Exhibit_C_Scoring_Criteria.pdf

PDF 649 KB Posted

Attached to
Downtown Master Plan Update State and local contract opportunity
Solicitation number
26-19RH
Issued by
Sarasota County, Siesta Key CDP, Florida

About this file

This is a Scoring Criteria document for the City of Sarasota's Downtown Master Plan Update Invitation to Negotiate (ITN). The evaluation framework allocates 100 total points across five categories: Proposer Qualifications and Company Information (25 points, Tabs I and II), Personnel Team Experience and Qualifications (25 points, Tab III), Approach and Service Delivery Plan (40 points, Tab IV), Firm Capacity and Resources (5 points, Tab V), and Cost/Pricing (5 points, Tab VI). The proposal submission structure requires responses organized by these six tabs corresponding to the specific evaluation categories. The Approach section carries the highest weight at 40 percent of the total score, reflecting the City's emphasis on the methodology and quality of the consultant's proposed work plan. Proposals are due by March 3, 2026, with evaluations anticipated in March and interviews and negotiations scheduled for March/April, leading to City Commission approval in April 2026.

The pricing evaluation employs a relative scoring methodology rather than absolute point allocation. The proposer submitting the lowest price proposal receives the maximum 5 points available for cost, while all other proposers are scored using a proportional formula: (Lowest Price Proposal ÷ Proposer's Price Proposal) × Maximum Points. For example, if the lowest bid is $150,000, that proposer receives 5 points; a proposer bidding $160,000 would receive 4.69 points calculated as ($150,000 ÷ $160,000) × 5. This structure incentivizes competitive pricing while preventing cost from dominating the overall evaluation, as the combined weight of Capacity and Cost categories represents only 10 percent of the total possible score. Pricing proposals must include all-inclusive costs for the initial three-year contract term and two optional one-year renewal periods, submitted through the OpenGov portal.

View the file

Other files for this state and local contract opportunity

Other files attached to Downtown Master Plan Update, newest first.
File Type Posted
Exhibit_E-_Scope_of_Work.pdf PDF
26-19H_Exhibit_E-_Scope_of_Work.pdf PDF
Exhibit_E-_Scope_of_Work.pdf PDF
26-19H_Exhibit_E-_Scope_of_Work.pdf PDF
General_Terms_and_Conditions.pdf PDF
ITN_Terms_and_Conditions.pdf PDF
General_Terms_and_Conditions.pdf PDF
ITN_Terms_and_Conditions.pdf PDF
ITN_Terms_and_Conditions.pdf PDF
General_Terms_and_Conditions.pdf PDF
Exhibit_D-_Price_Proposal.xlsx XLSX spreadsheet
Exhibit_D-_Price_Proposal.xlsx XLSX spreadsheet
Exhibit_D-_Price_Proposal.xlsx XLSX spreadsheet
Exhibit_A_-_Required_Forms-no_Local_Pref.pdf PDF
Exhibit_B_Proposal_Requirements.pdf PDF
Exhibit_C_Scoring_Criteria.pdf PDF
Exhibit_C_Scoring_Criteria.pdf PDF
Exhibit_B_Proposal_Requirements.pdf PDF
Exhibit_A_-_Required_Forms-no_Local_Pref.pdf PDF
Exhibit_A_-_Required_Forms-no_Local_Pref.pdf PDF
Exhibit_B_Proposal_Requirements.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scoring Criteria

Category Category Title Category Description Proposal

Tab(s) Points

1 Qualifications of Company

Includes Proposer experience and company information. Company Introduction and Executive Summary.

Tab I and II 25

2 Personnel Team experience and qualifictaions Tab III 25

3 Approach

Details on how you plan to provide your products or services based on the specifications or scope of work provided in this ITN

Tab IV 40

4 Capacity Firms capacity and resources to provide the services herein.

Tab V 5

5 Cost/Pricing Lump sum cost of product or services as calculated using formula.

Tab VI 5

Total Score 100

Scoring categories correspond to proposal tabs as set in the Terms and Conditions

*Price Scoring The Proposer with the lowest Price Proposal will be awarded the maximum score of listed above. All other proposals will be scored according to the following formula: (Lowest Price Proposal/ Proposer’s Price Proposal) x Maximum points. Score For example, the maximum score available for price is 25. If the lowest proposed Price Proposal is $150,000.00 that Proposer will receive the full 25 points. Another Proposer with a Price Proposal of $160,000.00 will receive points calculated as follows:

$ 150,000.00/ $160,000.00 = .9375 .9375 x 25 = 23.4375 23.44 Points Awarded

Exhibit C 1 of 1

Sheet1

File details come from the government source that posted it. Updated .