Exhibit D is an informational document provided by the City of Sarasota, Florida for a continuing services contract to establish a pool of qualified professional engineers for the Regional Advanced Traffic Management System (ATMS). The document outlines 50 eligible position titles with corresponding qualifications and hourly rates, ranging from entry-level positions such as Engineering Intern and Survey Technician 1 to senior positions including Senior Engineer 2, Chief Engineer 2, and Landscape Architect. The services solicitation encompasses six distinct project phases: Pre-Design Services (including data collection, site analysis, and permitting applications); Preliminary Design/Development (estimated at 30% completion with conceptual design and cost estimates); Intermediate Design (60-90% completion with refinement of schematics and preparation of plans and specifications); Final Design (100% completion with permit applications and final construction plans); Bidding and Negotiations (including preparation of bid documents and bid tabulation); and Construction (including post bid/pre-construction conferences, construction inspection on full-time, part-time, or occasional bases, quality control testing, and record drawing preparation). The contract will be awarded on a multiple-award basis to establish a library of qualified firms, with an initial term of one year and two optional one-year renewal periods for a potential three-year duration. Proposals are limited to 150 single-sided pages in PDF format and are due by March 24, 2026, at 2:30 p.m.
The document includes a comprehensive Consultant Checklist detailing bid document requirements, including detailed scopes of work, liquidated damages calculations (ranging from $960 to $9,198 plus $0.00005 per day depending on estimated project cost), completion day timelines, insurance requirements (minimum General Liability, Auto, and Workers Compensation), bond requirements, technical specifications with table of contents and page numbering, and post-bid requirements such as bid tabulation analysis and pre-construction meeting attendance. Specific pricing for individual task orders is not disclosed in the Exhibit; however, construction costs are restricted to projects not exceeding $7,500,000 and planning/study activities are capped at $500,000, with annual adjustments by the Bureau of Labor Statistics Consumer Price Index beginning July 1, 2025. The project is federally funded through the Federal Emergency Management Agency (FEMA), requiring compliance with Davis-Bacon prevailing wage provisions, equal employment opportunity standards, debarment certifications, and anti-lobbying requirements. Professional liability insurance of no less than one million dollars is mandated, and consultants must perform at least 51 percent of total contract work with their own organization unless waived by the Purchasing General Manager.
View the file
Other files for this state and local contract opportunity
Show all 50
Advanced Traffic Management System Design Continuing Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit D Titles and Position (informational purposes only)
A-E Titles and Position Descriptions
Titles Position Descriptions Hourly Rate 1 Architect Registered w/ 1+ years post registration experience.
2 Architect Intern Non-licensed with 4 year degree in Architecture.
3 Project Architect Registered w/ 5+ years of post registration experience.
4 Senior Architect Registered w/ 10+ years of post-registration experience.
5 Chief Engineer 1 PE w/ 15+ years of post registration experience.
6 Chief Engineer 2 PE w/ 25+ years of post registration experience.
7 Community Outreach Specialist H.S. graduate or equivalent, and 3-10 years of public information experience.
8 Community Outreach Specialist -
Junior H.S. graduate or equivalent, with up to 3 years of public information experience.
9 Community Outreach Specialist - Senior
H.S. graduate or equivalent, and 10+ years of public information experience.
10 Engineer 1 PE w/ 0 years of post registration experience.
11 Engineer 2 PE w/ 5+ years of post registration experience.
12 Engineering Intern Entry level w/ engineering degree; EI License required.
13 Engineering Technician Entry level, with 0-4 years of experience.
14 Geotech Engineer P.E. with 4 yrs exp. as Geotechnical Engineer.
15 Geotechnical Technician CTQP only.
16 Project Manager 1 PE w/ 5+ years of post registration experience.
17 Senior Engineer 1 PE w/ 10+ years of post registration experience.
18 Senior Engineer 2 PE w/ 20+ years of post registration experience.
19 CADD/Computer Technician Design and Drafting Associates degree with 1+ year of experience.
20 CEI Assist Contract Support Spec HS diploma or equiv. plus 2 years of secretarial and/or clerical exp. and experience with word processing and data management software.
21 CEI Contract Support Specialist HS diploma or equiv. plus 4 years of CEI exp. or a Engineering, Engineering
Technology, or Construction Management degree.
22 CEI Assist Proj Admin/Project
Engineer CEI Assist Project Engineer - P.E. with 1 yr of engineering exp. in relevant transportation projects.
CEI Assist Proj Administrator – Engineering, Engineering Technology, or Construction Management degreed with 1 yr engineering exp. in relevant transportation projects, or for personnel without Engineering, Engineering Technology, or Construction Management degrees, HS diploma or equiv. and 6 years of responsible and related engineering exp.
23 CEI Project Admin/CEI Project Engineer
CEI Project Engineer - P.E. with 2 years of engineering experience in relevant transportation projects.
CEI Project Administrator - Engineering, Engineering Technology, or Construction Management degreed requires 2 years of engineering experience in relevant transportation projects or for personnel without Engineering, Engineering Technology or Construction Management degrees, HS diploma or equiv. and 8 yrs of CEI or roadway or bridge construction exp.
24 CEI Senior Project Engineer P.E. w/ 6 years of engineering experience.
25 CEI Inspector's Aide HS diploma or equivalent.
26 CEI Scheduler HS diploma or equivalent plus 4 yrs experience of schedule development and review for road and bridge construction using Primavera.
27 Designer 10+ years of design experience, non-registered (design related to engineering).
28 Electrical Engineer EE degree w/ 2+ years of post-graduate experience.
29 Environmental Specialist B.S. degree in physical or natural sciences or engineering w/ 2+ year's exp.
30 GIS Specialist Degree in related field; or combination of education and experience.
31 Inspector H.S. graduate or equivalent +2 years experience in inspection.
32 Landscape Architect Registered.
33 Landscape Designer/Landscape
Planner Non-registered with 3+ years of experience.
34 Planner Degree in planning or equivalent w/ 1+ years of experience.
35 Program Controls Analyst Responsible for monitoring program budget and cost; 1-3 years of fi i l i fi i l d36 Secretary/Clerical Entry level w/ HS degree or equivalent.
37 Senior Designer 15+ years of design experience, non-registered (design related to engineering).
38 Senior Electrical Engineer EE degree w/ 10+ years of post-graduate experience.
Do N ot Provide
Rates W ith Subm ission
A-E Titles and Position Descriptions
Titles Position Descriptions Hourly Rate 39 Senior Inspector HS degree + 4 years of experience.
40 Senior Planner Degree in planning or equivalent w/ 10+ years of experience.
41 Field Crew Supervisor 1 MOT Certification with 1+ years supervisory experience.
42 Field Crew Supervisor 2 PSM and MOT Certification, with 1+ years supervisory experience.
43 Instrument Operator HS Graduate or Equivalent with minimum 2+ years of instrument operator survey experience.
44 Rod Person HS Graduate or Equivalent with no minimum years experience in Survey.
45 Survey Technician 1 HS Graduate or Equivalent with entry level experience in Utility or Survey.
46 Survey Technician 2 HS Graduate or Equivalent with 2+ years SUE experience.
47 Survey Technician 3 HS Graduate or Equivalent with 4+ years SUE experience.
48 Survey Crew Chief HS Graduate or Equivalent with minimum 2+ years survey crew chief experience.
49 Surveyor PSM with 1+ year transportation experience.
50 Technician Aid Entry level Design and Drafting.
Proposed Title Proposed Description
Appendix B
Task Listing
Check Required Task Phase/Task 1 Pre-Design Services Phase
1A Data Collection and programming for the project.
1A1 Project coordination meetings with local agencies and owner representatives.
1A2 Review and Present to Stakeholders.
1A3 Preform neighborhood and community charettes as 1A4 Prepare a scope design concept or preliminary design 1B Site Analysis Services
1B1 Collecting site data - boundry surveying 1B2 Collecting site data - topographical surveying 1B3 Site studies - environmental 1B4 Site studies - Traffic 1C Preparation of site plans.
1D Meeting with public utilities 1E Permitting applications (approvals and presentations)
1F All other services as identified by the City Project Manager. See added sheet for additional services under
2 Preliminary Design/Development (Estimated 30%) Phase
2A Research the project and make recommendations to the City throughout this phase. City will provide the Project description.
2A1 Prepare a conceptual design and cost estimate.
2A2 Attend all public hearings and public meetings related to the project.
2A3 Conduct necessary field reviews.
2A4
Confer with the sponsor on project require-ments, programming, finances, schedules, early phases of the project, and other pertinent matters; meet with the concerned agencies and parties on matters affecting the project.
2A5 Collect data and undertake field investigations; geological engineering and surveys; and architectural, engineering, land surveys, and environmental stud-ies.
2A6
Plan, procure, and/or prepare necessary surveys, geological engineering investigations, field investigations, and architectural and engineering studies required for preliminary design considerations.
2A7
Develop design schematics, studies, sketches, and exhibits, lists of environmental and aesthetic considerations, project recommendations, preliminary layouts, and updated cost estimates.
2A8
Assist the City in the preparation of all neces-sary and required documents for State and federal grants, includ-ing Disadvantaged Business Enterprise (DBE) plan and goals, and exhibits.
2A9 Develop source documentation related to the design of the project.
2A10 Submit final preliminary phase documents and recommendations to City for review and approval prior to finalization by the Consultants.
2A11 Meet with Purchasing Division to review consultant checklist and requirements.
2A12 All other services as identified by the City Project Manager. See added sheet for additional services under
3 Intermediate Design (60-90%) Phase
3A
Refinement of schematics design with staff and advisory personnel. Scaled floor plans and elevations of the interior space utilizations by occupants, selections of building system. Discussion of cost effective and functional methods to promote the use of green materials through innovative architectural processes. Strive to meet LEED standards and Energy Star optimum rating standards whenever cost effective.
3B Schedule and attend meetings and design conferences to obtain informa-tion and to coordinate or resolve design matters.
3C Prepare necessary reports and recommendations.
3D Ensure red, green, and brown colored marked up plans and utility relocation schedules to all agencies are prepared and submitted as required.
3E
Prepare plans, specifications, and cost estimates as appropriate for 60% and 90% level of completion.
Conduct a detailed value engineering analysis, if applicable and if requested. Print, bind as necessary, and provide all necessary copies of engineering drawings and contract specifications.
3F All other services as identified by the City Project Manager. See added sheet for additional services under
4 Final Design (100%) Phase
4A Ensure red, green, and brown colored marked up plans and utility relocation schedules to all agencies are prepared and submitted as required.
4B Submit Permit Applications to and respond to all subsequent Requests for Additional Information from State, Federal, and Local reviewing agencies, as
4C Conduct necessary field reviews.
4D Attend public hearings and public meetings related to the project.
4E Provide all necessary land surveys and legal descriptions for right-of-way and easement acquisitions.
4F Prepare final construction plans, specifications and bid form and submit to City Staff for review and approval prior to finalization.
4G Preparation of final working drawings and specifications.
4H All other approvals as necessary to complete the project
4I All other services as identified by the City Project Manager. See added sheet for additional services under
5 Bidding and negotiations Phase
5A Provide the City specified number of plan sets, specifications, and the scope of work for this phase.
5B Assist the Purchasing Division with the preparation of all bid documents as requested.
5C Ensure that all bid document meet the Consultant Checklist provided by the Purchasing Division. Copy of the current Consultant Checklist is in Appendix A.
5D Be present at all pre-bid meetings.
5E Provides answers to question from the pre-bid meeting and addenda as requested
5F Be present at the bid opening at the discretion of the City.
5G Analyze bid results and provide a calculated and verified bid tab in a formatted as specified by the City.
5H Verify references and contactors qualification for the selected project.
5I Furnish recommendations on the award in writing.
5J Provide assistance to the City with negotiations, as
5K Prepare a complete set of conformed plans and specifications to include all changes made through
5L All other services as identified by the City Project Manager. See added sheet for additional services under
6 Constructions Phase
6A
Conduct a post bid/pre-construction conference and provide meeting minutes to the City for its review and approval prior to distribution unless otherwise directed by the City. The City may chose to record the minutes.
6B Review and forward for City approval all submittals for the project.
6C Provide construction staking of the project by a Florida licensed Land Surveyor.
6D
Provide construction inspection of the project by a fully qualified individual with experience in the specialty as required by the City and as approved by the City on one of the following basis:
6D1
A full time basis by at least one (1) individual. Full time shall be described such that the inspector will be present on the site between 87% and 100% of the time that the contractor is productively working.
6D2
A part time basis by at least one (1) individual. Part time shall be described such that the inspector will be present on the site between 14% and 86% of the time that the contractor is productively working.
6D3
An occasional basis by at least one (1) individual.
Occasional shall be described such that the inspector will be present on the site between 3% and 13% of the time that the contractor is productively working.
6E Provide quality control (testing) services utilizing a qualified testing laboratory located in the State of Florida as approved by the City.
6F
Conduct regularly scheduled project status meetings on a schedule determined by the City and provide meeting minutes to the City for its review and approval prior to distribution.
6G Review and recommend approval to the City, the contractor’s quantities and pay requests.
6G1
Furnish record drawings with no disclaimers, unless authorized by the City, based on the contractor’s redlined construction plans and surveys conducted by a Florida licensed Land Surveyor. Such record drawings shall be provided in both hard copy and electronic media acceptable to the City.
6H Construction Observation
6H1
Consultant shall observe the construction and ascertain to the best of the consultant’s ability that the project is constructed in accordance with approved plans and specifications.
6I All other services as identified by the City Project Manager. See added sheet for additional services under
Appendix C
Consultant Checklist
CONSULTANT CHECKLIST - BID DOCUMENT REQUIREMENTS LIST
1. Detailed Scope of Work
a. This should be a description of the project and what you are trying to accomplish.
b. Include contractor/vendor qualification.
c. You may use any numbering sequence, but you must use a sequence.
i. Numbering of paragraphs allows the bidder to refer to the section by section number, paragraph etc…
2. Liquidated Damages
a. Include the following clause:
i. The Contractor shall pay to the City the sum of written amount in Dollars ($NNN.NN) per calendar day liquidated damages for each and every day’s delay over and above the number of calendar days prescribed for completing the work.
b. Determine the liquidated damages by using the chart below:
i. The chart below is based on Federal Standard and Florida Department of Transportation.
ii. The chart is only a recommendation. The more critical the project the more severe the liquidated damages should be.
Estimated Project Cost Over
Estimated Project Cost But Less than
Daily Charge Per Calendar Day
$0.00 $50,000.00 $960.00 $50,000.00 $250,000.00 $965.00 $250,000.00 $500,000.00 $1245.00 $500,000.00 $2,500,000.00 $1665.00 $2,500,000.00 $5,000,000.00 $2715.00 $5,000,000.00 $10,000,000.00 $3450.00 $10,000,000.00 $15,000,000.00 $4870.00 $15,000,000.00 $20,000,000.00 $5820.00 $20,000,000.00 over $9198.00 plus .00005
3. Completion Days
a. Include the number of calendar days for delivery or completion of the project or product.
i. Include start day.
1. From Notice to Proceed or
2. Issuing of purchase order
b. This needs to include any mobilization or parts lead time.
i. Possible breakdown of days
ii. If the lead time for equipment and materials cannot be determined then the following information should be added:
“The number of days to complete this project will be (number of days here) days for substantial completion. Final completion will be (number of days here) days for a total project time of (number of days here). Additional lead time may be added for equipment and materials as approved by the City. The contractor/vendor will be required to provide documentation from the supplier of the lead time requirements.”
4. Length of Contract and renewal (May not apply if using section 3)
a. Under Florida State Statute
i. Renewal of contracts for commodities or contractual service may be renewed for a period not to exceed 3 years or the term of the original contract, whichever is longer (Example, two (2) initial years with two (2) one (1) year renewals.
ii. Renewal must be for the same terms and conditions as the initial contract unless escalation clauses are included. In which case an amendment must be approved.
b. All terms as for length of contract and number of renewals must be approved by the Purchasing Manager or designee.
5. Additions Insurance Requirements
a. List any additional insurance requirements that are not contained in the City’s terms and conditions.
b. The City requires at a minimum:
i. General Liability
ii. Auto
iii. Workers Compensation
c. Make sure you include any specific insurance, such as Builder’s Risk, Hazardous Liability, Liquor Liability and so on.
6. Bond Requirements
a. Some bids (usually construction) require bid, performance, or payment bonds.
b. Please note in the Scope of Work if any other bonds beyond the normal requirement may be needs.
7. Related Permits and Cost
a. Must include any pricing for all permits under State Statute or regulatory agencies as applies (i.e.
FAA, FDOT, etc…).
b. If permit is based on the construction cost percentage then inform the buyer.
c. Provide a chart or calculation formula for calculating the permit cost.
8. Technical Specifications
a. This needs to include a table of contents
b. Include page numbers as related to the title of the section (08330-1, 08330-2, etc.). This needs to be in the document header.
c. Do not include other footers. Such as project name or the directory where it can be found. The
Purchasing Division uses the footer for information about the bid.
d. Include plans. All drawings.
e. Be careful in using brand names.
i. Clarify that brand names are used for specifications only.
ii. Give details of the specification for name brands. Don’t just list the name brand.
iii. Provide provisions for approved alternates.
1. Include deadline for approved alternates. (example, 15 days before opening etc..)
f. Everything should be provided in an electronic format.
i. Include Word file and PDF file.
1. File names must be no more than 11 characters and cannot include special characters other than dashes.
ii. If specifications and plans are in multiple files you will need to provide a combined form that has all documents in the proper format and ordering. This should be in a PDF document with the exception of the bid form which may be in Excel.
9. Review City’s Standard Terms and Conditions
a. Note any conflict with the City’s Standard Terms and Conditions.
b. Note precedents in section 2 of the Terms and Conditions.
10. Post Bid Requirements
a. Provide a bid tabulation of ALL contactors/vendors that submitted bid
i. Analyze unit pricing for irregularities
b. Provide letter of recommendation for awarded vendor or justification why lowest bid should not be accept and why the next bid should be accepted.
c. Attend pre-construction meeting. This item may be provided by the Project Manager.
(Coordinate with Project Manager and Purchasing)
i. Provide agenda
ii. Provide follow up brief of pre-construction minutes
BID DOCUMENT REQUIREMENT SUMMARY (completed by Technical Specification Preparer)
1. Scope of Work Summary Brief summary
Reference page, section where noted in specs
2. Liquidated Damages $ Per Calendar Day Substantial Completion Days Calendar days
3. Final Completion Days Calendar days
4. Length of Contract and renewal
(May not apply if using section 3)
Initial term
Renewal terms
5. Additions Insurance Requirements Yes / No
6. Bond Requirements
7. Related Permits and Cost Check list of notable items
8. Technical Specifications ______ table of contents
Contractor/Vendor qualification (if applicable) page numbers formatted in header.
Footer blank Plans and Drawings included Brand Names include minimum specifications and “approved alternate” verbiage
Approved Alternate provision Provided electronic format
Word and PDF (all files combined) bid form which may be in Excel No special characters in titles
9. Review City’s Standard Terms and Conditions Note any conflict with the City’s Standard Terms and
Conditions.
List where items are located in documents
10. Engineer/Architect’s estimated project cost
Miscellaneous Notes:
| Blank Page |
| Blank Page |
| A-E Position List with descriptions12-29-25.pdf |
| 1-RFP Form |
| A-E Position List with descriptions12-29-25.pdf |
| 1-RFP Form |
File details come from the government source that posted it. Updated .