This is a Scope of Work document issued by the West Virginia Army National Guard for climbing tower repair and maintenance at Camp Dawson in Kingwood, West Virginia. The project scope involves comprehensive maintenance of an approximately 50-foot by 22-foot by 56-foot tall climbing tower with an estimated surface area of 13,670 square feet. Work includes filling all cavities with structural epoxy suitable for wood applications, applying wood protective coating to all surfaces including walls, stairs, platforms, and railings, applying textured anti-slip paint to stair treads and the upper platform edge, and reapplying high-visibility yellow safety markings on the top platform. The tower is constructed of a mixture of pressure-treated and glulam lumber. The contractor is responsible for verifying all measurements and quantities prior to project initiation and for obtaining all required permits and compliance certifications with federal, state, and local regulations, including requirements from the State Fire Marshal and Army Force Protection standards. The successful contractor must provide Camp Dawson staff with training on operation and maintenance upon project completion and must conduct bi-weekly progress meetings with detailed minutes submitted within three business days.
The contractor must supply all labor, materials, equipment, and temporary facilities necessary to complete the work and is responsible for all testing, waste disposal, and site cleanup at project expense. Materials and colors require WVARNG approval prior to installation. The contractor must provide a one-year warranty on all parts, labor, and materials and submit as-built drawings and field notes within 30 days of final government acceptance. All contractor and subcontractor employees require background checks and personal identity verification to access the DoD installation, with two business days' notice required for site access and deliveries. The WVARNG will provide a laydown area and job trailer space but electric and water service are not guaranteed. The recommended wood preservative is Total Wood Preservative (TWP 100 series) or equivalent, with the contractor bearing responsibility for Volatile Organic Compound compliance based on the preservative selected and location of use.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CRFQ ADJ27_09 Solicitation Documents.pdf | ||
| Final_CRFQ_0603_ADJ2700000009_1_WV_CRFQ_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WEST VIRGINIA ARMY NATIONAL GUARD
CAMP DAWSON, KINGWOOD WV
Climbing Tower Repair
2nd June 2026
Division 1 - General Requirements
01100 Summary
The purpose of this scope of work is to outline the steps required for conducting maintenance to the climbing tower located on Camp Dawson in Kingwood, WV. A structural epoxy is to be applied to all cavities present on the tower. A protective coat, according to the manufacturer’s directions, will be applied to all wooden surfaces of the climbing tower; for wood preservation and waterproofing.
Additionally, a form of textured paint is to be applied on the steps of the stairs and around the edge of the upper platform of the tower. Yellow paint markings for the upper platform of the tower will need to be reapplied as well. Attached at the bottom of this document are two pages providing a visual of the tower’s design on all four sides.
The objectives for this project are as follows:
• Fill cavities with structural epoxy for wood applications.
• Prepare surfaces for treatment per the preservative manufacturer’s recommendations.
• Apply wood protective coating to all surfaces of the tower to include walls, stairs, platforms, and railings.
• Apply textured paint to the stairs and top platform edge of the tower.
• Apply yellow paint markings as required by safety standards.
01200 Price and Payment Procedures
01300 Administrative Requirements
PROJECT COORDINATION
• Coordinate construction activities included in Contract Documents to assure efficient and orderly installation of each part of the Work.
• Coordinate construction operations that are dependent upon each other for proper installation, connection, and operation.
• Where installation of one part of the Work is dependent on installation of other components, either before or after its own installation, schedule construction activities in sequence required to obtain best results.
• Where availability of space is limited, coordinate installation of different components to assure maximum accessibility for required maintenance, service, and repair.
• Make adequate provisions to accommodate items scheduled for later installation.
• Where necessary prepare memoranda for distribution to each party involved outlining special procedures required for coordination. Include such items as required notices, reports, and attendance at meetings. Prepare similar memoranda for Owner and separate Contractors where coordination of their Work is required.
ADMINISTRATIVE PROCEDURES
• Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and ensure orderly progress of the Work. Such administrative activities include, but are not limited to:
o Preparing of schedules.
o Installing and removing temporary facilities.
o Delivering and processing submittals.
o Progress meetings.
o Project Close-out activities.
CONSERVATION
• Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.
PROGRESS MEETINGS
• Contractor will conduct progress meetings at site agreed upon by the Project Manager at regularly scheduled intervals, generally bi-weekly.
• Progress meeting minutes are to be provided by the contractor within 3 business day of conclusion of the meeting. The meeting minutes shall be approved at the next meeting.
• The progress agenda shall include:
o Review and correct or approve minutes of previous progress meeting.
o Review and discuss old business o Review and discuss new business o Review and discuss contractor’s issues and concerns o Review and discuss owner’s issues and concerns o Review and discuss progress since last meeting.
o Review where each activity is in relation to Contractor's Construction Schedule, whether on time or ahead or behind schedule, will be determined.
o Contractor to present a new updated schedule at each progress meeting; to include a two week look ahead.
• Contractor shall provide meeting minutes of each progress meeting within three days after each progress meeting date. Contractor will distribute copies of minutes of meeting to the Project Manager.
GENERAL RESPONSIBILITIES
• The successful contractor is responsible for providing all parts, labor, equipment, and materials required to provide a finished fully functional product as described in the objectives.
• The contractor is responsible for the cost and obtaining of all required permits.
• The contactor is responsible to ensure all work is in compliance with all Federal, State, Local
Municipalities, State Fire Marshall and ATFP requirements.
• Contractor is responsible for all permits; the contractor shall obtain all required permits prior to initiation of any work. The contractor shall be responsible for the associated costs or permitting.
• Contractor is responsible for field verifying all distances and quantities of materials and components necessary for completion.
• The contractor is responsible for cleaning up the work site and repairing the site to original conditions once work is completed.
• Contractor responsible for keeping the work site clean daily, free from excess debris and safety hazards.
• Contractor responsible for providing waste disposal for the project; contractor is responsible for removing all construction waste debris off site at the contractor’s expense.
• Any and all testing is to be performed at the contractor’s expense.
• All materials and colors shall be submitted and approved by the WVARNG prior to installation.
• The successful contractor will be required to provide Camp Dawson staff with training on the operation and maintenance on any new systems at project completion.
• The West Virginia Army National Guard reserves the right to claim removed equipment from the project. A list of equipment to be retained will be provided to the contractor prior to beginning work. Contractor to make every effort to remove these items without damage.
• All design-build projects shall include specifications and drawings for submittal packages.
• Contractor is responsible for providing any Operation and Maintenance Manuals, design drawings, and documentation certifying the systems completion and operation.
• The contractor will provide a schedule of values broken down per line item with material and labor.
• Owner has 7 business days to review and respond to Requests For Information (RFI)s.
• Owner has 14 business days to review and respond to contract submittals.
• Owner has 14 business days to review and respond to review drawings.
SITE ACCESS REQUIREMENTS
• Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors' employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204- 9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
• For contractors that do not require CAC, but require access to a DoD facility or installation.
Contactor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NICI-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
• Contractor is responsible for coordinating with the Project Manager at Camp Dawson, for access and deliveries to Camp Dawson. The Project Manager requires two (2) business days’ notice to approve access to Camp Dawson. Failure to give adequate notice may result in deliveries or sub-contractors being refused access to Camp Dawson and a Non Compliance Notice (NCN).
Contractor shall be responsible for any rescheduling costs occurs due to noncompliance.
01400 Quality Requirements
• The successful contractor will be required to provide a one year warranty on all parts, labor and materials on the entire project.
• No hardware, devices, or conversion software or hardware will be accepted that has been on the market for less than 5 years; all devices require the approval of the WVARNG.
01500 Temporary Facilities and Controls
• The successful contractor will be required to provide their own temporary facilities. The West Virginia Army National Guard will provide an area for the contractor to have a lay down area, and a place for a job trailer.
• The West Virginia Army National Guard will make every effort to provide electric and water for the contractor’s lay down and job trailer site; however it is not guaranteed.
01700 Execution Requirements
• Within 30 days of the government Final Acceptance of the project; the contractor shall be responsible to provide any and all field notes, as-built drawings, or any other associated records to the Project Manager.
01800 Facility Operation
01900 Facility Decommissioning
Division 6 – Wood and Plastics
06900 Wood and Plastic Restoration and Cleaning
Structural epoxy applicable to wood surfaces is to be used to fill all cavities present on the climbing tower. All steps outlined by the manufacturer for preparation and application of the epoxy are to be followed. Example of applicable wood epoxy: Abatron WoodEpox.
Division 9 - Finishes
09050 Basic Materials and Methods
The climbing tower is approximately 50` x 22` x 56`, with an estimated surface area of 13,670 sq ft.
These measurements are purely approximations; contractor is responsible for accurate measures of area to be coated before approval and start of project. The tower is comprised of a mixture of pressure treated and glulam lumber. The recommended preservative is “Total Wood Preservative (TWP 100 series)” however, a brand of equal or greater value can be used. Contractor will be responsible for Volatile Organic Compound (VOC) regulation compliance with the location of use dependent on the type of wood preservative used. The surfaces to be treated must be prepped before any preservative is applied, at a minimum of what is recommended by the chemical manufacturer. All wood surfaces must be coated for the preservation of the tower. Post wood preservative treatment, a textured paint needs to be applied to the treads of the stairs and the outer edge of the top platform. The textured paint must provide anti-slip properties under normal and wet conditions. In addition, a high visibility yellow paint must be used to reapply the yellow markings present on the top platform to meet tower safety requirements.
09900 Paints and Coatings
The color of the wood preservative is preferred clear, particularly on the surfaces of the supporting poles. However, for the main body of the tower a natural color matching the current shade is acceptable. The color of the textured paint can match the existing paint or be of a neutral color. The paint color for the safety markings must be a high visibility yellow or shade of yellow that is bright and distinguishable from the tower.