Exhibit C Site Development Design Documents.pdf
PDF 7 MB Posted
- Attached to
- MT GOAT Site Construction Project
- Solicitation number
- IFB1 FAAA 2027000006 1
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a site development design document package for the MT GOAT Site Construction Project located in Colorado, prepared by Design Edge, P.C. and Anchor Engineering, Inc. The project involves the construction of two commercial buildings with associated site work in Commerce City and Pueblo, Colorado. The scope includes site grading, foundation design, structural construction, electrical systems, parking facilities, and stormwater management. The design documents consist of grading plans for two sites (Birch Street and Jasmine locations), with the Birch Street site encompassing approximately 423 square feet of proposed concrete, 712 square feet of proposed asphalt, and EV-ready parking stall provisions. The Jasmine site includes approximately 226 square feet of proposed concrete walk and 161 square feet of additional concrete construction around the building. Both sites feature 6-inch thick slabs on grade with frost-depth turn-down edges, minor swales for drainage direction, and foundation pads extended 6 inches beyond building edges. The structural design is based on the 2024 International Building Code with snow loads of 35 psf ground and 30 psf flat roof, wind speeds of 115 mph, and seismic design category B. Construction documents are dated June 26, 2026, at 100 percent completion submittal status.
The electrical system design includes a new 50 kVA pad-mounted transformer (120/240V, single-phase, 3-wire) supplied by Xcel Energy, with a 200-ampere load center and service disconnect rated for the facility requirements. The project specifies rigid metal conduit throughout with copper conductors, NEMA 3R enclosures for exterior equipment, and compliance with the 2023 National Electrical Code. Structural concrete specifications require Type 1L Portland cement with sulfate exposure class S1, minimum 28-day compressive strengths of 3,000 psi for foundations and 4,000 psi for exterior slabs, and reinforcing steel Grade 60 per ASTM A615 or A706. Special inspections are required for soil preparation, foundation bearing verification, and concrete placement in accordance with Chapter 17 of the governing building code. The contractor is responsible for all coordination between disciplines, site utility verification, protection of materials, schedule coordination with other trades, and submission of as-built record documents. The design assumes presumptive soil bearing capacity of 1,500 psf with 36-inch minimum frost depth and recommends geotechnical verification through on-site testing by a qualified engineer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H Y
D
WAT
SS
30.00'
22.00'
3.00'
20.00'
11.83' 7.17'
18.00'
8.50'
PRO. STRIPING
PRO. FENCE
~75 SF
REMOVE PORTION OF
EX. FENCE; ~37 LF
2.8%
2.2%
2.1%
36.69 36.71
36.86 36.84
37.22
37.25
37.22
37.30
37.30
MATCH EX.
5136.54
MATCH EX.
5136.72
MATCH EX.
5135.96
MATCH EX.
5136.44 MATCH EX.
5136.27
MATCH EX.
5136.46
MATCH EX.
5136.53
PRO. BLDG
FFE=5137.34
PRO. CONCRETE; ~423 SF
SLOPE SIDEWALK AWAY
FROM BUILDING @ 2% MAX
PRO. ASPHALT;
~712 SF
7.33'
6.91'
BIRCH STREET
BI
R
C H
S
TR
EE
T
(6 0'
P U
BL
IC
R .O
.W
1.5%
1.2% 1.4%
1.3%
4:1 MAX
TO MATCH EXISTING
5.0% MAX
TO MATCH EXISTING
FOR PEDESTRIAN PATH
5.0% MAX
TO MATCH EXISTING
FOR PEDESTRIAN PATH
H.P. INSTALL MINOR SWALE
TO DIRECT FLOWS AROUND BUILDING
EXTEND FOUNDATION
PAD 6" BEYOND EDGE OF
BUILDING ON ALL SIDES
PRO. EV-READY PARKING STALL
H
Y
D
WAT
SS
BI
R
C H
S
TR
EE
T
(6 0'
P U
BL
IC
R .O
.W
H
Y
D
WAT
BI
R
C H
S
TR
EE
T
(6 0'
P U
BL
IC
R .O
.W
H
Y
D
WAT
BI
R
C H
S
TR
EE
T
(6 0'
P U
BL
IC
R .O
.W
N
30'20'10'0'
SCALE: 1"=10'
LEGAL DESCRIPTION:
A PARCEL OF LAND BEING A PORTION OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 31, TOWNSHIP 2 SOUTH, RANGE 67 WEST OF THE 6TH PRINCIPAL MERIDIAN, COUNTY OF ADAMS, STATE OF COLORADO, BEING
MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTH QUARTER CORNER OF SAID SECTION 31;
THENCE ALONG THE SOUTH LINE OF SAID SOUTHWEST QUARTER, SOUTH 89 DEGREES 48 MINUTES 21 SECONDS WEST, 1,322.06 FEET TO THE SOUTHEAST CORNER OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SAID
SECTION 31;
THENCE CONTINUING ALONG SAID SOUTH LINE, SOUTH 89 DEGREES 28 MINUT5ES 41 SECONDS WEST 40 FEET;
THENCE LEAVING SAID SOUTH LINE, NORTH 00 DEGREES 25 MINUTES 14 SECONDS WEST 60 FEET TO THE INTERSECTION OF THE NORTHERLY RIGHT-OF-WAY OF 72ND AVENUE AND THE WESTERLY RIGHT-OF-WAY OF BIRCH STREET;
THENCE LEAVING SAID NORTHERLY RIGHT-OF-WAY LINE AND ALONG SAID WESTERLY RIGHT-OF-WAY LINE, NORTH 00 DEGREES 25 MINUTES 14 SECONDS WEST 212.29 FEET TO THE NORTHERLY LINE OF THE ADAMS COMMUNITY MENTAL HEALTH CENTER AS DESCRIBED IN BOOK 3222, PAGE 938 AND THE TRUE POINT OF BEGINNING;
THENCE ALONG THE NORTHERLY AND WESTERLY LINES OF SAID MENTAL HEALTH CENTER THE FOLLOWING TWO (2)
CONSECUTIVE COURSES:
1) THENCE LEAVING SAID WESTERLY RIGHT5-OF-WAY LINE, SOUTH 89 DEGREES 48 MINUTES 25 SECONDS WEST 350.04
FEET;
2) THENCE SOUTH 00 DEGREES 01 MINUTES 43 SECONDS EAST234.31 FEET TO THE NORTHERLY RIGHT-OF-WAY LINE OF
SAID 72ND AVENUE;
THENCE ALONG SAID NORTHERLY LINE SOUTH 89 DEGREES 29 MINUTES 49 SECONDS WEST 485.29 FEET TO THE EASTERLY RIGHT-OF-WAY LINE OF COLORADO BOULEVARD AS DESCRIBED AS A TRACT OR PARCEL OF LAND NO. 101-X FROM THE
COLORADO DEPARTMENT OF HIGHWAYS AS RECORDED IN BOOK 2416 AT PAGE 904;
THENCE LEAVING SAID NORTHERLY RIGHT-OF-WAY LINE AND ALONG SAID EASTERLY RIGHT-OF-WAY LINE THE FOLLOWING
FOUR (4) CONSECUTIVE COURSES:
1) THENCE 32.23 FEET ALONG A NON TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 1,015.00 FEET, A CENTRAL ANGLE OF 01 DEGREES 49 MINUTES 10 SECONDS AND A CHORD WHICH BEARS NORTH 18 DEGREES 50 MINUTES 31
SECONDS EAST 32.23 FEET;
2) THENCE ALONG A NON TANGENT LINE NORTH 17 DEGREES 55 MINUTES 49 SECONDS EAST 764.20 FEET;
3) THENCE NORTH 24 DEGREES 20 MINUTES 19 SECONDS EAST 179.20 FEET;
4) THENCE 246.75 FEET ALONG A NON-TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 844.00 FEET, A CENTRAL
ANGLE OF 16 DEGREES 45 MINUTES 03 SECONDS, AND A CHORD WHICH BEARS NORTH 09 DEGREES 33 MINUTES 14
SECONDS EAST 245.87 FEET TO THE SOUTHERLY RIGHT-OF-WAY LINE OF 74TH AVENUE;
THENCE ALONG THE SOUTHERLY RIGHT-OF-WAY LINE OF SAID 74TH AVENUE NORTH 89 DEGREES 36 MINUTES 07 SECONDS EAST 259.70 FEET TO THE WESTERLY LINE OF A PARCEL KNOWN AS WASHINGTON HOUSE AS RECORDED IN BOOK 2603 AT
PAGE 792;
THENCE LEAVING SAID SOUTHERLY RIGHT-OF-WAY LINE AND ALONG THE WESTERLY LINE OF SAID WASHINGTON HOUSE PARCEL SOUTH 00 DEGREES 23 MINUTES 57 SECONDS EAST 209.48 FEET TO THE SOUTHWESTERLY CORNER OF SAID WASHINGTON HOUSE PARCEL AND THE NORTHWESTERLY CORNER OF A PARCEL RECORDED IN BOOK 1949 AT PAGE 121;
THENCE ALONG THE WESTERLY AND SOUTHERLY LINES OF SAID PARCEL THE FOLLOWING TWO (2) CONSECUTIVE
COURSES:
1) THENCE CONTINUING SOUTH 00 DEGREES 23 MINUTES 57 SECONDS EAST 208.78 FEET;
2) THENCE NORTH 89 DEGREES 36 MINUTES 03 SECONDS EAST 208.52 FEET TO THE WESTERLY RIGHT-OF-WAY LINE OF
SAID BIRCH STREET;
THENCE LEAVING SAID PARCEL AND ALONG THE WESTERLY RIGHT-OF-WAY LINE OF BIRCH STREET SOUTH 00 DEGREES 25
MINUTES 14 SECONDS EAST 508.59 FEET TOT EH TRUE POINT OF BEGINNING,
COUNTY OF ADAMS, STATE OF COLORADO
THE ABOVE LEGAL DESCRIPTION DESCRIBES ALL THAT LAND CONTAINED IN SPECIAL WARRANTY DEED RECORDED ON
JANUARY 2, 2015 AT RECEPTION NUMBER 2015000000250 IN ADAMS COUNTY, COLORADO.
N
XXXX
XXXSLOPE
MAJOR CONTOUR
MINOR CONTOUR
SPOT ELEVATION
GRADING LEGEND
GAS GAS
SAN
WAT WAT
ELEC ELEC
OHE OHE
IRR
CURB AND GUTTER (SPILL)
CURB AND GUTTER (CATCH)
STORM SEWER
SANITARY SEWER
WATER LINE
GAS LINE
ELECTRICAL
OVERHEAD POWER LINES
IRRIGATION LINE
ELECTRICAL BOX
SITE LIGHT
SIGN
MANHOLES
INLET
WATER METER
GATE VALVE
THRUST BLOCK
CLEAN OUT
TREE
RETAINING WALL
PROPOSED
UTILITY POLE
GAS METER
FIRE HYDRANT
FIRE DEPARTMENT CONNECTION
BLOW-OFF W PLUG (H.P.)
FO FOFIBER OPTIC LINE
M
CO
FDCFDC
WATWAT
M
H Y D H Y D
BACK OF CURB
FLOWLINE
LIP (SPILL)
BACK OF CURB
FLOWLINE
LIP (CATCH)
GREASE INTERCEPTOR
MASTER LEGEND
FLARED END SECTION
SSST SAN
IRRIGATION BOX/VALVE
ST
CONCRETE
LANDSCAPE
PROPOSED
ASPHALT
HATCHING LEGEND
LIMIT OF CONSTRUCTION
Scale: 1"=10' VEHICLE TRACKING F-250 PULLING IN; STEP 11 Scale: 1"=10'
VEHICLE TRACKING F-250 PULLING IN; STEP 22 Scale: 1"=10'
VEHICLE TRACKING F-250 PULLING IN; STEP 33
SHEET TITLE
SHEET
REVISED:
CHECKED
DRAWN BY
DATE
PROJECT NO.
c COPYRIGHT 2026, DESIGN EDGE, P.C. ALL
RIGHTS RESERVED. ANY COPYING OR OTHER
REPRODUCTION OF THESE DRAWINGS WITHOUT
THE PRIOR WRITTEN AUTHORIZATION OF
DESIGN EDGE, P.C. CONSTITUTES A VIOLATION
OF COPYRIGHT LAW AND WILL BE SUBJECT TO
LEGAL ACTION.
482 S Broadway, Suite 100 Denver, Colorado 80209
303-260-7277 www.de-arch.com
25145
AT
O
Ps S
B M
T G
O
AT
SI
TE
D
EV
EL
O
PM
EN
T C
O M
M
ER
C E
C
IT
Y
PU
EB
LO
, C
O
LO
R
AD
O
PR
O J.
N U
M
BE
R ; C
T
*3
6/26/2026
90% Submittal 6/5/2026
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
C1.1
BIRCH STREET SITE
GRADING PLAN
TYPICAL SWALE SECTION:
(N.T.S.)
SWALE FLOWLINE
SEE BELOW NOTES
PERIMETER WALK
1. DEPTH = 1" MIN. AT H.P.
2. LONGITUDINAL SLOPE = 2% MIN.
3. 3:1 MAX SIDE SLOPES
4. NATIVE SEED BOTTOM
GJB
CCH
100% Construction Docs 6/26/2026
06.29.2026
STRUCTURAL GENERAL NOTES
GOVERNING BUILDING CODE
Code: International Building Code (IBC) - 2024 Edition w/ Local Amendments
Snow:
Ground Snow Load, Pg............................................. 35 psf Flat Roof Snow Load, Pf.......................................... 30 psf Snow Importance Factor, Is...................................... 1.0 Exposure Factor, Ce................................................. 1.0 Thermal Factor, Ct................................................... 1.2 Slope Factor(s), Cs................................................... 1.0
Wind:
Ultimate (Basic) Design Wind Speed, V(ULT)............ 115 MPH (3-Second Gust) Risk Category............................................................II Exposure...................................................................C
Seismic:
Seismic Design Category..........................................B Risk Category............................................................II Seismic Importance Factor, Ie.................................. 1.0 Mapped Spectral Response Coefficient, Ss.............. 0.201 Mapped Spectral Response Coefficient, S1.............. 0.057 Design Spectral Response Coefficient, SDS..............0.214 Design Spectral Response Coefficient, SD1.............. 0.091 Site Class..................................................................D Seismic Response Coefficient, C s............................ 0.01 Design Base Shear................................................... 0.1k
DESIGN LOADS
Floor: Live Load Storage................................. 125 psf
Roof: Live Load Typical Roof Load.................40 psf
GENERAL CONSTRUCTION NOTES
- The Structural Contract Documents are intended to be used in conjunction w/ the plans of all other disciplines working on the project. The contractor is responsible for the coordination of all required information indicated on the Structural Contract Documents & incorporating these requirements into the shop drawings of all other disciplines prior to submittal to Anchor Engineering, Inc.
- Information provided within the Structural Contract Documents is subject to all requirements specified within the governing building code. The contractor shall be familiar w/ all portions of the governing building code that impact the type of construction being performed. For conditions where the Structural Contract Documents conflict w/ the governing building code, the more stringent requirements shall apply. The contractor shall keep a copy of the governing building code on site at all times during the construction phase of the project for reference. Anchor Engineering, Inc. shall be notified of any modifications resulting from a more stringent code requirement prior to construction for verification & coordination.
- Modifications to the Structural Contract Documents due to conditions at the site that are unknown or concealed at the time of design do not fall within the original scope of work of the project. Required modifications shall be performed as additional services as outlined in the project contract. The Engineer shall be notified in writing by a Request for Information (RFI) to provide recommendations for resolution of the modification requested.
- Dimensions & elevations indicated on the Structural Contract Documents shall be coordinated by the contractor w/ all other disciplines prior to the beginning of construction. Discrepancies shall be brought to the attention of the Architect. Scaling of the Structural Contract Documents is not permitted.
- The contractor shall verify field conditions including existing utilities, sub-grade & above grade conditions which may interfere w/ construction & notify the applicable disciplines for modifications as required.
- In the event of discrepancies btwn. project specifications, general notes, plans & details, the most stringent req'm. shall apply unless approved in writing.
- Coordinate all openings through roof, floors, & walls w/ the appropriate disciplines. The penetration of structural members, unless specifically indicated on the Structural Contract Documents is not permitted without the review & consent of Anchor Engineering, Inc. including Post Tensioned slab on grade & all elevated slab construction. Openings & penetrations brought to the attention of the Engineer after the Structural Contract Documents are submitted to the city for review shall be subject to the requirements outlined in the Shop Drawings & Submittals section of the general notes.
- All items embedded into concrete or masonry shall be positively secured against the hydraulic forces from concrete placement or incidental contact from tools or equipment during concrete placement. The special inspector shall verify all embedded items are secured prior to placement of concrete.
- Unless specifically detailed &/or specified on the Structural Contract Documents, stairs, balusters, half-walls & railings for decks, balconies, awnings, sun shades & walkways as well as site retaining walls & improvements have not been designed by Anchor Engineering, Inc. Design & construction of these elements, when not expressly shown on the Structural Contract Documents, are the responsibility of the general contractor. These elements are considered design-build & the general contractor shall submit plans & calculations, sealed & signed by a professional engineer licensed in the state where the work is being performed.
REINFORCED CONCRETE
- Design is based on "Building Code Requirements for Reinforced Concrete" (ACI 318 - Latest Edition). Concrete work shall conform to "Specifications for Structural Concrete for Buildings" (ACI 301 - Latest Edition). Hot & cold weather shall be in conformance w/ ACI 305 & ACI 306 respectively.
- Structural concrete shall have min. 28-day compressive strengths as follows:
Grade Beams & Foundation Walls................. 3,000 psi Footings / Piers...............................................3,000 psi Interior Slabs-On-Grade................................. 3,500 psi Exterior Slabs-On-Grade................................ 4,000 psi Other...............................................................3,000 psi
- Cement shall be Type 1L (MS) Portland Cement, conforming to ASTM C595 with a Sulfate Exposure Class of S1.
- Cement shall meet the maximum expansion requirements indicated in ACI 301 Table 4.2.2.6.(b)1 when tested in accordance with ASTM C1012 for Sulfate Exposure Classes S1, S2, or S3.
- Maximum permissible Water/Cement ratio shall not exceed 0.50.
- Aggregate size shall not exceed 3/4" unless noted otherwise.
- Chloride admixtures shall not be used.
- Concrete exposed to weather shall have a min. air entrainment of 6 ± 11
2 percent.
- Air entrainment may be used for interior concrete not exposed to weather but may result in finishing complications.
- Fly ash shall conform to ASTM specification C618, Class C or Class F. Fly ash shall not exceed 20% of the total weight of cementitious material unless noted otherwise.
- The concrete information provided is a performance specification indicating the final in-place concrete requirements only. The actual concrete mix design is provided by the concrete supplier and shall be sealed and signed by a Professional Engineer licensed in the state where the work is being performed. Anchor Engineering, Inc. is not responsible for the performance of the mix during construction, or the means & methods required to attain the specified in-place concrete requirements. The contractor & concrete supplier should consider the required means & methods for each mix design to ensure performance.
- Slabs & grade beams shall not have cold joints in a horizontal plane. Where stop in concrete placement is necessary at a point other than shown on these drawings, contact the Structural Engineer for direction. Vertical construction joints within grade beams shall be made within the center third of the span between supports. Horizontal shear keys or a roughened surface shall be provided. All reinforcing shall be continuous through construction joints.
- Reinforcing Bars shall conform to ASTM A615 or ASTM A706. All bars shall be Grade 60. Bars to be welded shall conform to ASTM A706. Detailing, fabrication, & placement of reinforcing steel shall be in accordance w/ the "Manual of Standard Practice for Detailing Reinforced Concrete Structures (ACI 315 - latest ed.)". No splices of reinforcement shall be made & no welding to reinforcing shall be permitted except as shown or as approved by the Structural Engineer. Any welding of reinforcing thus approved shall be done by certified welders in strict conformance to the "AWS Structural Welding Code - Reinforcing Steel" of the American Welding Society (AWS D1.4 latest ed.). "Tack" welding of/to reinforcing will not be permitted under any circumstances. min. length of lapped splices shall be Class B tension splices as indicated in the reinforcing bar splice schedule on this sheet, unless noted otherwise. Make all bars continuous at corners/intersections or provide corner bars of equal size. Welded wire mesh shall be lapped one full mesh at sides & one full mesh plus 2" at the ends but not less than 6" & shall be wire tied.
- Reinforcing bar extending from surface of cured concrete shall not be twisted in order to achieve correct alignment. Contact Anchor Engineering for repair at all locations where reinforcing bar hooks or extensions are not placed w/ correct orientation or where bars are twisted inadvertently.
- Where cont. bars in beams/grade beams, & walls must be spliced, slice top bars at mid-span & splice bot. bars over supports.
- Unless noted otherwise on plan or in details, concrete protection for reinforcement in cast-in-place conc. shall be as follows:
a. Conc. cast against & permanently exposed to earth........ 3"
b. Formed surfaces exposed to earth or weather:
#6 through #11 bars............................................... 2" #5 bar, W31 or D31 wire, & smaller
2"
c. Conc. not exposed to weather or in contact w/ ground:
Slabs, walls, joists:
#11 bar & smaller
4" Beams, columns:
Primary Reinforcement 2"
Stirrups, ties, spirals 2"
- Provide (2) #5 bars, one each face, w/ 2'-0" projection on all sides of openings in concrete, unless noted otherwise.
- Provide #3 stirrup support bars where required by absence of other longitudinal reinforcement, use #4 in spandrel beams.
- For non-warehouse or non-industrial slabs-on-grade conditions, reinforced w/ a min. of ASTM A1064, 70 ksi 6x6-W2.1xW2.1
W.W.M. for up to 5" thick slabs or 6x6-W2.9xW2.9 W.W.M. for 6" slabs unless noted otherwise. W.W.M. shall be lapped one full mesh at sides & one full mesh plus 2" at the ends but not less than 6" & shall be wire tied. (Slabs-on-grade shall be reinforced w/ Fibermesh, dosage by others, unless noted otherwise.)
- For warehouse or industrial slabs-on-grade conditions:
· 6" thick slabs - reinforced w/ a min. of #5 bar @ 14" o.c. max., each way.
· 8" thick slabs - reinforced w/ a min. of #5 bar @ 10" o.c. max., each way.
- Provide a 6-mil min. thickness polyethylene vapor retarder between the subgrade and concrete slab-on-grade with joints lapped not less than 6". Contractor to verify with Architect if an increased thickness is required.
- Contractor to allow for 100 lineal feet of #5 rebar to be used at the discretion of the Engineer of Record. Bar not used for construction shall be returned to supplier & the returned bar cost shall be credited back to the owner.
STRUCTURAL OBSERVATIONS
- Structural Engineer shall make periodic observations of the construction during placement of foundation & erection of structural framing. The purpose of the observations shall be to become generally familiar w/ the quality of work of the contractor in order to determine general conformance w/ the contract documents. Such observations shall not replace required inspections by the governing authorities or serve as "special inspections" as may be required by Chapter 17 of the governing building code.
- The contractor shall notify the Structural Engineer at the following stages of construction so that these observations may be made:
a. Prior to placing foundation concrete (after reinforcement placement).
- Notification for observation shall be given to the Structural Engineer at least 24 hours prior to the time the observation is needed. The Structural Engineer may not make observations at each notification & lack of observation shall not stop progress of construction nor shall the observation indicate owner's acceptance of all work related to the observation.
FOUNDATION DESIGN (Presumptive Load Bearing Values)
- Per the direction of the Owner or Owners Representative, the foundation design is based on IBC Table 1806.2 "Presumptive Load-Bearing Values" and IBC Table 1610.1 "Lateral Soil Load" assuming clay, sandy clay, silty clay, clayey silt, silt, or sandy silt (CL, ML, or ML-CL) soils. Our office recommends the indicated design values and soil type are verified through on-site geotechnical testing/evaluation by a qualified geotechnical engineer.
- Conventional Spread Footings:
a. Maximum Allowable Bearing Pressure...................1,500 psf
b. Minimum Frost Depth............................................. 36"
- All footings shall be placed on adequate bearing stratum or to a min. depth as shown on the drawings, whichever is deeper.
- Our office recommends a qualified geotechnical engineer observe excavations prior to concreting operations to verify the adequacy of the bearing stratum. If observed, a copy of a field report shall be transmitted to the engineer of record.
- Foundation walls have been designed for an equivalent active fluid pressure of 60 pcf, an equivalent at-rest fluid pressure of
100 pcf, & an equivalent passive fluid pressure of 225 pcf. Pressure values assume Contractor provides adequate de-watering measures for site.
- Refer to the project Governing Building Code for foundation perimeter drain requirements, typ.
- Owner to note: Foundation designs based on presumptive soil values may result in vertical and/or lateral differential movement. Owner accepts all risk associated with issues that may arise due to the use of presumptive soil values.
SPECIAL INSPECTION REQUIREMENTS
- A special inspector shall be engaged to make Special Inspections of the construction work as outlined below in conformance w/ the provisions of chapter 17 of the Governing Building Code.
- Special Inspections shall be performed by an independent, established & recognized agency approved by the building official as demonstrating competence in performing the required Special Inspections.
- It is the responsibility of the special inspection agency to work with the General Contractor and Ownership to ensure that all Special Inspections and tests required by IBC Section 1705 and associated referenced standards are performed.
- All Special Inspection reports shall be in accordance with IBC Section 1704.2.4, including the specific statement that Special Inspections were performed. Observations shall not take the place of Special Inspections and as reports indicating Observation(s) rather than Special Inspection(s) do not meet the requirements outlined in the Governing Building Code, they shall be rejected.
- The special inspector shall have experience in the Special Inspection of the particular type of construction or operation for which the Special Inspection is being performed.
- The special inspection agency shall keep records of all Special Inspections performed. A copy of all Special Inspection reports shall be provided to the building official as well as to Anchor Engineering, Inc.
- Special Inspection reports shall specify that work undergoing Special Inspection was or was not completed in conformance to the most recent approved Structural Contract Documents. Any discrepancies w/ the Structural Contract Documents shall be brought to the immediate attention of the contractor for correction. All required structural corrections/modifications shall be submitted to Anchor Engineering, Inc. & adequate time shall be allotted for by the contractor for review & response. Costs incurred due to required corrections, modifications & time delays shall be the sole responsibility of the contractor.
- A final report documenting the required Special Inspections shall be issued by the special inspection agency to the building department as well as Anchor Engineering, Inc. stipulating that all items are in conformance w/ the Structural Contract Documents, additional documentation provided by the A.H.J., or Anchor Engineering, Inc. Reports provided to Anchor Engineering, Inc. must follow the format in ICC form B.3.4. All Structural Contract Documents used in the special inspection process shall be identified & itemized, including dates of issue.
- Special Inspection reports shall include the names of personnel on site during inspection.
- The following work shall have Special Inspections provided by the special inspection agency in accordance with chapter 17 of the Governing Building Code and referenced standards:
Soils:
1. Site preparation - Special inspector shall determine that the site has been prepared in compliance w/ the soils report prior to placement of fill material
2. Special inspector shall verify load bearing requirements, fill material, lift thickness & moisture content are in accordance w/ the soils report.
3. The special inspector shall verify the in-place density & moisture content of the compacted fill is in compliance w/ the soils report.
4. The Special Inspector shall perform periodic inspections to verify materials below shallow foundations are adequate to achieve the design bearing capacity as specified in the geotechnical report.
5. The Special Inspector shall perform periodic inspections to verify excavations are extended to proper depth & have reached proper material as specified in the geotechnical report.
6. The Special Inspector shall perform periodic inspections to classify & test compacted fill materials.
7. The Special Inspector shall perform continuous inspections during placement & compaction of compacted fill to verify use of proper materials, densities, & lift thickness as specified in the geotechnical report.
8. The Special Inspector shall perform periodic inspections prior to placement of compacted fill to verify that the site has been prepared properly as specified in the geotechnical report.
9. The Special Inspector shall perform any other inspections required by the project geotechnical engineer.
DEFERRED SUBMITTALS
- Unless specifically detailed herein and/or specified on the structural contract documents, the following items have not been designed by Anchor Engineering, Inc. Design & construction of these elements, when not expressly shown on the Structural Contract Documents, are the responsibility of the General Contractor. These elements are considered design-build & the General Contractor shall submit plans & calculations to our office for review. The plans & calculations must be sealed & signed by a Professional Engineer licensed in the state where the work is being performed unless noted otherwise.
- Where design-build elements interact with any other design-build elements on the project, the General Contractor shall sequence design and submittals as required to ensure all structural interactions between the elements are accounted for by the specialty engineer for each respective design-build element. Fabrication shall not commence until the design of each interacting design-build element is complete, and the deferred submittals have been reviewed by the Engineer of Record and fully coordinated by the General Contractor.
· Prefabricated Equipment Shelter
SPECIAL INSPECTION REQUIREMENTS Cont.
Concrete Construction:
1. Placement of Reinforcement - Special Inspection need not be continuous but must be done once placement is completed
& prior to closing the forms. Items to be checked include bar size, grade, quantities, locations, spacing, bend radius, hook length, clear cover, lap splice locations, lap splice length, field bends & couplers. Bars should be clean & free of mud & excessive rust & must have proper concrete coverage. Weldability of steel reinforcing bar other than ASTM A706 shall be determined where required.
2. Concrete Placement - The special inspector shall be present during concrete placement operations. Items to be checked include that the proper mix design is supplied, excess water is not added at site & concrete or contractors placing the concrete do not displace reinforcement, post-tension strands or embedded items. Additional items include manner of placement, consolidation by mechanical vibration, prevention of cold joints, proper location & configuration of vertical construction joints & proper curing procedures for cold or hot weather concreting. At the time samples are taken for compression tests, concrete slump, air content & temperature shall be determined & noted.
3. Embedded Items - Special inspection shall be done on a continuous basis for anchor bolts, studs & embed plates. Items to be checked are proper anchor diameters, embedment lengths, spacing between anchors, edge distances, embed plate locations, concrete consolidation around anchors, & securing of embedded items against the hydraulic forces from concrete placement.
Foundation:
1. Bearing strata & Geopiers - Special inspection shall be provided per the recommendations of the Geotechnical Engineer and/or Geopier Specialty Engineer.
2. Footings/Mats & Reinforcing - Refer to the "Concrete" special inspection section for requirements.
CORNER BARS TO MATCH
HORIZ. REINF., TYP.
STANDARD
HOOK
CLASS "B" SPLICE
TYPICAL DETAIL
GRADE BEAM INTERSECTIONS
3/4" = 1'-0"
TYPICAL SECTION
SHELTER PAD
3/4" = 1'-0"
6"
6"
6"
RE: PLAN
#5 @ 16" o.c. EA. WAY, MID DEPTH OF SLAB w/ STD 90o
HOOK TURNDOWN EA END
(2) #5 CONT. @ BOT.
(2) #5 CONT. BARS @ TOP
3"
CLR
(2) #5 VERTS, (1) EA. FACE OF WALL,
SPACED TO MATCH SLAB REINF. w/ STD 90o HOOK @ TOP
3'- 0"
M
IN
. F
RO
ST
C
OV
ER
RE
: G
EN
ER
AL
N
OT
ES
3" C
LR
VA
RI
ES
(F
.V
RE: 3/THIS SHEET FOR ADD'L
GRADE BEAM REINF. REQ'M.
6" THICK SLAB ON GRADE w/
FROST-DEPTH TURN DOWN
EDGES, RE: 2/THIS SHEET
SHELTER SHALL BE PLACED
AT CENTER OF SLAB
FOOTPRINT, PROVIDING 6" OF
CLEARANCE EA. SIDE
12'-10"
'-0
6" C
LR
TY
P.
S1.1
1/4" = 1'-0"
FOUNDATION PLAN
NOTES:
2'- 4"
2'- 4"
2'-4" 2'-4"
6" C
LR
TY
P.
ANCHOR ENGINEERING, Inc.
PROFESSIONAL ENGINEER
Denver, CO 80211
DRAWN BY-
DESIGNED BY-
2535 17th Street
REVIEWED BY-
FAX (303) 830-9133
PHONE (303) 783-4797
JOB NO.:
TATE B. ELSHOF
JAR
CRM
TBE
260310
UNLESS SPECIFICALLY DETAILED &/OR SPECIFIED ON THE STRUCTURAL CONTRACT DOCUMENTS, SECONDARY ELEMENTS INCLUDING BUT NOT LIMITED TO STEEL TO STEEL CONNECTIONS, GLAZING, STAIRS, BALUSTERS, HALF-WALLS, AWNINGS, SUN SHADES, SITE ELEMENTS, FENCES, RETAINING WALLS, DETENTION VAULTS OR PONDS, & RAILINGS FOR DECKS, BALCONIES, & WALKWAYS HAVE NOT BEEN
DESIGNED BY ANCHOR ENGINEERING, INC. DESIGN & CONSTRUCTION OF THESE ELEMENTS, AND THE
ASSOCIATED ATTACHMENTS TO THE PRIMARY STRUCTURE, WHEN NOT EXPRESSLY SHOWN ON THE
STRUCTURAL CONTRACT DOCUMENTS, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THESE ELEMENTS ARE CONSIDERED DESIGN-BUILD & THE GENERAL CONTRACTOR SHALL SUBMIT PLANS &
CALCULATIONS FOR THE SECONDARY ELEMENTS AS WELL AS THEIR ATTACHMENTS, SEALED & SIGNED BY A
PROFESSIONAL ENGINEER LICENSED IN THE STATE WHERE THE WORK IS BEING PERFORMED.
SHEET TITLE
SHEET
REVISED:
CHECKED
DRAWN BY
DATE
PROJECT NO.
c COPYRIGHT 2026, DESIGN EDGE, P.C. ALL
RIGHTS RESERVED. ANY COPYING OR OTHER
REPRODUCTION OF THESE DRAWINGS WITHOUT
THE PRIOR WRITTEN AUTHORIZATION OF
DESIGN EDGE, P.C. CONSTITUTES A VIOLATION
OF COPYRIGHT LAW AND WILL BE SUBJECT TO
LEGAL ACTION.
482 S Broadway, Suite 100 Denver, Colorado 80209
303-260-7277 www.de-arch.com
260310
CR
TBE
AT
O
Ps S
B M
T G
O
AT
SI
TE
D
EV
EL
O
PM
EN
T C
O M
M
ER
C E
C
IT
Y
PU
EB
LO
, C
O
LO
R
AD
O
PR
O J.
N U
M
BE
R ; C
T
*3
6/26/2026
100% Construction Documents
6/26/2026
S1.1
SHELTER PAD
TateElshof
COLO PE STAMP_TBE
TateElshof Typewritten Text 06/26/2026
SYMBOL DESCRIPTION
LINETYPES and LINEWEIGHTS
NOTES and TAGS
CIRCUITING POWER SYMBOLS
ABBREVIATIONS
ELECTRICAL SYMBOLS LEGEND
ALL SYMBOLS INDICATED IN THE LEGEND MAY NOT NECESSARILY BE USED ON PLANS.
CIRCUITING DESIGNATION -
OPEN 277/480V., SOLID 120/208V.
CIRCUITING - RUN CONCEALED IN WALL
OR CEILING
CIRCUITING - RUN CONCEALED IN FLOOR
OR GRADE
CONDUIT RISER - TURNED UP, TURNED
DOWN
CIRCUITING - CONTINUED AS DESIGNATED
CIRCUITING - END CAP
GRADE - LARGER DASHED AND BOLD
NEW CIRCUITING - UNDER FLOOR OR
NEW CIRCUITING - CONTINUOUS AND BOLD
EXISTING CIRCUITING - CONTINUOUS AND
THIN
DEMOLITION CIRCUITING - LARGER
DASHED AND THIN
NEW AND RELOCATED DEVICES AND
FIXTURES - CONTINUOUS AND BOLD
EXISTING DEVICES AND FIXTURES
- CONTINUOUS AND THIN
- SMALLER DASHED AND THIN
DEMOLITION DEVICES AND FIXTURES
REVISION DELTA
DRAWING NOTE
MECHANICAL EQUIPMENT
KITCHEN EQUIPMENT
TELECOMMUNICATION SYMBOLS
JUNCTION BOX; J-BOX WITH BLANK COVER
SIMPLEX RECEPTACLE
DUPLEX RECEPTACLE
HALF SWITCHED DUPLEX RECEPTACLE
DEDICATED DUPLEX RECEPTACLE
CEILING MOUNTED DUPLEX RECEPTACLE
CLG. MOUNTED FOURPLEX RECEPTACLE
FOURPLEX RECEPTACLE
DEDICATED FOURPLEX RECEPTACLE
SPECIAL RECEPTACLE - SEE DRAWING NOTES
FLOOR MOUNTED POWER FLOOR BOX DEVICE
FLOOR COMBINATION PWR/DATA FLOOR BOX
NON FUSED DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
VARIABLE FREQUENCY DRIVE
MOTOR
ONE, TWO, and THREE BUTTON PUSH SWITCH
POWER POLE
TIME CLOCK
CONTACTOR
METER
PANEL BOARD
CLOCK
PULLBOX
CURRENT TRANSFORMER
TRANSFORMER
DESCRIPTIONSYMBOL
SWITCHES
SWITCH, SINGLE POLE
SWITCH, DOUBLE POLE
SWITCH, THREE WAY
SWITCH, FOUR WAY
SWITCH, DIMMER
SWITCH, KEYED
SWITCH, WITH PILOT LIGHT
SWITCH, THERMAL OVERLOAD
SWITCH, VARIABLE SPEED CONTROL
SWITCH, WITH TYPE S FUSE HOLDER
(INCLUDE FUSE)
CEILING MOUNTED FIRE HORN/STROBE
SYMBOL DESCRIPTION
FIRE ALARM SYMBOLS
CEILING MOUNTED STROBE
CEILING MOUNTED FIRE SPEAKER
REMOTE INDICATOR LAMP
MANUAL PULL STATION
FLOW SWITCHFS
TS TAMPER SWITCH
WALL MOUNTED STROBE
WALL MOUNTED FIRE HORN
WALL MOUNTED FIRE HORN/STROBE
MAGNETIC DOOR HOLD OPEN
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR PANEL
DUCT DETECTOR
FIRE SMOKE DAMPER
HEAT DETECTOR
SMOKE DETECTOR
FIREFIGHTER'S PHONE JACK / WALL PHONE
MISCELLANEOUS SYMBOLS
CARD READER, DOUBLE GANG BOX,
REMOTE TEST SWITCH
MUSIC OR PAGING SPEAKER, DOUBLE GANG,
EPO
BELL
SECURITY CAMERA, DOUBLE GANG BOX,
TRANSFORMER
NON-FUSED DISCONNECT
FUSED DISCONNECT SWITCH
PULL BOX
CURRENT TRANSFORMER
ONE LINE DIAGRAM SYMBOLS
DESCRIPTIONSYMBOL
PANEL BOARD
PAD MOUNTED
TRANSFORMER
TRANSFER SWITCH
TRANSFORMER BANK
OVERHEAD POLE MOUNTED
GENERATOR
METER
DESCRIPTIONSYMBOL
FUSED DISCONNECT SWITCH
WITHIN SWITCHBOARD
WITHIN SWITCHBOARD
SPARE SWITCH
SPACE WITHIN SWITCHBOARD
CIRCUIT BREAKER
SERVICE WEATHER HEAD
CURRENT TRANSFORMER
GROUNDING CONNECTION
MOTOR
SWITCH
FLOOR DATA OUTLET - SEE DRAWING NOTES
1" CONDUIT STUB TO ACCESSIBLE CEILING
DATA OUTLET, DOUBLE GANG BOX,
1" CONDUIT STUB TO ACCESSIBLE CEILING
TELEPHONE/DATA OUTLET, DOUBLE GANG BOX,
1" CONDUIT STUB TO ACCESSIBLE CEILING
TELEPHONE OUTLET, DOUBLE GANG BOX,
FLOOR TELEPHONE/DATA OUTLET - SEE
CABLE TV OUTLET, DOUBLE GANG BOX,
WALL SECURITY MOTION SENSOR,DOUBLE GANG,
CLG. SECURITY MOTION SENSOR, DOUBLE GANG,
FF
INTERCOM PUSH BUTTON, DOUBLE GANG BOX
MICROPHONE JACK
COMBINATION CLOCK/SPEAKER BOX
PS PRESSURE SWITCH
ENCLOSURE
SWITCH, LOW VOLTAGE - SEE DRAWING NOTES
3/4" CONDUIT STUB TO ACCESSIBLE CEILING
3/4" CONDUIT STUB TO ACCESSIBLE CEILING
1/2" CONDUIT STUB TO ACCESSIBLE CEILING
1/2" CONDUIT STUB TO ACCESSIBLE CEILING
3/4" CONDUIT STUB TO ACCESSIBLE CEILING
TWO-WAY COMMUNICATION STATION
1" CONDUIT STUB TO ACCESSIBLE CEILING
LIGHTING CONTROL NOTE
DRAWING NOTES
GROUND BAR
COMBINATION DUPLEX RECEPT / USB OUTLETUSB
FIRE ALARM GRAPHIC MAP
PHOTOCELL
1/2" CONDUIT STUB TO ACCESSIBLE CEILING
THERMOSTAT, LINE VOLTAGE
GB GROUND BAR
LTG SCENE CONTROLLER-SEE DRAWING NOTES
PA
1/2" CONDUIT STUB TO ACCESSIBLE CEILING
EMERGENCY POWER OFF PUSH BUTTON
DOOR BUZZER
1/2" CONDUIT STUB TO ACCESSIBLE CEILING
DOOR CONTACT, - SEE DRAWING NOTES
1/2" CONDUIT STUB TO ACCESSIBLE CEILING
LIGHTING CONTROL SENSORS
a,b
D
WALL VACANCY SENSOR, DUAL TECH,
SINGLE ZONE, INTEGRAL OVERRIDE SWITCH
WALL VACANCY SENSOR, DUAL TECH,
SINGLE ZONE, INTEGRAL OVR SWITCH, DIMMING
WALL VACANCY SENSOR, DUAL TECH,
DUAL ZONE, INTEGRAL OVERRIDE SWITCH,
a,b
CEILING VACANCY SENSOR, DUAL TECH,
SINGLE ZONE, POWER PACK;
CEILING VACANCY SENSOR, DUAL TECH,
DUAL ZONE, 2P POWER PACK;
LV OVERRIDE SWITCHES
LV OVERRIDE SWITCHES
WP CEILING VACANCY SENSOR, SINGLE ZONE,
EXTERIOR RATED, EXTENDED RANGE, PIR
INTERIOR DAYLIGHT SENSOR
A,AMP AMPERE
AC ABOVE COUNTER
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AL ALUMINUM
BLDG BUILDING
C CONDUIT
CB CIRCUIT BREAKER
CCTV CLOSED CIRCUIT TELEVISION
CT CURRENT TRANSFORMER
CU COPPER
CLG CEILING (CEILING MOUNTED)
CWP COLD WATER PIPE
(D) EXISTING TO BE DEMOLISHED
Db DECIBEL
(E) EXISTING TO REMAIN
EC ELECTRICAL CONTRACTOR
EPO EMERGENCY POWER OFF
EM EMERGENCY POWER CIRCUIT
FA FIRE ALARM
FC FOOTCANDLES
GC GENERAL CONTRACTOR
GD GARBAGE DISPOSAL
GFCI GROUND FAULT CIRCUIT INTERRUPTER
G,GND GROUND
HP HORSEPOWER
IG ISOLATED GROUND DEVICE
LV LOW VOLTAGE
MC MECHANICAL CONTRACTOR
MCB MAIN CIRCUIT BREAKER
MFR MANUFACTURER
MLO MAIN LUGS ONLY
MV MEDIUM VOLTAGE
MW MICROWAVE
(N) NEW
N NEUTRAL
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
NEC NATIONAL ELECTRIC CODE
NF NON FUSED
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NTS NOT TO SCALE
(PART) PARTIAL CIRCUIT
REF REFRIGERATOR
(RL) EXISTING TO BE RELOCATED
RTS REMOTE TEST SWITCH
TBB TELEPHONE PLYWOOD BACKBOARD
UC UNDER COUNTER
UG UNDER GROUND
WP WEATHERPROOF - NEMA 3R
XP EXPLOSION PROOF
DC
B
S
T
P
S
MIC
AI
M
B
M
S
RTS
CR
M
B P
TC
FT
H S
PANEL
"LA"
T C
B P
FRN-R
100A
100/3
100/3
F T
T F
FRN-R
100A
100/3
SPARE
100/3
SPACE
100/3
M
G
M
APPLICABLE CODE STANDARDS
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FUEL GAS CODE
2023 NATIONAL ELECTRIC CODE
LV
CS
F
MAP
ANN
FACP
DH
F
F
F
F
SC
SU
V
TO
P
K D
GB
C
TC
PP
M
VFD
CJ
D
OS
a,b
VS
VS
VS
VS
VS
(NEW) XCEL ENERGY PAD MOUNT
TRANSFORMER 50 KVA,
120/240, 1PH, 3W
T F
M
LPJ
200A
200/3
G N
GND GND
ROD
(#4 CU GND)
(NEW)
XCEL ENERGY
METER
Isc#1 - X
Isc#2 - X
GRADE LEVEL
COLORADO ANALYTIC SYSTEMS
PRE-FABRICATED BUILDING
200/2
EXTERIOR ENCLOSED CIRCUIT
BREAKER PROVIDED WITH
BUILDING
PANEL
LC-1
PREWIRED 200A LOAD CENTER
PROVIDED WITH BUILDING.
(3-#3/0 CU)2" PVC.
(3-#3/0 CU, 1-#4 CU SSBJ)2" GRC.
PROVIDE METER DISCONNECT
PEDESTAL OR UNISTRUT RACK
FOR MOUNTING.
ROD
(3-#3/0 CU, 1-#6 CU GND)2" PVC.
NONESCALE:
ELECTRICAL ONE-LINE DIAGRAM - BIRCH STREET
DRAWING NOTES
1. AIR MONITORING STATION NAMEPLATE RATING 200A, 120/240V, 1P, 3W, 10,000 AIC.
2. SQUARD D, TYPE QO, MAIN BREAKER AND BRANCH CIRCUIT BREAKERS SERIES RATE WITH 200A LPJ
FUSES TO 200K AIC. REFER TO SERIES RATING CHART THIS SHEET.
3. PROVIDE NEW GROUND AT PANELBOARD.
NEMA 3R
NEMA 3R
SERVICE
DISCONNECT
NEMA 3R
LPJ
200A
200/3
METER
DISCONNECT PER
NEC 230.82,
NEMA 3R
Isc#3 X
Isc#4 X
Isc#5 - X
2 2
G
GND
ROD
(#4 CU GND)
SHEET TITLE
SHEET
REVISED:
CHECKED
DRAWN BY
DATE
PROJECT NO.
c COPYRIGHT 2026, DESIGN EDGE, P.C. ALL
RIGHTS RESERVED. ANY COPYING OR OTHER
REPRODUCTION OF THESE DRAWINGS WITHOUT
THE PRIOR WRITTEN AUTHORIZATION OF
DESIGN EDGE, P.C. CONSTITUTES A VIOLATION
OF COPYRIGHT LAW AND WILL BE SUBJECT TO
LEGAL ACTION.
482 S Broadway, Suite 100 Denver, Colorado 80209
303-260-7277 www.de-arch.com
26056
CMM
RCC
AT
O
Ps S
B M
T G
O
AT
SI
TE
D
EV
EL
O
PM
EN
T C
O M
M
ER
C E
C
IT
Y
PU
EB
LO
, C
O
LO
R
AD
O
PR
O J.
N U
M
BE
R ; C
T
*3
6/5/2026
90% Submittal 6/5/2026 100% Construction Docs 6/29/2026
ONE-LINE DIAGRAM
ELECTRICAL LEGEND &
E0.1
06.29.26
260100 - BASIC ELECTRICAL REQUIREMENTS - GENERAL
1. THE GENERAL CONDITIONS OF THE CONTRACT, SUPPLEMENTARY CONDITIONS OF THE GENERAL CONTRACT, AND REQUIREMENTS OF OTHER DIVISIONS APPLY TO WORK UNDER THIS DIVISION. PROVIDE LABOR, MATERIALS, REQUIRED, WHICH INCLUDES BUT IS NOT LIMITED TO, MASONRY, EXCAVATION AND BACKFILL, CONCRETE, CARPENTRY, AND PATCHING, AND SIMILAR WORK. PROVIDE TEMPORARY ELECTRICITY FOR ELECTRICAL WORK AND THE WORK OF OTHER TRADES.
2. THE MANUFACTURER'S MATERIAL OR EQUIPMENT LISTED FIRST IN THE SPECIFICATIONS OR ON THE DRAWINGS ARE TYPES TO BE PROVIDED FOR ESTABLISHMENT OF SIZE, CAPACITY, GRADE AND QUALITY. ADDITIONAL MANUFACTURERS MATERIALS OR EQUIPMENT LISTED ARE CONSIDERED TO BE "OTHER ACCEPTABLE" MANUFACTURERS, AND THE COST OF CHANGES IN CONSTRUCTION REQUIRED BY THEIR USE SHALL BE BORNE BY THIS CONTRACTOR.
3. IT IS THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS TO RESULT IN A COMPLETE ELECTRICAL INSTALLATION IN COMPLETE ACCORDANCE WITH
APPLICABLE CODES AND ORDINANCES.
4. NEITHER THE PROFESSIONAL ACTIVITIES OF THE ENGINEER NOR THE PRESENCE OF THE ENGINEER OR ITS EMPLOYEES AND SUBCONSULTANTS AT A CONSTRUCTION/PROJECT SITE SHALL RELIEVE THE CONTRACTOR OF ITS OBLIGATIONS, DUTIES, AND RESPONSIBILITIES INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION MEANS, METHODS, SEQUENCE, TECHNIQUES, OR PROCEDURES NECESSARY FOR PERFORMING, SUPERINTENDING, AND COORDINATING THE
WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
5. DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE EVERY REQUIRED JUNCTION BOX, PULL BOX, ELL, ETC. ITEMS NOT SPECIFICALLY MENTIONED IN THE SPECIFICATION OR NOTED ON THE DRAWINGS, BUT WHICH ARE NECESSARY TO MAKE A COMPLETE WORKING INSTALLATION, SHALL BE INCLUDED.
6. DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY. WHATEVER IS CALLED FOR IN EITHER IS BINDING AS THOUGH CALLED FOR IN BOTH. THE MORE
STRINGENT REQUIREMENTS SHALL GOVERN.
7. DRAWINGS SHALL NOT BE SCALED FOR ROUGH-IN MEASUREMENTS OR USED AS SUBMITTALS. WHERE DRAWINGS ARE REQUIRED FOR THESE PURPOSES OR HAVE TO BE MADE FROM FIELD MEASUREMENTS, TAKE THE NECESSARY MEASUREMENTS AND PREPARE THE DRAWINGS.
8. PRIOR TO ORDERING EQUIPMENT, DETERMINE THAT EQUIPMENT SHALL ADEQUATELY PASS THROUGH BUILDING OPENING AND PASSAGE WAYS PROVIDING UNOBSTRUCTED ACCESS TO FINAL EQUIPMENT LOCATION. EQUIPMENT SHALL BE MANUFACTURED AND SHIPPED IN SECTIONS FOR ASSEMBLY IN FINAL EQUIPMENT LOCATION WHEN INADEQUATE BUILDING OPENINGS AND PASSAGE WAYS LIMIT ACCESS. SUBMITTALS SHALL INDICATE SECTIONALIZED
MANUFACTURE OF EQUIPMENT.
9. BEFORE ORDERING EQUIPMENT AND BEFORE WORK IS INSTALLED, DETERMINE THAT EQUIPMENT SHALL PROPERLY FIT THE SPACE; THAT REQUIRED CLEARANCES CAN BE MAINTAINED AND THAT ELECTRICAL EQUIPMENT CAN BE LOCATED WITHOUT INTERFERENCES BETWEEN SYSTEMS, WITH STRUCTURAL
ELEMENTS OR WITH THE WORK OF OTHER TRADES.
10. IF CONFLICTS ARE DISCOVERED IN CONTRACT DOCUMENTS AS WORK PROGRESSES, A SET OF PDF'S MARKED UP IN RED TEXT AND AND SYMBOLS SHOWING RECOMMENDED MODIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION.
11. THE DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF CIRCUITS AND OUTLETS, LOCATIONS OF SWITCHES, PANELBOARDS AND OTHER WORK. HOWEVER, REARRANGEMENT AND RECIRCUITING SHALL NOT BE PERMITTED WITHOUT SPECIFIC ACCEPTANCE.
12. INCIDENTAL EQUIPMENT SUCH AS TOOLS, SCAFFOLDING, CONSUMABLE ITEMS, TESTING EQUIPMENT, APPLIANCES AND THE LIKE SHALL BE PROVIDED WHETHER LISTED OR NOT. LABOR, FEES, LICENSES, START-UP AND CHECKOUT SERVICES SHALL ALSO BE PROVIDED.
13. INSTRUCTIONS SUCH AS "PROVIDE THE OUTLETS..." SHALL MEAN THE SAME AS THOUGH THE WORDS "THIS CONTRACTOR SHALL" PRECEDED EACH INSTRUCTION.
"PROVIDE" SHALL MEAN "FURNISH AND INSTALL." WHERE THE WORDS "ACCEPTED" OR "ACCEPTABLE" ARE USED, SUCH "ACCEPTED" OR "ACCEPTABLE" ACTION BY THE ARCHITECT DENOTES THAT THE WORK OR EQUIPMENT ITEM IS IN CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND, IN GENERAL, COMPLIES WITH THE PERTINENT INFORMATION GIVEN IN THE CONTRACT DOCUMENTS.
14. IN THE EVENT THAT DISCREPANCIES EXIST OR REQUIRED ITEMS OR DETAILS HAVE BEEN OMITTED, NOTIFY THE ARCHITECT IN WRITING OF SUCH DISCREPANCY OR OMISSION AT LEAST FIVE DAYS PRIOR TO BID DATE. FAILURE TO DO SO SHALL BE CONSTRUED AS WILLINGNESS TO SUPPLY NECESSARY MATERIALS AND LABOR REQUIRED FOR THE PROPER COMPLETION OF THIS WORK. FOR DISCREPANCIES WHICH ARE NOT REPORTED BY CONTRACTOR THE MOST STRINGENT
REQUIREMENT SHALL APPLY.
15. IN THE EVENT THAT ADDITIONAL INFORMATION IS REQUIRED DURING CONSTRUCTION, REQUEST SUCH INFORMATION FROM THE ARCHITECT IN WRITING PRIOR TO PERFORMING RELATED WORK. THE REQUEST FOR INFORMATION SHALL INCLUDE AN EXPLANATION OF THE INFORMATION REQUIRED INCLUDING REFERENCES TO RELATED PORTIONS OF THE DOCUMENTS AND CONTRACTOR'S RECOMMENDATIONS.
16. EXAMINE THE PREMISES AND BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO BIDDING. NO ALLOWANCE SHALL SUBSEQUENTLY BE MADE FOR NOT
FOLLOWING THIS PROCEDURE.
17. PROTECT WORK, MATERIALS, AND EQUIPMENT AGAINST THEFT, INJURY, OR DAMAGE UNTIL IT HAS BEEN INSTALLED, TESTED, AND ACCEPTED.
18. BE RESPONSIBLE FOR DAMAGE TO THE PROPERTY OF THE OWNER OR TO THE WORK OF OTHER TRADES DUE TO THE ELECTRICAL WORK DURING THE
CONSTRUCTION AND WARRANTY PERIOD.
19. ERRORS AND OMISSIONS IN THE CONTRACT DOCUMENTS DO NOT RELIEVE THE CONTRACTOR FROM PROVIDING THE WORK IN ACCORDANCE WITH REGULATORY
REQUIREMENTS.
20. EXECUTE AND INSPECT WORK IN ACCORDANCE WITH UNDERWRITERS, LOCAL AND STATE CODES, RULES AND REGULATIONS APPLICABLE TO THE TRADE AFFECTED AS A MINIMUM, BUT IF THE PLANS OR SPECIFICATIONS CALL FOR REQUIREMENTS THAT EXCEED THESE RULES AND REGULATIONS, THE GREATER REQUIREMENT SHALL BE FOLLOWED. FOLLOW REQUIREMENTS OF IBC, IMC, IFC, IECC, NFPA, NEC, OSHA, NEMA, ANSI, UL, EIA/TIA, AND APPLICABLE STATE, LOCAL OR FEDERAL SPECIFICATIONS.
21. CONFORM TO GUIDELINES AND REQUIREMENTS OF LOCAL UTILITY COMPANIES. COORDINATE CT, PT, AND METERING REQUIREMENTS WITH SERVING UTILITY.
COORDINATE WITH OWNER AND SUBMIT SERVICE APPLICATIONS AND ANY REQUIRED EXCEPTION FORMS. OBTAIN APPROVAL LETTERS FOR EXCEPTIONS PRIOR
TO PURCHASING EQUIPMENT. COORDINATE WITH ENGINEER.
22. OBTAIN PERMITS REQUIRED FOR THE ELECTRICAL WORK ON THIS PROJECT. PAY FEES, INCLUDING SERVICE INSTALLATION AND CONNECTION CHARGES, PERMIT FEES. NO WORK SHALL BE STARTED PRIOR TO OBTAINING NECESSARY PERMITS AND PAYMENT OF REQUIRED FEES. WORK INSTALLED PRIOR TO OBTAINING PROPER PERMITS SHALL, IF REQUIRED BY PERMITTING AUTHORITY, BE REDONE IN COMPLIANCE WITH REQUIREMENTS. NOTATIONS MADE ON PERMIT OR REVIEW DOCUMENTS SHALL BE OBSERVED. ADDITIONAL REQUIREMENTS NOTED BY JURISDICTIONAL AUTHORITY SHALL BE MADE PART OF THE REQUIREMENTS FOR CONSTRUCTION OF THE PROJECT. ADDITIONAL COSTS FOR IMPLEMENTING JURISDICTIONAL AUTHORITY'S REQUIREMENTS, IF ANY, SHALL BE SUBMITTED
TO THE ARCHITECT PRIOR TO CONSTRUCTION FOR REVIEW.
23. SUBSTITUTIONS.
A. MATERIAL AND EQUIPMENT USED IN BIDS SHALL BE AS SPECIFIED. PROPOSED SUBSTITUTIONS SHALL BE REVIEWED AFTER AWARD OF CONTRACT DURING
SUBMITTAL REVIEW. PROPOSED SUBSTITUTES SHALL BE CLEARLY LABELED AS A SUBSTITUTE. SUBMITTALS SHALL INCLUDE DATA NECESSARY FOR COMPLETE EVALUATION OF THE PROPOSED SUBSTITUTION. SUBSTITUTION MATERIALS AND EQUIPMENT USED IN BIDS SHALL BE AT CONTRACTOR'S RISK, AND AS SUCH ARE SUBJECT TO REJECTION DURING SUBMITTAL REVIEW. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FEES FOR RE-DESIGN INCURRED BY THE ENGINEER RESULTING FROMTHE USE OF SUBSTITUTION MATERIALS. SUCH EXTRA FEES SHALL BE DEDUCTED FROM PAYMENT TO THE
CONTRACTOR.
B. WHERE "OTHER ACCEPTABLE" MANUFACTURERS ARE NAMED, THEIR PRODUCTS MAY BE USED PROVIDED THEY TOTALLY MEET THE SPECIFICATIONS AND ARE DIMENSIONALLY SUITABLE AND OPERATIONALLY IDENTICAL TO THE SPECIFIED ITEM. THE DECISION AS TO WHETHER OR NOT SUCH ITEMS ARE EQUAL
TO THE SPECIFIED ITEMS SHALL BE MADE BY THE ARCHITECT DURING SUBMITTAL REVIEW.
25. SUBMITTALS
A. THE PURPOSE OF SUBMITTALS IS TO ENSURE THAT CONTRACTOR UNDERSTANDS DESIGN REQUIREMENTS AND DEMONSTRATES UNDERSTANDING BY
INDICATING AND DETAILING INTENDED MATERIALS, METHODS, AND PROPER INSTALLATION PRACTICES. IF DISCREPANCIES BETWEEN SUBMITTALS AND CONTRACT DOCUMENTS ARE DISCOVERED EITHER PRIOR TO OR AFTER SUBMITTALS ARE REVIEWED, REQUIREMENTS OF CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. SUBMITTALS WHICH ARE SUBMITTED, BUT WHICH ARE NOT REQUIRED BY CONTRACT DOCUMENTS, SHALL BE RETURNED NOT
REVIEWED.
B. REVIEW OF SUBMITTALS AND ACTION RECOMMENDED AS RESULT OF REVIEW IS A COURTESY EXTENDED TO CONTRACTOR BY ENGINEER. THIS REVIEW IS INTENDED TO MINIMIZE DELIVERY TO JOB SITE AND INSTALLATION OF MATERIALS AND EQUIPMENT THAT DO NOT MEET INTENT OF CONSTRUCTION DOCUMENTS. SUBMISSION OF MATERIAL FOR REVIEW DOES NOT ALTER CONTRACTOR'S OBLIGATION TO FOLLOW INTENT OF CONSTRUCTION DOCUMENTS, NOR CONTRACTOR'S RESPONSIBILITY TO COMPLY THEREWITH REGARDLESS OF ACTION NOTED IN ENGINEERS REVIEW.
C. PRODUCT DATA SUBMITTALS SHALL INCLUDE CATALOG CUT-SHEETS, MANUFACTURER'S DATA SHEETS, WRITTEN DESCRIPTIONS, SPECIFICATION SHEETS DETAILING THE ASSOCIATED PRODUCT, ITEM, ASSEMBLY AND INSTALLATION. HIGHLIGHT CHARACTERISTICS AND FEATURES WITHIN PRODUCT DATA SUBMITTALS WITH A YELLOW HIGHLIGHTING MARKER TO IDENTIFY COMPLIANCE WITH THE DRAWINGS AND SPECIFICATIONS. INDICATE CHARACTERISTICS AND FEATURES WHICH ARE MISSING OR VARY FROM THE DRAWINGS AND SPECIFICATIONS. SUBMITTALS SHALL INCLUDE DETAILS, INSTALLATION DRAWINGS, ASSEMBLY DRAWINGS, FABRICATION DRAWINGS, DIAGRAMS, ETC., WHICH SHOW ADAPTATION OR INSTALLATION OF CONTRACTOR-FURNISHED PRODUCTS
OR MATERIALS FOR OVERALL PROJECT.
D. PRIOR TO ORDERING EQUIPMENT OR BEGINNING INSTALLATION WORK, ASSEMBLE, PREPARE, AND SUBMIT SHOP DRAWINGS REQUIRED FOR PROJECT.
SUBMIT SUBMITTALS AS REQUIRED BY INDIVIDUAL SECTIONS OF SPECIFICATIONS. AS A MINIMUM, PROVIDE PRODUCT DATA SUBMITTALS FOR EQUIPMENT
INDICATED ON THE DRAWINGS WHETHER MENTIONED IN THESE SPECIFICATIONS OR NOT.
E. CONTRACTOR SHALL THOROUGHLY CHECK SUBCONTRACTORS' OR VENDORS' SUBMITTALS AND, AFTER APPROVING SUBMITTALS, PROVIDE SUBMITTALS FOR REVIEW. PARTIAL OR INCOMPLETE SUBMITTALS WILL NOT BE REVIEWED BY THE ARCHITECT AND WILL BE RETURNED NOT REVIEWED. SUBMITTALS THAT
DO NOT BEAR CONTRACTOR'S REVIEW STAMP SHALL BE RETURNED NOT REVIEWED.
F. EACH SET OF SUBMITTALS SUBMITTED OR RE-SUBMITTED SHALL BEAR A UNIQUE CONTRACTOR'S SUBMITTAL NUMBER. AFTER REVIEW, SUBMITTALS SHALL BE RETURNED TOGETHER WITH SUBMITTAL REVIEW SHEET WHICH INDICATES COMMENTS ON SUBMITTALS WITH SPECIFIC ACTIONS SUCH AS: NO EXCEPTION TAKEN; MAKE CORRECTIONS NOTED, RE-SUBMITTAL NOT REQUIRED; MAKE CORRECTIONS NOTED, RE-SUBMITTAL REQUIRED; REJECTED; NOT REVIEWED.
CONTINUE TO RE-SUBMIT SUBMITTALS UNTIL NO EXCEPTION TAKEN OR MAKE CORRECTIONS NOTED, RE-SUBMITTAL NOT REQUIRED ACTION IS INDICATED.
PROVIDE A COPY OF THE ORIGINAL SUBMITTAL REVIEW COMMENTS FOR RESUBMITTED ITEMS.
G. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXTRA FEES INCURRED BY THE ENGINEER RESULTING FROM SUBSEQUENT REVIEW(S) OF SUBMITTALS WHICH FAIL TO MEET THE REQUIREMENTS HEREIN. SUCH EXTRA FEES SHALL BE DEDUCTED FROM PAYMENT TO THE CONTRACTOR.
26. KEEP IN CUSTODY DURING ENTIRE PERIOD OF CONSTRUCTION, A CURRENT SET OF DOCUMENTS INDICATING CHANGES THAT HAVE BEEN MADE TO THE CONTRACT DOCUMENTS. CHANGES TO BE NOTED ON THE DOCUMENTS SHALL INCLUDE BUT SHALL NOT BE LIMITED TO, PANELBOARD, LUMINAIRE, EQUIPMENT, AND OTHER SCHEDULES; CIRCUITING; EQUIPMENT, LUMINAIRES, OR CONDUIT LOCATED MORE THAT 2 FEET (0.61 METERS) FROM WHERE SHOWN ON DRAWINGS;
ELECTRICAL EQUIPMENT RATINGS; MODIFICATIONS TO SPECIFICATIONS. INCORPORATE ADDENDA, ACCEPTED LTERNATES, CHANGE ORDERS, AND OTHER DOCUMENT REVISIONS WHICH OCCURRED AFTER THE AWARD OF THE GENERAL CONTRACT OR THE START OF CONSTRUCTION ACTIVITIES INTO THE RECORD DOCUMENTS. NOTATIONS AND CHANGES SHALL BE DONE IN A NEAT AND LEGIBLE MANNER. UPON COMPLETION OF WORK, SUBMIT THE COMPLETE SET OF
RECORD DOCUMENTS TO THE ARCHITECT.
27. PROTECT MATERIALS AND EQUIPMENT FROM PHYSICAL DAMAGE, CONSTRUCTION DIRT, AND THE ELEMENTS FROM THE TIME THEY ARE DELIVERED UNTIL FINAL ACCEPTANCE. THE CONTRACTOR INSTALLING THE EQUIPMENT OR MATERIALS SHALL BE RESPONSIBLE FOR THEIR PROTECTION.
28. SCHEDULE WORK TO COORDINATE WITH THAT OF OTHER TRADES TO MINIMIZE DELAYS. COORDINATE WITH OWNER AND UTILITY COMPANIES OUTAGES DUE TO INTERFACING ELECTRICAL EQUIPMENT. OUTAGES MUST BE SCHEDULED AT LEAST FIVE DAYS IN ADVANCE AND SHALL BE AT A TIME AND DURATION ACCEPTABLE TO THE OWNER. OUTAGES AT A TIME OTHER THAN NORMAL WORKING HOURS, SHALL NOT ENTITLE THE CONTRACTOR TO ADDITIONAL OVERTIME OR
COMPENSATION BEYOND THAT IN THE BID.
29. LOCATIONS OF DEVICES, OUTLETS, ETC., AS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .