EXHIBIT C - WORK-COMPLETION_DELIVERABLE SCHEDULE.pdf
PDF 485 KB Posted
- Solicitation number
- DR144580
- Issued by
- California
About this file
This is a Work-Completion/Deliverable Schedule exhibit document that establishes milestone requirements and performance accountability for a contractor. The contractor is obligated to furnish sufficient forces, facilities, equipment, and materials, including provisions for extended shifts and overtime operations as necessary, to complete work deliverables according to specified contractual milestones. The schedule contains six major work milestones with associated completion deadlines measured in calendar days from the effective start date of the contract. One identified deliverable is a Field Command Vehicle, with the first milestone set at 180 calendar days after the contract's effective start date. The document provides a framework for tracking and enforcing adherence to project timelines through defined performance checkpoints.
The exhibit incorporates liquidated damages provisions as a performance enforcement mechanism, establishing daily penalty amounts for contractor failure to meet any or all specified milestones. The liquidated damages amount per calendar day is left blank in the template, indicating this value must be completed during contract finalization. The remaining five milestone descriptions, schedules, and associated deliverables are incomplete in this template version, with blank fields for specific work descriptions, calendar day requirements, and corresponding contract references. This document serves as a contractual tool to ensure timely project completion while providing the procuring entity with predetermined compensation for schedule delays.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C - WORK-COMPLETION / DELIVERABLE SCHEDULE
Contractor shall furnish sufficient forces, facilities equipment and materials necessary along with such hours, including extra shifts and overtime operations, so as to prosecute the Work/Deliverable to completion in accordance with the following major Contract dates:
* The maximum liquidated damages for which the Contractor shall be liable shall be $________ per day for failure to meet any or all Milestones.
Work / Deliverable Schedule
Description Schedule Liquidated
Damages Amount Per Calendar Day*
No. 1 ______ calendar days after effective start date of .
No. 2 ______ calendar days after effective start date of .
No. 3 ______ calendar days after effective start date of .
No. 4 ______ calendar days after effective start date of .
No. 5 ______ calendar days after effective start date of .
No. 6 ______ calendar days after effective start date of .
| Text1: Field Command Vehicle |
| Text2: 180 |
| ComboBox3: [Contract] |
| Text4: |
| Text5: |
| Text6: |
| ComboBox7: [Contract] |
| Text8: |
| Text9: |
| Text10: |
| ComboBox11: [Contract] |
| Text12: |
| Text13: |
| Text14: |
| ComboBox15: [Contract] |
| Text16: |
| Text17: |
| Text18: |
| ComboBox20: [Contract] |
| Text21: |
| Text22: |
| Text23: |
| ComboBox24: [Contract] |
| Text25: |
| Text26: |
File details come from the government source that posted it. Updated .