Exhibit_C_Scoring_Criteria.pdf

PDF 775 KB Posted

Attached to
Advanced Traffic Management System Design Continuing Services State and local contract opportunity
Solicitation number
26-18SS
Issued by
Sarasota County, Siesta Key CDP, Florida

About this file

This is a scoring criteria exhibit for a Consultant's Competitive Negotiation Act (CCNA) procurement conducted by the City of Sarasota, Florida for the Regional Advanced Traffic Management System (ATMS) design and engineering services. The City seeks to establish a continuing services contract library with multiple registered and qualified professional engineers to provide design, engineering support, preliminary studies, working drawings, specifications, cost estimates, fiber optic communication infrastructure design, construction engineering and inspection services, and consultation on an as-needed basis for the existing ATMS system serving Sarasota and Sarasota County, with potential coordination involving Sarasota County, Manatee County, the City of Bradenton, the Florida Department of Transportation, Breeze Transit, and the Sarasota-Manatee Metropolitan Planning Organization. Proposals are due by March 24, 2026, at 2:30 p.m., with the solicitation posted on January 29, 2026. The resulting contract will include a default term of one year with two optional one-year renewal periods for a total potential duration of three years. Contractors must perform at least 51 percent of total contract work with their own organization.

The evaluation utilizes four equally weighted scoring categories, each worth 25 points for a total of 100 points: Qualifications of Company, Personnel qualifications, Relevant Project Experience and References, and Approach and Methodology. Pricing is evaluated as a component of the overall proposal using a proportional scoring formula. Required qualifications include a minimum of five continuous years of experience providing signalization services for similar design and construction projects, active Florida professional engineer registration, and submission of four contractor references with a minimum of three confirmed references required for responsiveness. The project is federally funded through the Federal Emergency Management Agency (FEMA) and requires compliance with Davis-Bacon prevailing wage provisions, equal employment opportunity standards, and other federal requirements. Professional liability insurance of no less than one million dollars is required. Construction costs are restricted to projects not exceeding $7,500,000, and planning and study activities are capped at $500,000, adjusted annually by the Bureau of Labor Statistics Consumer Price Index beginning July 1, 2025. Proposals are limited to 150 single-sided pages and must be submitted electronically in PDF format through the City's online solicitation system.

View the file

Other files for this state and local contract opportunity

Other files attached to Advanced Traffic Management System Design Continuing Services, newest first.
File Type Posted
Advanced_Traffic_Management_System_Design_Continuing_Services_(Addendum_#1_Revision).pdf PDF
Advanced_Traffic_Management_System_Design_Continuing_Services_(Addendum_#1_Revision).pdf PDF
Advanced_Traffic_Management_System_Design_Continuing_Services_(Addendum_#1_Revision).pdf PDF
Advanced_Traffic_Management_System_Design_Continuing_Services.pdf PDF
Third_Party_Questionnaire.xlsx XLSX spreadsheet
Third_Party_Questionnaire.xlsx XLSX spreadsheet
Third_Party_Questionnaire.xlsx XLSX spreadsheet
Attachment_4_FHWA-1273_-_Required_Contract_Provisions.pdf PDF
Attachment_4_FHWA-1273_-_Required_Contract_Provisions.pdf PDF
Attachment_4_FHWA-1273_-_Required_Contract_Provisions.pdf PDF
Attachment_4_FHWA-1273_-_Required_Contract_Provisions.pdf PDF
Appendix_A_Certification_Regarding_Lobbying.pdf PDF
Attachment_2_50A-_FEDERAL_GENERAL_TERMS_AND_CONDITIONS_.PDF PDF
Exhibit_B_Proposal_Requirements.pdf PDF
Exhibit_D_Titles_and_Position.pdf PDF
Exhibit_C_Scoring_Criteria.pdf PDF
Attachment_2_50A-_FEDERAL_GENERAL_TERMS_AND_CONDITIONS_.PDF PDF
Exhibit_A_Scope_of_Services.pdf PDF
Exhibit_B_Proposal_Requirements.pdf PDF
Attachment_2_50A-_FEDERAL_GENERAL_TERMS_AND_CONDITIONS_.PDF PDF
Attachment_3_Supplemental_Instructions-Contract_Clauses_for_Federal_Awards.PDF PDF
Exhibit_B_Proposal_Requirements.pdf PDF
Appendix_C_CERTIFICATION_REGARDING_DEBARMENT.pdf PDF
Attachment_1_Forms_Packet.pdf PDF
Attachment_2_50A-_FEDERAL_GENERAL_TERMS_AND_CONDITIONS_.PDF PDF
Appendix_C_CERTIFICATION_REGARDING_DEBARMENT.pdf PDF
Attachment_3_Supplemental_Instructions-Contract_Clauses_for_Federal_Awards.PDF PDF
Exhibit_A_Scope_of_Services.pdf PDF
Appendix_A_Certification_Regarding_Lobbying.pdf PDF
Attachment_2_50A-_FEDERAL_GENERAL_TERMS_AND_CONDITIONS_.PDF PDF
Exhibit_B_Proposal_Requirements.pdf PDF
Exhibit_D_Titles_and_Position.pdf PDF
Appendix_C_CERTIFICATION_REGARDING_DEBARMENT.pdf PDF
Attachment_1_Forms_Packet.pdf PDF
Exhibit_D_Titles_and_Position.pdf PDF
Appendix_B_Foreign_Country_of_Concern_Attestation.pdf PDF
Attachment_3_Supplemental_Instructions-Contract_Clauses_for_Federal_Awards.PDF PDF
Exhibit_A_Scope_of_Services.pdf PDF
Appendix_B_Foreign_Country_of_Concern_Attestation.pdf PDF
Exhibit_C_Scoring_Criteria.pdf PDF
RFPCCNA_General_Terms_and_Conditions.pdf PDF
Appendix_C_CERTIFICATION_REGARDING_DEBARMENT.pdf PDF
Attachment_1_Forms_Packet.pdf PDF
Exhibit_A_Scope_of_Services.pdf PDF
Appendix_A_Certification_Regarding_Lobbying.pdf PDF
Appendix_B_Foreign_Country_of_Concern_Attestation.pdf PDF
RFPCCNA_General_Terms_and_Conditions.pdf PDF
Appendix_B_Foreign_Country_of_Concern_Attestation.pdf PDF
Appendix_C_CERTIFICATION_REGARDING_DEBARMENT.pdf PDF
Exhibit_A_Scope_of_Services.pdf PDF
Show all 50

Advanced Traffic Management System Design Continuing Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit C Scoring Criteria

Category Category Title Category Description Points

(CCNA)

1 Qualifications of Company

Includes firm qualifications, relevant experience, and organizational capacity. Company Introduction and Executive Summary.

2 Personnel Personnel qualifications. 25

3 Relevant Project Experience and References

Services (past projects) and references that support your comments on the professional services you provide. References shall be used to validate the Proposer’s experience and past performance.

4 Approach and Methodology

Proposer’s understanding of the Scope of Services and the approach, methodology, and project management practices proposed for delivering professional services.

Total Score 100

Exhibit C

Sheet1

File details come from the government source that posted it. Updated .