Exhibit C _ CM_GC Fee Proposal.docx
DOCX document 15 KB Posted
- Solicitation number
- PE-50300-RFP-2027-000000330
- Issued by
- Fulton County, Georgia
About this file
This is a Construction Manager/General Contractor (CM/GC) Fee Proposal document for the Georgia Institute of Technology's Architecture West Mechanical Systems Improvements project (Project No. 0535-2025) located in Atlanta, Georgia. The proposal establishes the fee structure for CM/GC services, which are divided into two primary categories: preconstruction services and construction services. The preconstruction phase encompasses consulting services as defined in the General Requirements, while the construction phase covers the actual construction execution. The document specifies that fees represent gross profit for services rendered, provided the CM/GC fulfills all contract requirements within established timeframes.
The fee proposal structure includes four distinct cost components: a fixed preconstruction fee, a fixed construction fee, maximum preconstruction costs and expenses (excluding the preconstruction fee), and maximum construction overhead costs (excluding the construction fee). All overhead costs are inclusive of direct and incidental expenses as detailed in supporting attachments. The proposal requires signature authorization from a CM/GC officer, with specific dollar amounts to be populated for each fee and cost category. This document serves as part of a two-step procurement process in which qualified firms selected through initial Statement of Qualifications are invited to submit detailed fee proposals in the Request for Proposal phase.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit A _ Certification Form.docx | DOCX document | |
| Exhibit E _ General Conditions_Breakdown.xlsx | XLSX spreadsheet | |
| _2002_27_ 2025_0535 CM RFPQ R_dv2.pdf | ||
| Exhibit D _ Preconstruction Cost_Expenses Bre.xlsx | XLSX spreadsheet | |
| Exhibit B _ Contractor Affidavit.docx | DOCX document | |
| Exhibit F _ Project Cost Matrix.xlsx | XLSX spreadsheet | |
| Exhibit G _ Proposer_s Disclosure Statement.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C
CM/GC Services for Project No. 0535-2025 Architecture West Mechanical Systems Improvements, Georgia Institute of Technology, Atlanta, Georgia
CM/GC FEE PROPOSAL
1. CM/GC’S FEE:
Basis of Fee. The CM/GC’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the CM/GC as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the CM/GC performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.
A. PRECONSTRUCTION FEE:
Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by CM/GC as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to CM/GC a Preconstruction Fee:
TOTAL
Pre-Construction Fee (fixed fee)
B. CONSTRUCTION FEE:
Construction Fee. Representing the gross profit for the construction services provided by CM/GC as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to CM/GC a Construction Fee.
TOTAL
Construction Fee (fixed fee)
2. CM/GC’S PRECONSTRUCTION COSTS AND CONSTRUCTION OVERHEAD COSTS:
The CM/GC’s Overhead Costs. The maximum amount for the CM/GC’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .
AMOUNT
A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)
B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)
Total Maximum Overhead Cost (Sum of A & B)
CM/GC Name
By:_________________________________________________________ Signature of CM/GC Officer
Title of CM/GC Officer