Exhibit S, Information Technology Infrastructure Library (ITIL) Severity Levels.pdf

PDF 170 KB Posted

Attached to
Enrollment Broker
Solicitation number
HHS0016867
Issued by
Travis County, Austin City, Texas

About this file

This document is Exhibit S to RFP No. HHS0016867 issued by the Health and Human Services Commission (HHSC) and establishes the Information Technology Infrastructure Library (ITIL) Severity Levels framework for service management and incident resolution. The exhibit defines how HHSC evaluates and categorizes incidents and problems based on business impact and urgency to determine appropriate resolution timelines and response protocols. The document provides qualitative definitions for four severity levels, ranging from Severity Level 1 (critical incidents requiring immediate response) through Severity Level 4 (issues with available workarounds requiring extended resolution time). Key Performance Measures for resolution vary based on the assigned severity level, and the framework addresses how impact and urgency are assessed considering effects on business operations, number of affected personnel, affected business functions, and regulatory delivery requirements.

Severity Level 1 encompasses life-safety events, critical security impacts, substantially unavailable mission-critical systems, outages affecting groups performing critical functions, and incidents that negatively impact regulatory compliance, jeopardize information privacy, or risk financial penalties to HHSC. Severity Level 2 events materially affect HHSC operations with partial system unavailability or missed output commitments not subject to regulatory mandates. Severity Level 3 events do not materially impact HHSC but could escalate if unresolved, typically involving individual or group access issues that do not prevent work. Severity Level 4 events require extended resolution but have acceptable workarounds available and do not impact business operations. Levels 2, 3, and 4 do not require immediate response but require changes through the Change Management Process, whereas Level 1 events require immediate response and change implementation.

View the file

Other files

File Type Posted
Exhibit D, Data Use Agreement (DUA), Version 8.5.pdf PDF
PL-10_HHS Brand Guide.docx DOCX document
PL-02_Enrollment Volume.xlsx XLSX spreadsheet
PL-16_FREW Case Management Informing Document.pdf PDF
Exhibit C, Health and Human Services (HHS) Additional Provisions Version 1.0.pdf PDF
Exhibit R, DCS RFO Language (POL-604-10).pdf PDF
Exhibit O, Subcontracting Plan Requirements.pdf PDF
Exhibit K, Consensus Scoring Rubric.pdf PDF
PL-13_Enterprise Change Mangement Policy v 1.3.docx DOCX document
Exhibit X, Procurement Library.pdf PDF
Exhibit J, Enrollment Broker Statement of Work.pdf PDF
Exhibit M, Deliverables.pdf PDF
PL-01_Activity Volumes Report.xlsx XLSX spreadsheet
PL-05_MDCP Release Volumes.xlsx XLSX spreadsheet
Exhibit L, Cost Proposal.xlsx XLSX spreadsheet
Exhibit Q, HHS Information Security and Privacy Requirements.pdf PDF
Exhibit W, Official Correspondence Process.pdf PDF
PL-11_HHS Information Security Controls.pdf PDF
PL-07_EB Trading Partners.docx DOCX document
PL-08_HHS Circular C-027 Fraud, Waste, and Abuse.pdf PDF
PL-14_FREW 2025 HHSC Vendor Retention Memo.pdf PDF
Exhibit N, Key Performance Measures.pdf PDF
PL-03_Enrollment Broker Data.docx DOCX document
Exhibit U, DIR Instructions to Vendors on US Section 508 VPAT Completion.pdf PDF
Exhibit D-1, Texas HHS System – Data Use Agreement - Attachment 2 to the DUA, Security and Privacy Inquiry (SPI), Version 2.1.pdf PDF
Exhibit B, Health and Human Services (HHS) Uniform Terms and Conditions – Vendor, Version 3.4.pdf PDF
Exhibit I, Federal Funding Accounting and Transparency Act (FFATA) Certification Form.pdf PDF
PL-04_HCBS Release Volumes.xlsx XLSX spreadsheet
PL-15_FREW 6_24 - 5_25 Annual Monitoring Report.pdf PDF
PL-12_HHS System Change Management Process.docx DOCX document
Exhibit A, HHS Solicitation Affirmations, Version 2.10.pdf PDF
Exhibit P, Insurance Requirements.pdf PDF
ESBD_524990_1783544400560_RFP HHS0016867 Enrollment Broker.pdf PDF
Exhibit E, Federal Assurances Non-Construction V. 1.1.pdf PDF
Exhibit V, HHS Online Bid Room Information.pdf PDF
Exhibit G, Exceptions Form.docx DOCX document
Exhibit F, Certification Regarding Lobbying.pdf PDF
Exhibit T, HHSC Disclosure Statement-Enrollment Broker.pdf PDF
PL-06_TX_Manged Care_Service Map 01-25.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. HHS0016867 Exhibit S

Exhibit S, Information Technology Infrastructure Library (ITIL) Severity Levels

1. Severity Levels HHSC uses the Information Technology Infrastructure Library (ITIL) framework for service management. Each incident and problem is evaluated based on business Impact and Urgency to determine resolution or workaround. A severity level is assigned from this assessment. This section provides qualitative definitions for the Severity Levels associated with Services.

“Impact” is defined under ITIL as a measure of the business criticality of an incident, problem or request for change, often equal to the extent of a distortion of agreed or expected Key Performance Measures. Impact is assessed by considering the effect on HHSC’s business operations, including the number and roles of people affected, the business functions supported by the affected systems, and any mandates for delivering outputs within a specified timeframe.

“Incident” is defined under ITIL as an unplanned interruption of service or degradation in the quality of service, or a configuration failure that has not yet impacted service but has the potential to cause a service interruption.

“Urgency” is defined under ITIL as a measure of the business criticality of an incident or problem based on the Impact and on the business needs of the Customer. Urgency is determined by how quickly HHSC's business will be affected by a service loss. A high-impact incident may not require immediate action. For instance, a system with high impact on end-of-month processing may have low urgency if the issue occurs early in the cycle, but high urgency if it occurs near the end. Systems supporting real-time transactions for HHSC may always be considered high Urgency, even with moderate Impact.

Key Performance Measures for resolving an incident or problem may vary based on the assigned severity level.

1.1 Severity Level 1

1. A Severity Level 1 event significantly impacts the operation of an application or service and cannot be circumvented because no workaround is available. This includes errors or outages that disrupt service, affect compliance with regulatory timeframes, jeopardize information privacy, or may result in penalties, fines, or other financial impacts on

HHSC.

2. A Severity Level 1 event is further defined as:

a. A life-safety event or issue;

b. A critical impact on the security of data and information systems;

c. A business or mission-critical system, service, application, equipment, or network component that is substantially unavailable or seriously disrupts normal business operations;

d. An error or outage that affects groups of people or a single individual performing a business or mission-critical function;

RFP No. HHS0016867 Exhibit S

e. An error or outage which:

i. Negatively impacts compliance with regulatory-mandated mailing timeframes, or

ii. Jeopardizes the privacy of information, or

iii. Could lead to the imposition of penalties, fines, or other financial impacts on

HHSC.

3. An event that, due to its immediate effect on critical business functions, requires an immediate response and change.

1.2 Severity Level 2

1. A Severity Level 2 event can materially affect HHSC and cause a substantial impact, including missed output commitments not governed by regulatory mandates.

2. A Severity Level 2 event is defined as:

a. A department or group can use a business-critical system, service, application, equipment, or network component, but some functions are unavailable or not working properly, or

b. An error or outage affects a group or groups of people, or a single individual performing a critical business function.

3. A Severity Level 2 event does not require an immediate response, but a change must be made through the Change Management Process.

1.3 Severity Level 3

1. A Severity Level 3 event does not materially affect HHSC or cause a substantial impact, but could do so if not resolved quickly.

2. A Severity Level 3 event is defined as:

a. A group or individual experiences an issue accessing or using a system, service, application, network component, or key feature, but it does not prevent work.

3. The event does not require an immediate response, but a change must be made through the Change Management Process.

1.4 Severity Level 4

1. A Severity Level 4 event may require extended resolution time, but a reasonable workaround is available for the affected individual or group.

2. The event does not impact HHSC business operations because:

a. Of the nature or extent of the fault, and

b. An acceptable workaround is already in place.

3. The event does not require immediate resolution, but a change must be made through the Change Management Process.