EXHIBIT C - WORK-COMPLETION_DELIVERABLE SCHEDULE.pdf
PDF 584 KB Posted
- Attached to
- Full-Size SUV (6)
- Solicitation number
- DR144127
- Issued by
- California
About this file
This is a Work-Completion/Deliverable Schedule exhibit for a state or local contract that establishes timeline requirements and associated penalties for contractor performance. The document outlines a framework for tracking project milestones, with provisions for up to six major contract completion dates measured in calendar days from the effective start date. The contractor is required to furnish sufficient forces, facilities, equipment, and materials—including provisions for extra shifts and overtime operations as necessary—to ensure timely completion of work according to the specified schedule. Each milestone is designated with a corresponding liquidated damages amount that will be assessed on a per-calendar-day basis for any failure to meet the scheduled dates.
The specific milestone descriptions, scheduled completion dates, and daily liquidated damages amounts are left blank in this template document, indicating that these critical contract terms will be completed during the procurement process. The exhibit emphasizes the contractor's responsibility to maintain adequate resources and staffing levels to meet all contractual obligations without delay. The liquidated damages provision serves as a financial incentive mechanism to ensure contractor performance and on-time project delivery, with the daily rate to be determined and inserted into the final contract agreement.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C - WORK-COMPLETION / DELIVERABLE SCHEDULE
Contractor shall furnish sufficient forces, facilities equipment and materials necessary along with such hours, including extra shifts and overtime operations, so as to prosecute the Work/Deliverable to completion in accordance with the following major Contract dates:
* The maximum liquidated damages for which the Contractor shall be liable shall be $________ per day for failure to meet any or all Milestones.
Work / Deliverable Schedule
Description Schedule Liquidated
Damages Amount Per Calendar Day*
No. 1 ______ calendar days after effective start date of .
No. 2 ______ calendar days after effective start date of .
No. 3 ______ calendar days after effective start date of .
No. 4 ______ calendar days after effective start date of .
No. 5 ______ calendar days after effective start date of .
No. 6 ______ calendar days after effective start date of .
| Text1: |
| Text2: |
| ComboBox3: [Contract] |
| Text4: |
| Text5: |
| Text6: |
| ComboBox7: [Contract] |
| Text8: |
| Text9: |
| Text10: |
| ComboBox11: [Contract] |
| Text12: |
| Text13: |
| Text14: |
| ComboBox15: [Contract] |
| Text16: |
| Text17: |
| Text18: |
| ComboBox20: [Contract] |
| Text21: |
| Text22: |
| Text23: |
| ComboBox24: [Contract] |
| Text25: |
| Text26: |
File details come from the government source that posted it. Updated .