GRAVITY PIPELINE TESTING 4 PAGES

017430 PRESSURE PIPE TESTING AND DISINFECTION 4 PAGES

017700 CLOSEOUT PROCEDURES 6 PAGES

018113 SUSTAINABLE DESIGN REQUIREMENTS AND LEED CHECKLIST 12 PAGES

019113 GENERAL COMMISSIONING REQUIREMENTS 4 PAGES

DIVISION 02: EXISTING CONDITIONS

024119 DEMOLITION 2 PAGES

DIVISION 03: CONCRETE

033000 CAST-IN-PLACE CONCRETE 18 PAGES

TABLE OF CONTENTS TOC - 2

DIVISION 04: MASONRY

040513 MASONRY MORTARING 6 PAGES

0440513 ADHERED STONE MASONRY VENEER SYSTEM 20 PAGES

042200 UNIT MASONRY 8 PAGES

042113.13 BRICK VENEER MASONRY 6 PAGES

044313 STONE VENEER MASONRY 4 PAGES

DIVISION 05: METALS

051200 STRUCTURAL STEEL 16 PAGES

103100 STEEL DECKING 4 PAGES

DIVISION 06: WOOD, PLASTICS, & COMPOSITES

061000 ROUGH CARPENTRY 6 PAGES

061800 GLUE LAMINATED WOOD BEAMS 8 PAGES

062000 FINISH CARPENTRY 8 PAGES

064000 MILLWORK 8 PAGES

DIVISION 07: THERMAL AND MOISTURE PROTECTION

072100 THERMAL & ACOUSTICAL INSULATION 6 PAGES

072500 WEATHER BARRIERS 8 PAGES

074113 PREFORMED ROOF PANELS 8 PAGES

074213 METAL WALL PANELS 8 PAGES

076200 SHEET METAL, FLASHING, AND TRIM 8 PAGES

078413 PENETRATION FIRESTOPPING 10 PAGES

079200 JOINT SEALANTS 6 PAGES

TABLE OF CONTENTS TOC - 3

DIVISION 8: OPENINGS

081113 STEEL DOORS 6 PAGES

081416 FLUSH WOOD DOORS 6 PAGES

083113 ACCESS DOORS AND FRAMES 6 PAGES

084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 12 PAGES

084333 FOLDING GLASS STOREFRONTS 14 PAGES

085413 FIBERGLASS WINDOWS 8 PAGES

087100 DOOR HARDWARE 6 PAGES

088000 GLASS & GLAZING 6 PAGES

088300 MIRRORS 6 PAGES

089000 LOUVERS & VENTS 6 PAGES

DIVISION 9: FINISHES

092900 GYPSUM BOARD 10 PAGES

093000 CERAMIC TILE 14 PAGES

095000 ACOUSTICAL CEILINGS 8 PAGES

096501 RESILIENT WALL BASE 8 PAGES

096813 CARPET TILES 4 PAGES

097700 FIBERGLASS REINFORCED PLASTIC PANELS (FRP) 6 PAGES

099100 PAINTING 8 PAGES

099300 CONCRETE STAINING 6 PAGES

099723 CONCRETE SEALERS 4 PAGES

TABLE OF CONTENTS TOC - 4

DIVISION 10: SPECIALITIES

101100 VISUAL DISPLAY UNITS 6 PAGES

101400 SIGNAGE 4 PAGES

101455 TRAFFIC SIGNAGE 2 PAGES

102113 TOILET COMPARTMENTS 6 PAGES

102600 WALL AND DOOR PROTECTION 4 PAGES

102800 TOILET AND BATH ACCESSORIES 4 PAGES

104416 FIRE EXTINGUISHERS 2 PAGES

105100 LOCKERS 6 PAGES

DIVISION 11: EQUIPMENT

113100 RESIDENTIAL APPLIANCES 2 PAGES

115213 LARGE VENUE PROJECTION SCREENS 6 PAGES

DIVISION 12: FURNISHINGS

122113 HORIZONTAL LOUVER BLINDS 4 PAGES

123530 RESIDENTIAL CASEWORK 6 PAGES

123661 SOLID SURFACE COUNTERTOPS 6 PAGES

124940 MANUAL & MOTORIZED SHADES 12 PAGES

DIVISION 22: PLUMBING

220000 PLUMBING BASIC REQUIREMENTS 12 PAGES

220519 PLUMBING DEVICES 4 PAGES

220523 GENERAL DUTY VALVES FOR PLUMBING PIPING 8 PAGES

220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 14 PAGES

220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 4 PAGES

220700 PLUMBING INSULATION 6 PAGES

221000 PLUMBING PIPING 14 PAGES

TABLE OF CONTENTS TOC - 5

DIVISION 22: PLUMBING (CONTINUED)

221353 WASTEWATER TREATMENT SYSTEM & ABSORPTION FIELD 8 PAGES

223000 PLUMBING EQUIPMENT 6 PAGES

224000 PLUMBING FIXTURES 6 PAGES

DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING

230000 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) BASIC

REQUIREMENTS 12 PAGES

230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 4 PAGES

230519 METERS AND GAUGES FOR HVAC PIPING 8 PAGES

230523 GENERAL-DUTY VALVES FOR HVAC PIPING 6 PAGES

230529 HANGERS AND SUPPORTS FOR HVAC PIPING, DUCTWORK

AND EQUIPMENT 14 PAGES

230548 VIBRATION AND SEISMIC CONTROLS FOR HVAC EQUIPMENT 8 PAGES

230553 IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT 6 PAGES

230593 TESTING, ADJUSTING AND BALANCING FOR HVAC 14 PAGES

230700 HVAC INSULATION 12 PAGES

230933 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC 6 PAGES

232113 HVAC PIPING 6 PAGES

232113.33 GOUND-LOOP HEAT-PUMP PIPING 10 PAGES

232116 HYDRONIC PIPING SPECIALTIES 6 PAGES

232123 HYDRONIC PUMPS 6 PAGES

232500 HVAC WATER TREATMENT 6 PAGES

233100 HVAC DUCTS AND CASINGS 8 PAGES

233300 AIR DUCT ACCESSORIES 10 PAGES

233400 HVAC FANS 4 PAGES

233700 AIR OUTLETS AND INLETS 4 PAGES

234000 HVAC AIR CLEANING DEVICES 4 PAGES

TABLE OF CONTENTS TOC - 6

DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING (CONTINUED)

237223 PACKAGED AIR-TO-AIR ENERGY RECOVERY UNITS 4 PAGES

238126 SMALL SPLIT SYSTEM AND UNITARY HVAC EQUIPMENT 4 PAGES

238200 TERMINAL HEAT TRANSFER EQUIPMENT 4 PAGES

DIVISION 26: ELECTRICAL

260000 ELECTRICAL BASIC REQUIREMENTS 12 PAGES

260509 EQUIPMENT WIRING 4 PAGES

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 4 PAGES

262526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 4 PAGES

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

AND EQUIPMENT 6 PAGES

260533 RACEWAYS 10 PAGES

260534 BOXES 6 PAGES

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 4 PAGES

260573 ELECTRICAL DISTRIBUTION SYSTEM STUDIES 6 PAGES

260920 LIGHTING RELAY CONTROL PANEL 6 PAGES

260923 OCCUPANCY AND VACANCY SENSORS 6 PAGES

260924 DAYLIGHTING CONTROLS 4 PAGES

262416 PANELBOARDS 4 PAGES

262713 ELECTRICAL METERING 4 PAGES

262726 WIRING DEVICES 4 PAGES

262800 OVERCURRENT PROTECTIVE DEVICES 4 PAGES

262816 ENCLOSED SWITCHES AND CURCUIT BREAKERS 4 PAGES

263100 PHOTOVOLTAIC SYSTEMS 10 PAGES

263600 TRANSFER SWITCHES 6 PAGES

264113 LIGHTENING PROTECTION FOR STRUCTURES 8 PAGES

264300 SURGE PROTECTIVE DEVICES 6 PAGES

TABLE OF CONTENTS TOC - 7

DIVISION 26: ELECTRICAL (CONTINUED)

265100 LIGHTING 10 PAGES

DIVISION 27: COMMUNICATIONS

270000 COMMUNICATIONS BASIC REQUIREMENTS 12 PAGES

270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS 10 PAGES

271300 COMMINICATIONS BACKBONE CABLING 6 PAGES

271500 COMMUNICATIONS HORIZONTAL CABLING 8 PAGES

DIVISION 28: ELECTRONIC SAFETY AND SECURITY

280001 ELECTRONIC SAFETY BASIC REQUIREMENTS 10 PAGES

283100 FIRE DETECTION AND ALARM 18 PAGES

DVISION 31: EARTHWORK

311000 SITE PREPARATION 2 PAGES

313000 EARTHWORK 18 PAGES

313419 GEOTEXTILES 8 PAGES

313526 EROSION CONTROL BARRIER 2 PAGES

313700 RIPRAP 6 PAGES

DIVISION 32: EXTERIOR IMPROVEMENTS

321113 ASPHALT CONCRETE PAVEMENT AND BASE 8 PAGES

321313 PORTLAND CEMENT PAVEMENT AND BASE 4 PAGES

321316 DECORATIVE CONCRETE PAVING 6 PAGES

321723 PAVEMENT MARKING 2 PAGES

TABLE OF CONTENTS TOC - 8

DIVISION 33: UTILITIES

330516 PRECAST CONCRETE VAULTS 4 PAGES

339010 REINFORCED CONCRETE PIPING (ASTM C 76, MODIFIED) 2 PAGES

339540 SMALL POLY VINYL CHLORIDE NON-PRESSURE PIPING,

RUBBER JOINTS (ASTM D 3034, MODIFIED) 4 PAGES

339550 PVC PRESSURE PIPING, RUBBER JOINTS 6 PAGES

DIVISION 43: MATERIAL HANDLING AND EQUIPMENT

433022 GATE VALVES 2 PAGES

END OF TABLE OF CONTENTS

SUMMARY OF WORK 011000 - 1

SECTION 011000 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Work under separate contracts.

4. Access to site.

5. Coordination with occupants.

6. Work restrictions.

7. Permits and Fees.

8. Applicable codes, standards, and specifications.

9. Means and methods.

10. Safety.

11. Environmental Protection.

B. Related Requirements:

1. Section 015000 - Temporary Facilities and Controls for limitations and procedures governing temporary use of the Government's facilities.

1.2 PROJECT INFORMATION

A. Project Location: Rocky Mountain Arsenal National Wildlife Refuge. Located in Adams County, Colorado, north of E 56th Ave, south of E 96th Ave, between Quebec St. on the west and Pena Blvd / Buckley Road on the east. Access to the Refuge and project site is from Prairie Parkway to the north of Dick’s Sporting Goods Park.

B. Station Contact Information: The Rocky Mountain Arsenal NWR office is located on E 72nd Ave, approximately 2 miles northeast of the Visitor Center. Arrangements to inspect the site may be made by contacting the Refuge Manager at (303) 289-0350.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The work consists of the construction of a new 4,100 square foot administration building, a 900 square foot multipurpose building, and associated site utilities and improvements. The work includes, but is not limited to earthwork; site utilities; exterior concrete flatwork; concrete foundations and floor slabs; wood, stone and metal-panel wall exterior walls; wood beam and joist roof system; doors and windows, interior framed partitions and finishes; plumbing; HVAC systems; and electrical power, communications and lighting systems.

B. Additive Bid Items: The following additive bid items are identified on the drawings and specifications:

1. Additive Bid Item #1A – Seat Wall at Plaza to the west of the buildings

2. Additive Bid Item #1B – Seat Wall at Plaza to the east of the buildings

3. Additive Bid Item #2 – Concrete Sidewalk to Visitors Center

SUMMARY OF WORK 011000 - 2

4. Additive Bid Item #3 – Built In Cabinets in the Locker Room

5. Additive Bid Item #4 – Electric Vehicle Charging Stations in Parking Lot

6. Additive Bid Item #5 – Photovoltaic System addition of 5.35 kW

7. Additive Bid Item #6 – Photovoltaic System addition of 18.9 kW

8. Additive Bid Item #7 – Visitors Center Parking Lot Revisions

1.4 ACCESS TO SITE

A. All operations of the Contractor (including storage of materials) upon Government premises shall be confined to areas authorized or approved by the Contracting Officer.

B. Limit use of Project site areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to areas shown on Drawing C-11, Erosion Control Site Plan.

2. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government Representatives, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

C. At the conclusion of construction activities, those portions of the site disturbed by construction activities shall be restored to match adjacent undisturbed vegetation.

1.5 COORDINATION WITH OCCUPANTS

A. Partial Government Occupancy: Government will occupy existing adjacent buildings and the premises during entire construction period, with the exception of areas under construction.

Cooperate with Refuge Manager during construction operations to minimize conflicts and facilitate usage. Perform the Work so as not to interfere with Government operations and Refuge traffic.

1. Provide not less than 48 hours' notice to Government of activities that will affect Government‘s operations.

1.6 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work at the construction site to normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated.

1. Work on weekends will be restricted to Contracting Officer’s approval and shall be at the Refuge Manager’s discretion.

2. No work shall take place on federally observed holidays.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

SUMMARY OF WORK 011000 - 3

1. Notify Refuge Manager not less than two working days in advance of proposed utility interruptions.

D. Nonsmoking Building: Smoking is not permitted within the new construction building shell.

1.7 PERMITS AND FEES

A. As a general rule, the Government does not require or obtain county, city or state construction permits for projects located on federal property such as the Rocky Mountain Arsenal NWR. For this project the Government has obtained a septic system construction permit from the Tri- County Health Department (TCHD). The Contractor shall comply will all conditions and requirements of the permit, including inspections by the TCHD. A copy of the permit is included in Section 221353.

B. The Contractor shall be responsible for obtaining the following local, State, and Federal permits and licenses, and payment of related fees:

1. NPDES Storm Water Discharge Permit. This project is covered under the 2017

Construction General Permit COR-10F000 issued by the USEPA. The Contractor shall prepare a Storm Water Management Plan that complies with the requirements of Section 016010 and the 2017 Construction General Permit. The Contractor shall submit a Notice of Intent using the EPA’s NPDES eReporting Tool (NeT) located at https://www.epa.gov/npdes/stormwater-dischargesconstruction-activities#ereporting.

2. Electrical Inspection. The Contractor shall obtain an electrical inspection of the service entrance and main disconnect equipment as required by Xcel Energy to provide power to the project.

C. In addition to the above permits, the Contractor shall provide the services of independent testing laboratories and services for the inspection and quality control activities identified on the drawings and listed in the specifications. These include, but are not limited to, concrete, earthwork, potable water systems disinfection, and structural steel.

1.8 GEOTECHNICAL ENGINEERING REPORT

A. A geotechnical engineering report entitled, “Geotechnical Engineering Report, Proposed Rocky Mountain Arsenal National Wildlife Refuge Administration Building” has been prepared by MWH, now part of Stantec.

B. A copy of the report is included as an appendix to these specifications.

C. If conflicts occur between the report recommendations and the drawings or specifications, the drawings and specifications govern.

1.9 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS

A. All work shall comply with the codes and standards applicable to each type of work as listed in individual Sections of these Specifications. The overall governing code for this project is the 2015 International Building Code.

B. Where a conflict occurs between a referenced document and the Project Specifications, the Project Specifications govern.

https://www.epa.gov/npdes/stormwater-dischargesconstruction-activities#ereporting

SUMMARY OF WORK 011000 - 4

C. Where a conflict occurs between referenced documents, the document containing the most stringent requirements governs.

D. Where referenced documents are not specified by date, the document current at the bid opening applies.

E. Materials, applications, and tests specified by reference to published standards of society, association, code, or other published standards are included in the specifications as if written in their entirety, for the version in effect on the date of the contract.

F. Conform to all regulations and statutes of Adams County, the State of Colorado and to all Federal Regulations which apply.

1.10 MEANS AND METHODS

A. Means and methods of construction shall be such as the Contractor or subcontractors may choose; subject, however, to the Contracting Officer's right to reject means and methods proposed which:

1. Constitute a hazard to the work, persons, or property.

2. Will not produce finished work in accordance with terms of the contract.

3. Are contrary to specified means or methods included in the contract.

B. The right to reject means and methods of the Contractor or subcontractor shall not be construed or interpreted as acceptance of control of means and methods by the Contracting Officer.

C. The Contracting Officer's approval of means and methods or failure to exercise right to reject means and methods shall not relieve the Contractor of the obligation to complete the work required by the contract.

D. Total responsibility for control of all means and methods lies with the Contractor for all work.

1.11 SAFETY

A. The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient flasher lights, flagmen, danger signals and signs, and shall take all necessary precautions for the protection of the work and the safety of the public. Roads closed to traffic shall be protected by effective barricades and shall be placed with acceptable warning signs. All barricades and obstructions shall be illuminated at night and all lights shall be kept burning from sunset until sunrise. Install appropriate traffic signs at crossroads and approaches to site as needed to direct affected public traffic.

B. The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site, including the provisions of 29 CFR 1910 and 29 CFR 1926 of the Code of Federal Regulations. The Contractor shall hold harmless the Government for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors.

C. Provide personal safety equipment and training commensurate with the hazards which may exist at the work site. The personal safety equipment and training shall be determined by a thorough

SUMMARY OF WORK 011000 - 5

hazard analysis of all work site areas. The safety program available at all work sites shall include a minimum of:

1. One nonfreezing-type fire extinguisher in the construction area and in each workshop and shed used for storage of materials at the work site. Place in location readily accessible to construction personnel.

2. A first aid kit for use of construction personnel commensurate with size of project with items necessary for first aid treatment of all injuries.

3. The Contractor shall conduct regular onsite safety inspections and all construction personnel shall receive a safety orientation.

4. Post telephone numbers of nearest hospital, ambulance service or flight for life, and fire station in conspicuous location. Advise all workers of location of telephone numbers.

1.12 ENVIRONMENTAL PROTECTION

A. The Contractor shall abate and control all environmental pollution arising from construction activities by complying with all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement, as well as the specified requirements in this contract. Compliance with this requirement by subcontractors will be the responsibility of the Contractor.

B. Fossils and Artifacts

1. Should the Contractor discover any fossils or artifacts during construction operations, such objects shall become the property of the Government. The Contractor shall cease construction operations in the area of the "find," and immediately notify the station manager of such discovery. Construction operations may proceed in other areas not affected by this clause. Care shall be exercised by the Contractor not to damage fossils or artifacts uncovered during excavation operations.

2. Failure to comply with this requirement may be considered a violation of the Archeological Resources Protection Act of 1979 as amended. Destruction of historic and prehistoric sites and/or unauthorized collection of cultural materials can result in criminal and/or civil penalties. Penalties can include fines, prison sentences, and/or confiscation of equipment.

3. If the Contractor uses fill from a nongovernmental source to perform work that is required under this project, and a new borrow site is opened or an existing borrow area is expanded in order to obtain such materials, the Contractor shall assure that any new borrow area disturbance meet the requirements of Section 106 of the National Historic Preservation Act.

C. Abatement of Air Pollution

1. The Contractor shall comply with applicable Federal, State, and local laws and regulations concerning the prevention and control of air pollution.

2. Construction activities shall be performed in such a manner that air pollution will be held to a minimum.

3. Burning of materials, trees and brush, combustible construction materials, and rubbish will not be permitted. Construction debris shall be disposed of at a location designated by the Contracting Officer or be hauled off the Station to an approved disposal site.

D. Prevention of Water Pollution

SUMMARY OF WORK 011000 - 6

1. During construction the Contractor shall comply with all applicable Federal, State, and local laws and regulations concerning the control and abatement of water pollution.

2. The Contractor's construction activities shall be performed by methods that will prevent entrance or accidental spillage of solid matter, contaminants, debris, and other objectionable pollutants and wastes into streams, flowing or dry water-courses, lakes, ponds, and underground water sources. The Contractor shall dispose of all pollutants such as petroleum products, rubbish, cement, concrete, etc., and objectionable material shall be hauled away in tanks or barrels or buried in an approved landfill.

3. Sanitary facilities, such as chemical toilets shall be located far enough from wells, live streams, or ponds to prevent pollution of the water.

4. Dewatering work for structure foundations or earthwork operations adjacent to, or encroaching on, streams or watercourses shall be conducted in a manner which prevents muddy water and eroded materials from entering the streams or water courses. This shall be accomplished by construction of intercepting ditches, bypass channels, barriers, settling ponds, or other approved means. Excavated material shall not be placed in, or adjacent to, watercourses where it can be washed away by high water or storm runoff.

E. Environmental Litigation: Time lost due to work stoppage because of failure of the Contractor to comply with these requirements may not be the subject of a claim for extension of time, for additional costs, or damages.

END OF SECTION 011000

PROJECT MEETINGS 013119 - 1

SECTION 013119 - PROJECT MEETINGS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for project progress meetings.

1.2 PRE-CONSTRUCTION CONFERENCE

A. The Contracting Officer, at their discretion, may elect to hold a pre-construction conference, either in person, or by telephone conference, for the purpose of discussing contractual and technical issues critical to the initial phases of the project. Notification of such conference shall be provided approximately at time of contract award. Agenda and major topics of discussion shall be the responsibility of the Contracting Officer.

1.3 PROGRESS MEETINGS

A. The Contractor shall schedule and administer periodic progress meetings throughout progress of the work, at maximum two-week intervals, and shall perform the following in connection with each meeting:

1. Prepare agenda for meetings.

2. Distribute notice of each meeting a minimum of four days in advance of meeting date.

3. Make physical arrangements for meetings.

4. Preside at meetings.

5. Record significant proceedings and decisions.

6. Provide a description of planned work accomplishments between the current progress meeting and the next meeting.

B. Attendance

1. Contractor

2. Contracting Officer and/or Contracting Officer’s Representative (by telephone)

3. FWS On-site Construction Inspector

4. Subcontractors as appropriate to the agenda. *

5. Suppliers as appropriate to the agenda. *

6. Others as appropriate to the agenda. *

7. Representatives of Subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents

* Appropriate to the Agenda: Entities concerned with current progress or involved in planning, coordination or performance of future activities shall be represented at these meetings by persons familiar with the project and authorized to conclude matters relating to progress.

PROJECT MEETINGS 013119 - 2

C. Suggested Agenda:

1. Contractor’s Construction Schedule: Review progress since the last meeting. Determine where each activity is in relation to the Contractor’s Construction Schedule, whether on time or ahead or behind schedule. Determine how construction tasks that are behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

2. Review the present and future needs of each entity present including, but not limited to such items as:

a. Project progress and schedule

b. Sequences of work

c. Interface requirements between trades

d. Submittals

e. LEED and Sustainable design requirements.

f. Off-site fabrication problems

g. Deliveries

h. Site utilization and access to work area

i. Temporary facilities and services

j. Utility outages

k. Hazards and risks

l. Quality and work standards

m. Housekeeping

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 013119

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 1

SECTION 013200 – CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Contractor's construction schedule.

2. Construction schedule updating reports.

3. Daily construction reports.

4. Site condition reports.

1.2 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

1.3 INFORMATIONAL SUBMITTALS

A. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.

B. Construction Schedule Updating Reports: Submit with Applications for Payment.

1.4 COORDINATION

A. Coordinate Contractor's construction schedule with the schedule of values, submittal schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from entities involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

PART 2 - PRODUCTS

2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established from the Notice to Proceed to the date of completion.

B. Activities: Treat each story or separate area as a separate numbered activity for each main element of the Work. Comply with the following:

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 2

1. Activity Duration

2. Procurement Activities

3. Submittal Review Time

4. Punch List and Final Completion: Include not more than 15 days for completion of punch list items and final completion.

C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule by phase.

2. Work Restrictions: Show the effect of the following items on the schedule:

a. Coordination with existing construction.

b. Limitations of continued occupancies.

c. Uninterruptible services.

d. Partial occupancy before Substantial Completion.

e. Use of premises restrictions.

f. Provisions for future construction.

g. Seasonal variations.

h. Environmental control.

3. Work Stages: Indicate important stages of construction for each major portion of the Work.

4. Other Constraints

a. Visitors center parking lot revisions. If this additive bid item is awarded, complete the demolition and enlargement of the parking lot including the realignment of Administration Road between Station 6+00 and its connection to the existing pavement within a 90 day period to minimize the disruption to the refuge staff.

PART 3 - EXECUTION

3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Contractor's Construction Schedule Updating: At bi-weekly intervals, update schedule to reflect actual construction progress and activities. Issue schedule before the regularly scheduled progress meeting.

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses, indicate final completion percentage for each activity.

END OF SECTION 013200

SUBMITTAL PROCEDURES 013300 - 1

SECTION 013300 – SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Contracting Officer’s responsive action.

B. Informational Submittals: Written and graphic information and physical samples that do not require Contracting Officer responsive action. Submittals may be rejected for not complying with requirements.

1.3 ACTION SUBMITTALS

A. Submittal Schedule: Submit a schedule of submittals required by each of the Sections of the Specifications, arranged in sequential order by Section number. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing submittal dates. Allow additional time required for making corrections or revisions to submittals noted by Contracting Officer and additional time for handling and reviewing submittals required by those corrections.

1.4 SUBMITTAL ADMINISTRATIVE REQUIREMENTS

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Contracting Officer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.

Time for review shall commence on Contracting Officer’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 10 working days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Contracting Officer will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

SUBMITTAL PROCEDURES 013300 - 2

3. Resubmittal Review: Allow 10 working days for review of each resubmittal.

C. Paper Submittals: Place a permanent label or title block on each submittal item for identification.

1. Transmittal for Paper Submittals: Assemble each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form.

a. Transmittal Form for Paper Submittals: Use FWS transmittal form.

D. Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows:

1. Name file with submittal number or other unique identifier, including revision identifier.

a. File name shall use station initials and Specification Section number followed by a sequential submittal number (e.g. RMANWR-061000-005). Resubmittals shall include an alphabetic suffix after (e.g., RMANWR-061000-005.A).

2. Transmittal Form for Electronic Submittals: Use electronic form provided by Contracting Officer.

E. Options: Identify options requiring selection by Contracting Officer. Clearly mark options selected by the Contractor from the options on the manufacturer’s product data sheet.

F. Deviations: Identify deviations from the Contract Documents on submittals.

G. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

3. Resubmit submittals until they are marked with approval notation from Contracting

Officer’s action stamp.

H. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

I. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Contracting Officer’s action stamp.

PART 2 - PRODUCTS

2.1 SUBMITTAL PROCEDURES

A. General Submittal Procedure Requirements:

1. Electronic submittals shall be submitted via email as PDF electronic files. Files and attachments must be legible at full size; do not submit written or graphic information at a scale smaller than the original document.

a. COR through the CO will return annotated file by e-mail and/or standard mail.

Annotate and retain one copy of file as an electronic Project record document file.

SUBMITTAL PROCEDURES 013300 - 3

2. Action Submittals: Submit four (4) paper copies of each submittal unless otherwise indicated. COR through the CO will return two (2) copies.

3. Informational Submittals: Submit three (3) paper copies of each submittal unless otherwise indicated. Contracting Officer will not return copies.

4. Certificates and Certifications Submittals: Provide a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

a. Provide a digital signature with digital certificate on electronically-submitted certificates and certifications where indicated.

b. Provide a notarized statement on original paper copy certificates and certifications where indicated.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

c. Standard color charts.

d. Statement of compliance with specified referenced standards.

e. Testing by recognized testing agency.

f. Application of testing agency labels and seals.

g. Notation of coordination requirements.

h. Availability and delivery time information.

4. For equipment, include the following in addition to the above, as applicable:

a. Wiring diagrams showing factory-installed wiring.

b. Printed performance curves.

c. Operational range diagrams.

d. Clearances required to other construction, if not indicated on accompanying Shop

Drawings.

5. Submit Product Data before or concurrent with Samples.

6. Submit Product Data in either of the following formats:

a. PDF electronic file.

b. Four (4) paper copies of Product Data unless otherwise indicated. COR through the

CO will return two (2) copies.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data unless submittal based on drawing files is otherwise permitted.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

SUBMITTAL PROCEDURES 013300 - 4

a. Identification of products.

b. Schedules.

c. Compliance with specified standards.

d. Notation of coordination requirements.

e. Notation of dimensions established by field measurement.

f. Relationship and attachment to adjoining construction clearly indicated.

g. Seal and signature of professional engineer if specified.

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches (215 by 280 mm), but no larger than 24 by 36 inches.

3. Submit Shop Drawings in either of the following formats:

a. PDF electronic file, for sheets up to 17” x 11”.

b. Four (4) opaque copies of each submittal. COR through the CO will retain two (2) copies; remainder will be returned.

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package. Sample and color selection submittals may not be submitted electronically.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample.

b. Product name and name of manufacturer.

c. Sample source.

d. Number and title of applicable Specification Section.

3. For projects where electronic submittals are required, provide corresponding electronic submittal of Sample transmittal, digital image file illustrating Sample characteristics, and identification information for record.

4. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

a. Samples that may be incorporated into the Work are indicated in individual Specification Sections. Such Samples must be in an undamaged condition at time of use.

b. Samples not incorporated into the Work, or otherwise designated as Government property, are the property of Contractor.

5. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the manufacturers standard of colors, textures, and patterns available.

a. Number of Samples: Submit one (1) full set of available choices where color, pattern, texture, or similar characteristics are required to be selected from

SUBMITTAL PROCEDURES 013300 - 5

manufacturer's product line. COR through the CO will return submittal with options selected.

6. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit two (2) sets of Samples. Contracting Officer will retain one (1) Sample set; remainder will be returned. Mark up and retain one returned sample set as a project record sample.

E. Closeout Submittals and Maintenance Material Submittals: Comply with requirements specified in Section 017700 Closeout Procedures.

F. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification and Procedure Qualification Record on AWS forms. Include names of firms and personnel certified.

G. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

H. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

I. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

J. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

K. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

L. Product Test Reports: Submit written reports indicating that current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

M. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project.

SUBMITTAL PROCEDURES 013300 - 6

N. Schedule of Tests and Inspections: Comply with requirements specified in Section 014000 "Quality Control" and complying with requirements in the Construction Documents.

O. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.

P. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

Q. Field Test Reports: Submit written reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.

R. Design Data: Prepare and submit written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations.

Include list of assumptions and other performance and design criteria and a summary of loads.

Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers.

2.2 DELEGATED-DESIGN SERVICES

A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.

1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to CO.

B. Delegated-Design Services Certification: In addition to Shop Drawings, Product Data, and other required submittals, submit three (3) paper copies of certificate, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional.

1. Indicate that products and systems comply with performance and design criteria in the Contract Documents. Include list of codes, loads, and other factors used in performing these services.

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW

A. Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

B. Project Closeout and Maintenance Material Submittals: See requirements in Section 017700 Closeout Procedures.

SUBMITTAL PROCEDURES 013300 - 7

C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

3.2 CO and COR ACTION

A. General: COR will not review submittals that do not bear Contractor's approval stamp and will return them without action.

B. Action Submittals: COR will review each submittal, make marks to indicate corrections or revisions required, and return it. COR will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action as follows:

1. Approved as submitted.

2. Approved, except as noted. Resubmission not required.

3. Approved, except as noted. Resubmission required.

4. No action taken. See comments on reverse. Resubmission required.

5. Disapproved.

6. Other: (comments as noted)

C. Informational Submittals: COR will review each submittal and will not return it, or will return it if it does not comply with requirements. CO will forward each submittal to appropriate party.

D. Incomplete submittals and non-legible submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.

E. Submittals not required by the Contract Documents may not be reviewed and may be discarded.

END OF SECTION 013300

SUBMITTAL PROCEDURES 013300 - 8

This page is intentionally blank

QUALITY REQUIREMENTS 014000 - 1

SECTION 014000 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.

2. Requirements for Contractor to provide quality-assurance and quality-control services required by Contracting Officer are not limited by provisions of this Section.

3. Specific test and inspection requirements are not specified in this Section.

1.2 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution…