Attachment 2a SBP-6.133 Unit Pricing.docx
DOCX document 36 KB Posted
- Attached to
- MT GOAT Site Construction Project
- Solicitation number
- IFB1 FAAA 2027000006 1
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Unit Pricing Form from the State of Colorado Office of the State Architect State Buildings Program for the MT GOAT Site Construction Project, a capital improvement initiative under the Colorado Department of Public Health and Environment (Project No. 793). The form establishes the framework for unit pricing adjustments to the contract sum should changes in the scope of work become necessary during project execution. Nine line items (U1 through U9) are provided for bidders to enter unit prices for specific work items, though the individual descriptions and units of measure are not detailed in the submitted document. All unit prices remain valid through the contract completion date established on the Notice to Proceed and must include the pro-rata share of all material, equipment, and disposal costs required to complete each work item.
Overhead, profit, and bonding fees associated with unit price changes are calculated separately through a Change Order Proposal form (SC-6.312) rather than incorporated into the unit prices themselves. This separation allows for transparent cost accounting on future modifications to the original contract scope. Bidders are required to sign and date the form with their company name to acknowledge their pricing commitment. The unit pricing structure enables the State to manage costs efficiently for any authorized scope modifications throughout the project delivery period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
UNIT PRICING FORM
Institution or Agency: Colorado Department of Public Health and Environment Project No./Project Name: 793 - ATOPs SB MT GOAT Site Construction project
INSTRUCTIONS:
The unit prices below shall be used to determine adjustment to the contract sum when changes in the work involving said items are deemed necessary.
Unit Prices shall apply until the date of contract completion established on the Notice to Proceed.
All unit prices shall include the pro-rata share of all costs of materials, equipment and disposal required to complete the work item. Overhead, profit and bond will be calculated on a Change Order Proposal (SC-6.312).
UNIT PRICING
| Number |
| Description |
Unit of Measure
Unit Price
U1
U2
U3
U4
U5
U6
U7
U8
U9
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
SBP-6.131
Rev 7/2025 image1.jpeg