Floor Specifications Summary
This document is the Floor Specifications exhibit (Exhibit B) for Alameda County General Services Agency Bid No. 902791, detailing the PWA Flood Office Carpet Replacement project located at 951 Turner Court, Hayward, California. The project encompasses complete floor replacement services including removal and disposal of existing flooring, substrate preparation and moisture testing, installation of new resilient flooring systems, base and transition installation, furniture moving coordination, and protection of adjacent finishes. Two primary flooring products are specified: ShawContract Abide Luxury Vinyl Tile (LVT) in Coriander Oak color (Style 4107V, 07720) with a 20-mil wear layer and 2.5mm thickness for resilient flooring applications, and PatCraft Natural Form Carpet Tile in Tree Line color (Style I0499, 00705) featuring 24" x 24" tiles with 15 oz/yd² face weight and multi-level loop construction. The project requires compliance with Alameda County Green Building Ordinance and Environmentally Preferable Purchasing Policy, adherence to multiple ASTM standards and California Building Code requirements, and comprehensive submittals including product data, shop drawings, samples, moisture testing reports, and environmental/sustainability documentation. Work must be phased to minimize disruption to the occupied office environment, with excessive noise or odor work restricted to evenings, nights, weekends, or approved off-hours.
The specifications mandate heavy commercial-grade materials with minimum performance standards including Class I fire rating, smoke density less than 450, static electricity less than 3.5 kV, and slip resistance compliant with ADA requirements. Contractors must employ manufacturers with minimum five years' experience and installer qualifications certified by manufacturers where programs exist. All adhesives must comply with SCAQMD Rule 1168 and CDPH emissions standards with VOC content of 50 g/L or less, while carpet tile products must achieve NSF/ANSI-140 Platinum certification and CRI Green Label Plus compliance. Moisture mitigation systems are required where substrate moisture exceeds manufacturer limits, with comprehensive testing conducted per ASTM F2170 and F1869 standards prior to installation. Warranty requirements include 10-15 year manufacturer coverage and minimum 2-year installer warranties. The contractor is responsible for furniture moving, coordination, and protection during installation; managing all waste through approved recycling programs; and delivering attic stock consisting of 2% of installed materials in unopened original cartons with complete labeling and documentation of recycling certificates for removed flooring.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Alameda County, General Services Agency BID #902791 PWA Flood Office Carpet Replacement
ALAMEDA COUNTY GSA-BMD FLOOR SPECIFICATIONS
Page 1 EXHIBIT B
EXHIBIT B
FLOOR SPECIFICATIONS
The following items are included as part of this Exhibit:
1. Section 09 65 00 – Resilient Flooring
2. Section 09 68 13 – Carpet Tile
3. ShawContract Abide Product Specification
4. Patcraft Natural Form Product Specification
Alameda County General Services Agency PROJECT #27008 PWA Flood Office Floor Replacement BID #902791
ALAMEDA COUNTY GSA-BMD CARPET TILE
Page 1 DOCUMENT 09 68 13
DOCUMENT 09 65 00
RESILIENT FLOORING
PART 1 - GENERAL
1.01. Summary
A. Section Includes:
(1) Resilient Sheet Flooring (Sheet vinyl flooring)
(2) Resilient Tile Flooring
(3) Luxury Vinyl Tile (LVT)
(4) Luxury Vinyl Plank (LVP)
(5) Sheet Vinyl Flooring
(6) Rubber base
(7) Resilient base and accessories
(8) Transition strips and accessories.
(9) Moisture mitigation and substrate preparation related to resilient flooring installation.
(10) Adhesives and accessories required for complete installation.
(11) Furniture moving coordination associated with replacement.
B. Related Sections:
(1) Section 01 10 00 – Summary of Work
(2) Section 01 22 00 – Unit Prices and Alternates
(3) Section 01 74 19 – Construction Waste Management
(4) Section 09 68 13 – Carpet Tile
1.02. Description of Work
A. Provide all labor, materials, tools, equipment, and services necessary to provide a complete floor replacement project, including:
(1) Removal and disposal of existing flooring and accessories.
(2) Substrate (subfloor) preparation and moisture testing.
(3) Installation of new resilient flooring system (tile, plank, sheet, etc.)
(4) Installation of base and transitions.
(5) Furniture moving and coordination.
(6) Protection of adjacent finishes.
(7) Coordination with County building operations.
B. Work shall comply with:
(1) Alameda County Green Building Ordinance
Page 2 DOCUMENT 09 68 13
(2) Alameda County Environmentally Preferable Purchasing Policy.
1.03. References and Standards
A. Comply with the latest editions of the following standards:
(1) ASTM E85 – Standard Test Method for Surface Burning Characteristics of
Building Materials.
(2) ASTM E648 – Standard Test Method for Critical Radiant Flux of Floor-Covering
Systems Using a Radiant Heat Energy Source
(3) ASTM E662 - Standard Test Method for Specific Optical Density of Smoke
Generated by Solid Materials
(4) ASTM F710 – Subfloor Preparation
(5) ASTM F970 – Static Load Limit.
(6) ASTM F1303 – Standard Specification for Sheet Vinyl Floor Covering with
Backing
(7) ASTM F1700 – Solid Vinyl Floor Tile.
(8) ASTM F1861 – Standard Specification for Resilient Wall Base
(9) ASTM F1869 – Moisture Vapor Emission Rate
(10) ASTM F1913 – Sheet Vinyl Flooring Without Backing.
(11) ASTM F2169 – Resilient Stair Treads.
(12) ASTM F2170 – Relative Humidity (Moisture) Testing
(13) CRI Green Label Plus
(14) California Building Code (CBC)
(15) California Code of Regulations (CCR)
(16) National Sanitation Foundation (NSF)/American National Standards Institute
(ANSI)
(17) NSF/ANSI 332 Sustainability Assessment for Resilient Floor Coverings
(18) Resilient Floor Covering Institute (RFCI)
(19) SCAQMD Rule 1168
(20) Title 24, Part 11, California Green Building Standards Code (CalGreen)
1.04. Submittals
A. Product Data: Manufacturer’s data sheets on each product to be used, including:
(1) Manufacture product specifications.
(2) Material Safety Data Sheets.
(3) Preparation instructions and recommendations. Include installation recommendations for each type of substrate required.
(4) Storage and handing requirements and recommendations.
(5) Installation methods and instructions.
(6) Maintenance and caring guidelines.
(7) VOC content documentation
(8) LEED/CALGreen compliance data, if required.
Page 3 DOCUMENT 09 68 13
(9) Other data as may be required to show compliance with Contract Documents.
B. Shop Drawings: Submit shop drawings showing the following
(1) Flooring layout.
a. Existing floor materials to be removed.
b. Existing floor materials to remain.
c. Columns, doorways, enclosing walls or partitions, built-in cabinets, and locations where cutouts are required.
(2) Seams and transition locations.
(3) Base and accessory details.
(4) Pattern alignment where applicable.
(5) Phasing or sequencing plans.
(6) Furniture coordination sequence.
C. Samples: Submit samples showing full range of color, texture, and pattern variations expected. Prepare samples from same material to be used for the Work. Label each Sample with manufacturer's name, material description, color, pattern, and designation indicated on Drawings and in schedules. Submit the following:
(1) Minimum 6” x 6” sample of each flooring type and color.
(2) Full accessory samples.
D. Quality Control Submittals:
(1) Manufacturer certification.
(2) Installer qualifications.
(3) Moisture testing reports.
(4) Adhesive compatibility documentation.
E. Moisture Testing Reports: Submit moisture testing reports showing:
(1) ASTM F2170 testing results.
(2) ASTM F1869 testing results where required by manufacturer.
(3) Exact test locations.
(4) Recommended mitigation measures if limits are exceeded.
F. Closeout Submittals: Submit the following closeout items:
(1) Warranty documents.
(2) Maintenance documents: Instructions for care, cleaning, maintenance, and repairs.
(3) Recycling certificates (if applicable)
(4) Attic stock inventory.
(5) Final moisture testing reports.
Page 4 DOCUMENT 09 68 13
1.05. Quality Assurance
A. Manufacturer Qualifications: Minimum 5 years experience manufacturing similar products.
B. Installer Qualifications: Minimum 5 years experience installing similar products.
Manufacture approved installer where manufacture certification program exists.
C. Performance: Fire performance meeting requirements of building code and local authorities.
D. Pre-Installation Conference: Conduct a meeting with the County to review
(1) Project phasing
(2) Furniture moving and coordination
(3) Access requirements and restrictions
(4) Moisture testing
(5) Subfloor conditions
(6) Indoor air quality controls
1.06. Delivery, Storage, and Handling
A. Deliver and store products in manufacturer's unopened original packaging bearing the brand name and manufacturer's identification until ready for installation.
B. Handling: Handle materials to avoid damage.
C. Store materials in a dry location, in such manner as to prevent damage. Protect materials from moisture and damage.
D. Acclimate flooring materials for a minimum of 48 hours before, during, and after the installation, unless otherwise directed by manufacture’s requirements.
1.07. Project Conditions
A. Work shall be performed in an occupied office environment and shall be phased accordingly.
(1) Building will remain occupied during construction.
(2) Contractor shall phase the Work to minimize disruption to County operations.
(3) Work producing excessive noise, odor, or disruption shall be performed during evenings, nights, weekends, or approved off-hours.
(4) Maintain safe access and egress at all times.
(5) Provide temporary barricades, signage, and protection as required, Page 5 DOCUMENT 09 68 13
B. Contractor shall:
(1) Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturers for optimum results.
(2) Do not install products under environmental conditions outside manufacturer's recommended limits.
(3) Coordinate with County and facility operations.
C. Do not install flooring until:
(1) Building is enclosed.
(2) Wet work is complete and cured.
(3) HVAC is operational or working within specified conditions.
D. Concrete moisture conditions shall comply with manufacture requirements.
1.08. Sequencing
A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.
1.09. Warranty
A. Manufacturer: Provide written manufacture warranty covering a period of 10-15 years
B. Installer: Provide a minimum 2 year installer warranty.
PART 2 – PRODUCTS
2.01. Luxury Vinyl Tile
A. Product: ShawContract Abide Luxury Vinyl Tile
(1) Collection: Abide & Inhabit
(2) Style Number: 4107V
(3) Color: Coriander Oak 07720
B. Type: Heavy Commercial-grade Luxury Vinyl Tile
C. Construction:
(1) Solid vinyl or heterogeneous construction.
(2) Minimum wear layer: 22 mil or greater unless noted otherwise.
Page 6 DOCUMENT 09 68 13
D. Thickness: Minimum 2.5 mm or greater unless noted otherwise.
E. Performance Requirements:
(1) Static load resistance per ASTM F970.
(2) Slip resistance compliant with ADA.
(3) Class I flame spread.
F. Finish:
(1) Factory-applied polyurethane or ceramic bead coating.
G. Colors and patterns as selected by the County based on samples provided by the Contractor.
2.02. Rubber Base
A. Type: Thermoset rubber base.
B. Height: 4 inch unless noted otherwise.
C. Thickness: 1/8 inch minimum.
D. Toe Style: Coved.
E. Color: Black
2.03. Accessories
A. Transition strips: Aluminum, rubber, or vinyl as appropriate.
B. Edge strips and reducers.
C. Stair nosings where indicated or required.
D. Weld rods for sheet flooring.
2.04. Adhesives
A. Low-VOC (or zero VOC) adhesives compliant with:
(1) South Coast AQMD Rule 1168.
(2) CDPH emissions standards.
B. As recommended by flooring manufacturer.
Page 7 DOCUMENT 09 68 13
2.05. Patching and Leveling Materials
A. Portland cement-based underlayment compatible with flooring system.
B. Moisture Mitigation System
(1) General: Provide manufacturer-approved moisture mitigation system where substrate moisture exceeds manufacturer limits.
(2) Compatibility: Must be compatible with carpet system, adhesives, and existing substrate.
2.06. Substitutions
A. Requests for substitutions must be submitted in accordance with provisions of Division 00 and Division 01 requirements.
PART 3 – EXECUTION
3.01. Examination
A. Verify substrate condition, moisture levels, and site readiness according to manufacturer requirements. Substrates shall be clean, dry, smooth, and structural sound.
B. Perform moisture testing and submit the results to the County.
C. Do not begin installation until substrates have been properly prepared.
D. If substrate preparation is the responsibility of another installer, notify the County of unsatisfactory preparation before proceeding.
3.02. Preparation
A. Remove existing materials and contaminants. Clean surfaces thoroughly prior to installation.
B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
C. Fill cracks and depressions.
D. Grind high spots.
E. Perform moisture testing according to ASTM and manufacturer requirements.
F. Submit moisture testing results prior to installation.
Page 8 DOCUMENT 09 68 13
3.03. Installation
A. Install flooring in accordance with the manufacturer's instructions, specified industry standards and recommendations, and as required.
B. Layout:
(1) Center flooring in the spaces unless otherwise indicated.
(2) Maintain straight alignment.
(3) Maintain pattern consistency and ensure proper adhesion.
C. LVT:
(1) Roll flooring after installation.
(2) Maintain tight joints.
D. Base:
(1) Install tight to wall and floor.
(2) Scribe to irregularities.
E. Accessories:
(1) Install transitions at changes in flooring type and elevation.
F. Traffic Restrictions:
(1) Traffic over adhesive installations shall be restricted until adhesive has properly cured in accordance with the adhesive manufacturer’s recommendations.
G. Floor boxes and access panels:
(1) Coordinate installation around floor boxes and telecommunications devices.
(2) Maintain access to removable panels.
3.04. Phased and Occupied Work
A. Contractor shall:
(1) Execute phased installation as required by the County. Sequence work to minimize disruptions.
Page 9 DOCUMENT 09 68 13
(2) Coordinate furniture moving or lifting as required to perform the work.
(3) Coordinate work with County building operations. Maintain access to occupied spaces.
B. Furniture Moving and Coordination
(1) Contractor shall be responsible for moving or lifting office furniture required for carpet replacement.
(2) The County shall disconnect and reconnect any specialized electronic equipment as determined on the pre-construction site walk, unless noted otherwise.
(3) Coordinate installation with existing furniture, including protecting furniture while moving or lifting.
(4) Protect furniture and finishes during moves.
(5) Sequence work to minimize disruption and coordinate with building occupants.
Coordinate furniture sequencing a minimum of 5 working days in advance.
3.05. Field Quality Control
A. Inspect flooring for
(1) Bond integrity.
(2) Seam quality.
(3) Alignment.
(4) Surface defects.
B. Replace all defective work.
3.06. Waste Management
A. Recycle all installation scraps.
B. Comply with County Sustainability and Waste Management requirements.
3.07. Cleaning and Protection
A. Cleaning:
(1) Remove adhesive residue.
(2) Clean flooring using manufacturers approved methods and instructions.
(3) Protect installed flooring from damage.
Page 10 DOCUMENT 09 68 13
B. Protection:
(1) Protect installed flooring until completion of project.
(2) Use non-staining breathable protection materials.
(3) Plastic and polyethylene sheet protective coverings shall not be permitted.
(4) At the completion of the work, remove covering, and clean flooring.
C. Touch-up, repair or replace damaged products before Substantial Completion.
3.08. Attic Stock
A. Attic Stock: Package and deliver any usable extra materials to the County at the conclusion of the project. Include any uncut carpet tiles. Package and label attached stock with:
(1) Manufacturer.
(2) Style.
(3) Color.
(4) Installation area.
(5) Installation date.
B. Provide the following quantities attic stock:
(1) LVT/LVP: 2% of installed quantity.
(2) Sheet vinyl: One full roll or 2 %, whichever is less.
(3) Rubber base: 1% of installed quantity.
C. Attic stock shall be from the same product and lot as the installed materials, packaged in unopened original cartons, labeled, and delivered to the County designated storage location before final completion.
3.09. Closeout
D. Final Acceptance: Complete the following items prior to final acceptance
(1) Remove temporary protection
(2) Repair deficiencies
(3) Complete final cleaning
(4) Deliver attic stock
(5) Submit closeout documents
END OF DOCUMENT
Page 1 DOCUMENT 09 68 13
DOCUMENT 09 68 13
CARPET TILE
PART 1 - GENERAL
1.01. Summary
A. Section Includes:
(1) Modular carpet tile flooring.
(2) Adhesives and installation systems.
(3) Subfloor preparation related to carpet installation.
(4) Accessories including transitions and edge conditions.
(5) Environmental/sustainable compliance and recycling requirements.
(6) Removal and recycling of existing carpet.
(7) Furniture moving coordination associated with carpet replacement.
(8) Moisture mitigation systems where required.
(9) Rubber base replacement.
B. Related Sections:
(1) Section 01 10 00 – Summary of Work
(2) Section 01 22 00 – Unit Prices and Alternates
(3) Section 01 74 19 – Construction Waste Management
(4) Section 09 65 00 – Resilient Flooring
1.02. Description of Work
A. Provide all labor, materials, tools, equipment, and services necessary to provide a complete carpet tile replacement project, including:
(1) Removal and disposal of existing carpet or flooring and accessories.
(2) Substrate (subfloor) preparation and moisture testing.
(3) Installation of new carpet tile system.
(4) Installation of base and transitions.
(5) Furniture moving and coordination.
(6) Protection of adjacent finishes.
(7) Coordination with County building operations.
(8) Recycling of removed carpet and installation waste.
B. Work shall comply with:
(1) Alameda County Green Building Ordinance
(2) Alameda County Environmentally Preferable Purchasing Policy.
Page 2 DOCUMENT 09 68 13
C. Work shall be performed in an occupied office environment and shall be phased accordingly.
(1) Building will remain occupied during construction.
(2) Contractor shall phase the Work to minimize disruption to County operations.
(3) Work producing excessive noise, odor, or disruption shall be performed during evenings, nights, weekends, or approved off-hours.
(4) Maintain safe access and egress at all times.
(5) Provide temporary barricades, signage, and protection as required.
1.03. References and Standards
A. References:
(1) ASTM E648 – Critical Radiant Flux
(2) ASTM E662 – Smoke Density
(3) ASTM F710 – Subfloor Preparation
(4) ASTM F1869 – Moisture Vapor Emission Rate
(5) ASTM F2170 – Relative Humidity (Moisture) Testing
(6) CRI Green Label Plus
(7) CRI 104 – Commercial Carpet Installation Standard
(8) NFPA 253
(9) California Building Code (CBC)
(10) California Fire Code and Title 19
(11) California Department of Public Health (CDPH) Standard Method v1.2-2017
(12) SCAQMD Rule 1168
(13) NSF/ANSI 140 Sustainability Standard for Carpet
(14) Carpet America Recovery Effort (CARE)
B. Standards: Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following
(1) The Carpet and Rug Institute "The Carpet Specifiers' Handbook."
(2) The Carpet and Rug Institute "CRI 104 Commercial Carpet Installation
Standard."
1.04. Submittals
A. Product Data: Manufacturer’s data sheets on each product to be used, including:
(1) Manufacture product specifications.
(2) Material Safety Data Sheets.
(3) Preparation instructions and recommendations. Include installation recommendations for each type of substrate required.
(4) Storage and handing requirements and recommendations.
(5) Installation methods and instructions.
Page 3 DOCUMENT 09 68 13
(6) Maintenance and caring guidelines.
(7) VOC content documentation.
(8) Other data as may be required to show compliance with Contract Documents.
B. Shop Drawings: Submit shop drawings showing the following
(1) Existing floor materials to be removed.
(2) Existing floor materials to remain.
(3) Columns, doorways, enclosing walls or partitions, built-in cabinets, and locations where cutouts are required in carpet tiles.
(4) Carpet tile type, color, and dye lot.
(5) Type of subfloor.
(6) Type of installation.
(7) Pattern of installation, carpet locations, direction, and starting points per floor.
(8) Type, color, and location of insets and borders.
(9) Type, color, and location of edge, transition, and other accessory strips.
(10) Pile direction.
(11) Transition and other accessory strips.
(12) Transition details to other flooring materials.
(13) Phasing or sequencing plans/limits.
(14) Furniture coordination sequence.
C. Samples: Submit samples showing full range of color, texture, and pattern variations expected.
(1) Prepare samples from same material to be used for the Work. Label each
Sample with manufacturer's name, material description, color, pattern, and designation indicated on Drawings and in schedules. Submit the following:
(2) Carpet Tile: Full-size Samples.
(3) Exposed Edge Stripping and Accessory: 12-inch (300-mm) long Samples.
D. Environmental and Sustainable Performance Submittals
(1) Indoor Air Quality Submittals (Required for LEED and non-LEED projects):
Provide documentation verifying compliance with LEED Credit IEQ Low-Emitting Materials
a. Flooring
i. If using the VOC Emissions Evaluation pathway, the products must be tested and documented according to California Department of Public Health (CDPH) Standard Method v1.2-2017 and complies with the VOC limits in Table 4-1 of the method
Page 4 DOCUMENT 09 68 13
ii. If using the Salvaged and Reused Materials pathway, documentation must follow the VOC Emissions Evaluation above and SCAQMD Rule #1168
b. Adhesives and Sealants
i. The products must be tested and documented according to California
Department of Public Health (CDPH) Standard Method v1.2-2017 and complies with the VOC limits in Table 4-1 of the method and must meet SCAQMD Rule #1168
(2) NSF/ANSI-140 Submittals: Submit proof of independent third-party NSF/ANSI-
140 Platinum certification.
(3) Recycled Content Percentage Submittals
a. Submit a statement signed by the manufacturer’s Executive Officer or independent certification third-party that the provided carpet materials have the specified recycled material percentage.
b. Submit documentation of manufacturer’s take-back program for carpet.
Include:
i. Confirmation that the new carpet being installed will be accepted (at the point of future replacement) through a manufacturer’s operated program for recycling or reuse
ii. Written description of such a process for the recycling and/or recovery of used/worn products
iii. Contact information for the take-back program
(4) Existing Carpet Recycling Plan and Recycling Certification
a. Submit documentation describing the reclamation plan for existing carpet.
Include appropriate contact information, overview of procedures, and limitations and conditions applicable to the project Carpet recycling options consist of:
i. Repurposing - reusing the product in another application such as facilitating the donation of used carpeting to charities and other nonprofit organizations.
ii. Closed Loop Recycling - turning waste materials into new materials of the same value, such as vinyl backing into vinyl backing and nylon yarn into nylon carpet yarn.
Page 5 DOCUMENT 09 68 13
iii. Open Loop Recycling – creating other product types from reclaimed carpet. For example, turning nylon face fiber into automotive parts or carpet padding, including nylon face fiber in recycled backings.
iv. Waste-to-Energy - using carpet for waste-to-energy. In the case of waste-to-energy, manufacturer shall justify why carpet cannot be recycled as this method should be a last resort.
v. Landfill or incineration – are not approved disposal methods
b. At the completion of the project, a certificate shall be furnished verifying the reclamation of the carpet and the pounds of material diverted from the landfill.
E. Moisture Testing Reports Submit moisture testing reports showing:
(1) ASTM F2170 testing results.
(2) ASTM F1869 testing results where required by manufacturer.
(3) Exact test locations.
(4) Recommended mitigation measures if limits are exceeded.
F. Maintenance Data: Submit copies of instructions for care, cleaning, maintenance, and repair of carpeting.
G. Closeout Submittals: Submit the following closeout items:
(1) Warranty documents.
(2) Maintenance instructions.
(3) Recycling certificates.
(4) Attic stock inventory.
(5) Final moisture testing reports.
1.05. Quality Assurance
A. Manufacturer Qualifications: Minimum 5 years experience manufacturing similar products.
B. Installer Qualifications: Minimum 5 years experience installing similar products.
Manufacture approved installer where manufacture certification program exists.
C. Performance: Fire performance meeting requirements of building code and local authorities.
D. Pre-Installation Conference: Conduct a meeting with the County to review
(1) Project phasing
(2) Furniture moving and coordination
(3) Access requirements and restrictions
Page 6 DOCUMENT 09 68 13
(4) Moisture testing
(5) Subfloor conditions
(6) Indoor air quality controls
E. Carpet selection shall prioritize:
(1) Durability
(2) Replicability (tile-based system)
(3) Lifecycle performance
1.06. Delivery, Storage, and Handling
A. Deliver and store products in manufacturer's unopened original packaging bearing the brand name and manufacturer's identification until ready for installation.
B. Handling: Handle materials to avoid damage.
C. Store materials in a dry location, in such manner as to prevent damage. Protect materials from moisture and damage.
D. Acclimate flooring materials for a minimum of 48 hours before, during, and after the installation, unless otherwise directed by manufacture’s requirements.
1.07. Project Conditions
A. Building is occupied during construction
B. Contractor shall:
(1) Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturers for optimum results.
(2) Do not install products under environmental conditions outside manufacturer's recommended limits.
(3) Coordinate with County and facility operations.
1.08. Sequencing
A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.
1.09. Warranty
A. Manufacturer: Provide written manufacture warranty covering a period of 10-15 years
B. Installer: Provide a minimum 2 year installer warranty.
Page 7 DOCUMENT 09 68 13
1.10. Attic Stock
A. Attic Stock: Package and deliver any usable extra materials to the County at the conclusion of the project. Include any uncut carpet tiles. Package and label attached stock with:
(1) Manufacturer.
(2) Style.
(3) Color.
(4) Dye lot.
(5) Installation area.
(6) Installation date.
B. Attic Stock Quantity: Provide attic stock consisting of 2% of total installation of each carpet tile product and color.
C. Attic stock shall be from the same product and dye lot as the installed materials, packaged in unopened original cartons, labeled, and delivered to the County designated storage location before final completion.
PART 2 – PRODUCTS
2.01. Carpet Tile and Accessories
A. Carpet Tile: PatCraft Natural Form Carpet Tile
(1) Collection: BioSymmetry
(2) Style Number: I0499
(3) Color: Tree Line 00705
(4) Carpet Tile Size: 24” x 24”
(5) NSF/ANSI-140 Platinum: All carpet products installed shall be certified to meet the NSF/ANSI-140 standard at the Platinum certification level.
(6) Fiber Content: 100% commercial grade Nylon Type 6 or 6,6
(7) Fiber Recycled Content: Minimum 10 percent post-consumer recycled content
(8) Primary Backing/Backcoating: One of the following two options:
a. PVC containing backing: Minimum 40% recycled content
b. Non-PVC material: no minimum recycled content
Page 8 DOCUMENT 09 68 13
(9) Secondary Backing/Cushion: Must meet the current U.S. EPA Comprehensive Procurement Guidelines for Carpet Cushion:
a. Bonded polyurethane: 15-50% postconsumer content
b. Jute: 40% postconsumer content
c. Synthetic fibers: 100% total recovered materials content
d. Rubber: 60-90% postconsumer content
(10) Color System: 100% solution dye fiber required.
(11) Indoor Air Quality: VOC Emissions
Carpet products must meet one of the following:
a. Provide carpet tile that complies with testing and product requirements of CRI’s “Green Label Plus” program; or
b. Provide carpet tile that complies with the product requirements of the California Department of Health Services’ “Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers”
(12) Carpet tiles shall contain no intentionally added:
a. Antimicrobials at or above 100 parts per million (ppm).
b. Flame retardant chemicals.
c. PFAS’S such as those commonly used as stain, water, or oil resistance treatments.
(13) Performance:
a. 15–20 oz face weight minimum
b. Class I fire rating
c. Smoke density ≤ 450
d. Static ≤ 3.5 kV
(14) Moisture Mitigation System
a. General: Provide manufacturer-approved moisture mitigation system where substrate moisture exceeds manufacturer limits.
b. Compatibility: Must be compatible with carpet system, adhesives, and existing substrate.
B. Installation Accessories
(1) Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet tile manufacturer.
Page 9 DOCUMENT 09 68 13
(2) Adhesives: Dry adhesives tabs or dots with virtually no-VOCs are preferred method of installation. If not available, water-resistant, mildew-resistant, non-staining, pressure-sensitive type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet tile and is recommended by carpet tile manufacturer for releasable installation.
a. Adhesives shall have a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24); or
b. Adhesives shall comply with the testing and product requirements of the
California Department of Health Services’ “Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers.”
(3) Carpet Edging: Provide rubber composition carpet edging in single lengths wherever possible, keeping the number of joints or splices to a minimum. Provide in quantities and locations as job required based upon the recommended good practice of the industry; include in every location where carpet terminates and other flooring continues. Color to match adjacent carpet types.
(4) Floor Sealer: Type as recommended by the carpet tile manufacturer for the applications indicated.
(5) Base: 4” black rubber base.
C. Substitutions:
(1) Requests for substitutions must be submitted in accordance with provisions of Division 00 and Division 01 requirements.
PART 3 – EXECUTION
3.01. Examination
A. Verify substrate condition, moisture levels, and site readiness.
B. Do not begin installation until substrates have been properly prepared.
C. Perform moisture testing and submit the results to the County.
D. If substrate preparation is the responsibility of another installer, notify the County of unsatisfactory preparation before proceeding.
3.02. Preparation
A. Remove existing materials. Clean surfaces thoroughly prior to installation.
Page 10 DOCUMENT 09 68 13
B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
3.03 Removal and Recycling of Existing Carpet
Remove existing carpet for recycling in accordance with manufacturer recommendations and as follows:
A. Consult with the County Project Manager before removing any flooring products where the installer suspects or detects there is asbestos. Old carpet contaminated with any controlled hazardous substances must be abated by a properly qualified hazardous waste management company.
B. Carpet Removal Procedures
(1) TILE:
a. Remove used carpet tile and stack neatly on pallets. Neatly stack carpet tiles or repack in cardboard boxes prior to placing in container. Do not stack higher than 6 feet on pallets. Include carpet scrap and waste from new installation. Immediately remove used carpet from Site.
b. Deposit only clean, dry used carpets in containers. Clean shall be defined as carpet free from demolition debris or asbestos contamination, garbage, and tack strips.
(2) BROADLOOM:
a. Remove used carpet in large pieces, roll tightly, and pack neatly in container.
Include carpet scrap and waste from new installation. Immediately remove used carpet from Site.
b. Deposit only clean, dry used carpets in containers. Clean shall be defined as carpet free from demolition debris or asbestos contamination, garbage, and tack strips.
C. Remove adhesive according to recommendations of the Carpet and Rug Institute (CRI).
(1) Adhesive Removal Solvents: Comply with Carpet and Rug Institute Publication
104.
D. Use a carpet recycling agency for all used carpet waste. Carpet scraps from the carpet installation must also be recycled.
(1) If there are no markets available to recycle existing carpet products and/or carpet is severely contaminated, vendor shall provide documentation to project manager as to why such products cannot be recycled.
(2) Notify project manager in writing which carpet recycling company is used and total tons of carpet recycled.
Page 11 DOCUMENT 09 68 13
E. If the carpet is destined to be recycled or refurbished by the manufacturer (i.e. if a take-back program was decided upon purchase of existing carpet), the manufacturer’s handling guidelines shall be followed.
F. Comply with all applicable hauling and disposal regulations.
3.04. Installation
A. General: Comply with the manufacturer's instructions, specified industry standards and recommendations, and as required to match the accepted sample installations. Apply adhesive in accordance with adhesive manufacturer's directions
B. Comply with recommendations of Carpet and Rug Institute 'Specifier's Handbook'.
C. Maintain pattern consistency and ensure proper adhesion.
D. Adhere all full size, perimeter tiles, and cut tiles, with a full spread of adhesive. Dry fit cut tiles and apply adhesive to tile back after tile has been cut. Use full uncut tiles down the center of corridors and, where necessary, cut perimeter tiles to butt walls.
E. Butt carpet tile tightly together to form seams without gaps or entrapped pile yarns and aligned with adjoining tiles.
F. Edge Strip Installation: Install edge strip at every location where edge of carpet is exposed to traffic, unless otherwise indicated. Unless otherwise directed by the County, install in single lengths and secure in accordance with manufacturer's directions.
G. Traffic over adhesive installations shall be restricted until adhesive has properly cured in accordance with the adhesive manufacturers recommendations.
H. Floor boxes and access panels:
(1) Coordinate installation around floor boxes and telecommunications devices.
(2) Maintain access to removable panels.
I. Transition Strips: Install transition stripes wherever carpet where required.
J. Traffic Restrictions: Restrict traffic until adhesive cures.
K. Ensure that installation scraps are recovered at the time of the carpet installation; these scraps must be collected and entered into a recycling or reuse program complying with all governing, hauling, and disposal regulations of the authorities having jurisdiction.
3.05. Phased and Occupied Work
Page 12 DOCUMENT 09 68 13
A. Contractor shall:
(1) Execute phased installation as required by the County. Sequence work to minimize disruptions.
(2) Coordinate furniture moving or lifting as required to perform the work.
(3) Coordinate work with County building operations. Maintain access to occupied spaces.
B. Furniture Moving and Coordination
(1) Contractor shall be responsible for moving or lifting office furniture required for carpet replacement.
(2) County shall disconnect and reconnect specialized electronic equipment unless noted otherwise.
(3) Coordinate installation with existing furniture, including protecting furniture while moving or lifting.
(4) Protect furniture and finishes during moves.
(5) Sequence work to minimize disruption and coordinate with building occupants.
Coordinate furniture sequencing a minimum of 5 working days in advance.
3.06. Waste Management
A. Recycle all installation scraps.
B. Comply with County Sustainability and Waste Management requirements.
3.07. Cleaning and Protection
A. Cleaning: As the carpeting is installed, remove and dispose of all trimmings, excess pieces of carpeting and laying materials from each area as it is completed. Vacuum carpeting with a commercial vacuum, having a cylindrical brush or beater bar and high suction. Remove adhesives, stains, and soil spots in accordance with the carpet manufacturer's recommendations
B. Protection: Protect installed products until completion of project. Protect carpeting against damage of every kind as damaged carpeting shall be rejected. Use non-staining cover material for protection. Tape joints of protective covering.
(1) Plastic and polyethylene sheet protective coverings shall not be permitted.
Page 13 DOCUMENT 09 68 13
(2) Remove and replace rejected carpeting with new carpeting. At the completion of the work, remove covering, vacuum clean carpeting and remove soiling and stains (if any) to the satisfaction of County.
C. Touch-up, repair or replace damaged products before Substantial Completion.
3.08. Closeout
A. Final Acceptance: Complete the following items prior to final acceptance:
(1) Remove temporary protection
(2) Complete final cleaning
(3) Deliver attic stock
(4) Submit closeout documents
(5) Repair deficiencies
END OF DOCUMENT
Abide
Coordinating Products
Packaging
Collection Abide & Inhabit
Style Number 4107V
Construction Heavy Commercial Luxury Vinyl Tile
Class / ASTM F1700 Class III, Type B
Finish ExoGuard+®
U.S. Metric
Nominal Dimensions 7 in w x 47 in l 18 cm w x 120 cm l
Actual Dimensions 7.09 in w x 47.24 in l 18.01 cm w x 119.99 cm l
Wear Layer Thickness 20 mil (0.02 in) 0.51 mm
Overall Thickness 0.098 in 2.5 mm
Edge Profile Squared Edge
Installation Type Dry Back
Installation Direct Glue
Recommended Adhesive
2200 1 Gallon, 2200 4 Gallon, 4151, 4200 1 Gallon, 4200 4 Gallon, 4252 (No Heavy Rolling or Static Loads) or S150-95
Pieces per Carton 18 pcs
Area per Carton 41.85 ft² 3.89 m²
Weight per Carton 38.64 lbs 17.53 kg
Area per Pallet 2511 ft² 233.28 m²
Boxes per Pallet 60 boxes
Recommended Installation Method
Brick
Ashlar
Herringbone
Stagger
Sheet: Inhabit Sheet
Performance + Testing
Test Reports may be included or listed by the manufacturing/inventory style number as opposed to the noted selling style number.
Static Load (ASTM F970) Passes (Modified), *1500 lbs
Residual Indentation (ASTM F1914) Passes
Resistance to Heat (ASTM F1514) Passes
Resistance to Light (ASTM F1515) Passes
Resistance to Chemicals (ASTM F925) Passes
Radiant Panel (ASTM E648) Passes, Class I
Coefficient of Friction (ASTM D2047, Slip Resistance)
>0.6, meets the recommended static coefficient of friction for ADA walking surfaces and accessible routes
*This test is intended to compare relative properties of different styles and constructions. Results are based on a laboratory test and used for comparative purposes - real life load limit may vary.
Corporate Headquarters +1 800 257 7429 | +1 706 532 7984 | Atlanta +1 404 853 7429 | Bengaluru +91 80 6773 0202 | Beijing +86 10 6568 588 | Chicago +1 312 467 1331 | Dubai +971 4 584 6956 | Hong Kong +852 2623 0371 | London +44 207 961 4120 | Los Angeles +1 800 233 1614 | Melbourne +61 3 9939 8543 | Mexico City +55 5010 7600 | Mumbai +91 22 6284 5050 | Nantong +86 400 800 7429 | New York +1 212 953 7429 | Paris
+33 (0) 1 81 22 44 39 | San Francisco +1 415 955 1920 | Shanghai +86 21 3338 4000 | Singapore +65 6733 1811 | Sydney +61 800 556 302
© 2026 Shaw Industries Group, Inc., a Berkshire Hathaway Company
June 30, 2026
For reference purposes only if printed or downloaded.
https://pdmsview.shawinc.com/viewer/test-result/9b822dea-4de1-41b6-b7ce-64c73e5aac2f https://pdmsview.shawinc.com/viewer/test-result/4e81e4af-39fb-4346-b13f-4d65e28aec9a https://pdmsview.shawinc.com/viewer/test-result/92acdc12-f056-4094-8400-9cd3529b4d15 https://pdmsview.shawinc.com/viewer/test-result/63bb83cb-19fe-479b-ae93-b7b0728dc493 https://pdmsview.shawinc.com/viewer/test-result/3ff11d44-8870-40ef-aba8-31d12c98a78a https://pdmsview.shawinc.com/viewer/test-result/043740ca-288d-4642-92f3-3a4ef2272c6e https://pdmsview.shawinc.com/viewer/test-result/3d0ef041-19d6-4c6c-b2b0-ad8b2be4770c https://pdmsview.shawinc.com/viewer/test-result/3d0ef041-19d6-4c6c-b2b0-ad8b2be4770c
Warranties
Diversity & Inclusion
We promote supplier participation that is reflective of Shaw Industries' diverse customer base and local community. We believe having a strong Supplier Diversity Program is strategic for bringing more innovation to our businesses and opening new markets for growth.
Material Health & Environmental Certifications
Health & Wellbeing
Climate Impact
Works With WELL | WELL V2 Contribution Credit
15 Year Commercial Limited Warranty
Commercial Limited Underbed Bond Warranty
Material & Ingredient Transparency Health Product Declaration (HPD) | 1000 ppm Disclosure
Indoor Air Quality FloorScore® | Certified
Environmental Product Declaration (EPD) 3rd Party Certified in Accordance with ISO 14025, EN 15804, & ISO 21930:2017
Embodied Carbon (Cradle to Gate) 6.05 Kg Co₂/M²
Life-Cycle Carbon Emissions Low Embodied Carbon
Total Recycled Content 0% (Pre-Consumer 0% | Post-Consumer 0%)
Global Product Assessment GSA | Approved
CE Marking (EN 14041) | 3rd Party Certified
Country of Origin | South Korea
X01 Fundamental Material Precautions Part 1: (C): Restrict Asbestos Precondition
Absence of Asbestos
X08 Hazardous Material Reduction Part 1: Limit Hazardous Materials Optimization
Absence of Heavy Metals
X10 Volatile Compound Reduction Part 1 (A): Manage Volatile Organic Compounds (VOCs) Optimization
Absence of Halogenated Flame Retardants
X10 Volatile Compound Reduction Part 2: Manage Semi-Volatile Organic Compounds (SVOCs) Optimization
Ortho-Phthalates
X11 Long Term Emissions Control Part 2: Flooring Optimization
FloorScore Certificate
X14 Material Transparency Part 1: Promote Ingredient Disclosure Optimization
Health Product Declaration (HPD) | 1000 Ppm Disclosure
Corporate Headquarters +1 800 257 7429 | +1 706 532 7984 | Atlanta +1 404 853 7429 | Bengaluru +91 80 6773 0202 | Beijing +86 10 6568 588 | Chicago +1 312 467 1331 | Dubai +971 4 584 6956 | Hong Kong +852 2623 0371 | London +44 207 961 4120 | Los Angeles +1 800 233 1614 | Melbourne +61 3 9939 8543 | Mexico City +55 5010 7600 | Mumbai +91 22 6284 5050 | Nantong +86 400 800 7429 | New York +1 212 953 7429 | Paris
+33 (0) 1 81 22 44 39 | San Francisco +1 415 955 1920 | Shanghai +86 21 3338 4000 | Singapore +65 6733 1811 | Sydney +61 800 556 302
© 2026 Shaw Industries Group, Inc., a Berkshire Hathaway Company
June 30, 2026
For reference purposes only if printed or downloaded.
https://pdmsview.shawinc.com/viewer/document/doc/12278 https://pdmsview.shawinc.com/viewer/document/doc/36104?
https://pdmsview.shawinc.com/viewer/document/doc/30531 https://pdmsview.shawinc.com/viewer/document/doc/20675 https://pdmsview.shawinc.com/viewer/document/doc/33196 https://pdmsview.shawinc.com/viewer/document/doc/33196
Leed v4 Contribution Credits
Additional Information
**Meets or exceeds all local and national regulations in country of manufacture.
Available Colorways
Conch Shell Oak 07140
LRV 31.4 | L* 62.8
V3 - Moderate Variation
Heirloom Oak 07150
LRV 22.9 | L* 54.92
V3 - Moderate Variation
Maize Wenge 07210
LRV 33.5 | L* 64.52
V2 - Slight Variation
Wheat Oak 07220
LRV 32.6 | L* 63.86
V3 - Moderate Variation
Tahini Oak 07240
LRV 27 | L* 58.95
V3 - Moderate Variation
Caramel Wenge 07250
LRV 22.7 | L* 54.73
V2 - Slight Variation
Cadmium Oak 07515 V3 - Moderate Variation
Anise Oak 07570
LRV 13.4 | L* 43.36
V4 - Substantial Variation
Spiced Oak 07630
LRV 13.9 | L* 44.11
V4 - Substantial Variation
Palomino Oak 07660
LRV 20.3 | L* 52.14
V3 - Moderate Variation
Brushed Suede Oak 07700
LRV 13.4 | L* 43.36
V4 - Substantial Variation
Allspice Walnut 07710
LRV 12.2 | L* 41.53
V3 - Moderate Variation
Coriander Oak 07720
LRV 20.6 | L* 52.5
V3 - Moderate Variation
Gabon Wenge 07730
LRV 10.9 | L* 39.35
V2 - Slight Variation
Chocolate Walnut 07760
LRV 9.3 | L* 36.48
V3 - Moderate Variation
Raw Umber Oak 07780
LRV 9.3 | L* 36.58
V3 - Moderate Variation
MR Credit: Building Product Disclosure and Optimization Material Ingredients - Option 1: Material Ingredient Reporting
Health Product Declaration (HPD) | 1000 Ppm Disclosure
MR Credit: Building Product Disclosure and Optimization Environmental Product Declarations - Option 1: Environmental Product Declaration (EPD)
3rd Party Certified in Accordance with ISO 14025, EN
15804, & ISO 21930:2017
EQ Credit: Low Emitting Materials Option 1: Product Category Calculations
FloorScore Certified
Installation Guidelines
Maintenance Guidelines Please visit www.shawcontract.com for the most current warranty information.
Specifications are subject to nominal manufacturing variance. Material supply and/or manufacturing processes may necessitate changes without notice.
This product is an exclusive design and may not be duplicated in any manner. Use of this design in the creation of another product design is also strictly prohibited.
Visit shawcontract.com/testing for more information.
Corporate Headquarters +1 800 257 7429 | +1 706 532 7984 | Atlanta +1 404 853 7429 | Bengaluru +91 80 6773 0202 | Beijing +86 10 6568 588 | Chicago +1 312 467 1331 | Dubai +971 4 584 6956 | Hong Kong +852 2623 0371 | London +44 207 961 4120 | Los Angeles +1 800 233 1614 | Melbourne +61 3 9939 8543 | Mexico City +55 5010 7600 | Mumbai +91 22 6284 5050 | Nantong +86 400 800 7429 | New York +1 212 953 7429 | Paris
+33 (0) 1 81 22 44 39 | San Francisco +1 415 955 1920 | Shanghai +86 21 3338 4000 | Singapore +65 6733 1811 | Sydney +61 800 556 302
© 2026 Shaw Industries Group, Inc., a Berkshire Hathaway Company
June 30, 2026
For reference purposes only if printed or downloaded.
https://pdmsview.shawinc.com/viewer/document/doc/35035 https://pdmsview.shawinc.com/viewer/document/doc/6799 https://shawcontract.com/testing Ramon Davis Rectangle
Corporate Headquarters +1 800 257 7429 | +1 706 532 7984 | Atlanta +1 404 853 7429 | Bengaluru +91 80 6773 0202 | Beijing +86 10 6568 588 | Chicago +1 312 467 1331 | Dubai +971 4 584 6956 | Hong Kong +852 2623 0371 | London +44 207 961 4120 | Los Angeles +1 800 233 1614 | Melbourne +61 3 9939 8543 | Mexico City +55 5010 7600 | Mumbai +91 22 6284 5050 | Nantong +86 400 800 7429 | New York +1 212 953 7429 | Paris
+33 (0) 1 81 22 44 39 | San Francisco +1 415 955 1920 | Shanghai +86 21 3338 4000 | Singapore +65 6733 1811 | Sydney +61 800 556 302
© 2026 Shaw Industries Group, Inc., a Berkshire Hathaway Company
June 30, 2026
For reference purposes only if printed or downloaded.
Natural Form PRODUCT SPECIFICATIONS
Performance Testing
Test Reports may be included or listed by the manufacturing/inventory style number as opposed to the noted selling style number.
Warranty
Please visit patcraft.com for the most current warranty information.
COLLECTION BioSymmetry
STYLE NUMBER I0499
PRODUCT TYPE Tile
CONSTRUCTION Multi-Level Pattern Loop
FIBER TYPE EcoSolution Q® Nylon
DYE METHOD 100% Solution Dyed
PRIMARY BACKING Non-Woven Synthetic
SECONDARY BACKING StrataWorx® Tile
PROTECTIVE
TREATMENTS SSP® Shaw Soil Protection
GSA APPROVED
PRODUCT Yes
US Units Metric Units
PRODUCT SIZE 24 inches x 24 inches 60.96 cm x 60.96 cm
AREA PER BOX 80 ft² | 8.89 yd² 7.43 m²
PIECES PER BOX 20
GAUGE 1/10 inches 39.37 per 10 cm
STITCHES 10.83 per inches 42.65 per 10 cm
FINISHED PILE THICKNESS 0.08 inches 2.03 mm
AVERAGE DENSITY 6750 oz/yd³ 0.25 g/cm³
KILOTEX 8.89
TOTAL THICKNESS 0.241 inches 6.12 mm
TUFTED YARN WEIGHT 15 oz/yd² 508.59 g/m²
PILL TEST Pass
RADIANT PANEL Class I
NBS SMOKE Less than 450
ELECTROSTATIC PROPENSITY Less than 3.5 kv
CRI GREENLABEL PLUS GLP2671
ADA COMPLIANCE >0.6, meets the recommended static coefficient of friction for ADA walking surfaces and accessible routes
WEAR RATING (ASTM D5252) Heavy
Carpet Tile 15 Year Commercial Limited Warranty with Stain and Color for StrataWorx
PAT C R A F T. CO M / @ PAT C R A F T F L O O R S / 8 0 0 . 2 4 1 . 4 0 1 4
© 2026 Shaw Industries Group, Inc., a Berkshire Hathaway Company
For reference purposes only if printed or downloaded.
https://patcraft.com/ https://pdmsview.shawinc.com/viewer/test-result/50d91903-6f4d-4bdf-9fc1-1f4f98ca0f64 https://pdmsview.shawinc.com/viewer/test-result/5fdc0c6a-d6c7-4a5e-b305-180d48cfeefd https://pdmsview.shawinc.com/viewer/test-result/c52ba1e6-9e37-466a-a021-fe38c029054b https://pdmsview.shawinc.com/viewer/test-result/bd2e5126-06fc-4b12-af25-727b3efd8858 https://pdmsview.shawinc.com/viewer/document/doc/14683?
Natural Form
Installation Methods
Quarter Turn Random Monolithic Brick Ashlar
Environmental Specifications
Materials
Meets or exceeds all local and national regulations in country of manufacture. Manufactured in an ISO9001 & ISO14001 certified facility or equivalent. Recycled content is calculated using system allocation, mass balance, and direct insertion. The actual recycled content in this product will likely vary. For more information email info@patcraft.com.
Third Party Certifications
Carpet Tile Installation Guidelines
Maintenance Guidelines
RECYCLABILITY 100% recyclable
Ingredients DOES NOT CONTAIN does not contain PVC, phthalates or PBD/PBDE
Recycled Content
TOTAL RECYCLED CONTENT (BY WEIGHT) 24%
PRE-CONSUMER 24%
POST-CONSUMER 0%
COUNTRY OF ORIGIN (MANUFACTURER) USA
CRADLE TO CRADLE CERTIFIED® Silver Level (Version 3.1)
HEALTH PRODUCT DECLARATION (HPD) 1,000 ppm Disclosure
ENVIRONMENTAL PRODUCT DECLARATION (EPD) 3rd Party Certified in Accordance with ISO14044, ISO14025 &
EN15804
NSF 140 Gold
CRI GREEN LABEL PLUS (GLP) GLP9968
USGBC LEED contributes
Specifications are subject to nominal manufacturing variances. Material supply and/or manufacturing processes may necessitate specification changes without notice. This carpet is an exclusive design and may not be duplicated in any manner. Use of this design in the creation of another carpet design is also strictly prohibited. Visit patcraft.com/testing for more information.
PAT C R A F T. CO M / @ PAT C R A F T F L O O R S / 8 0 0 . 2 4 1 . 4 0 1 4
© 2026 Shaw Industries Group, Inc., a Berkshire Hathaway Company
For reference purposes only if printed or downloaded.
https://pdmsview.shawinc.com/viewer/document/doc/1212 https://qmsview.shawinc.com/viewer/doc/942 https://pdmsview.shawinc.com/viewer/document/doc/10175 https://qmsview.shawinc.com/viewer/doc/6440 https://qmsview.shawinc.com/viewer/doc/16083 https://qmsview.shawinc.com/viewer/doc/16083 https://qmsview.shawinc.com/viewer/doc/4537 https://qmsview.shawinc.com/viewer/doc/6501 https://patcraft.com/testing/
Natural Form
Available Colorways
MOUNTAIN
SHADOW 00450
STONE HEARTH
00550
ECHO 00585 VALLEY 00700 TREE LINE 00705 HILLTOP 00760
Quick Ship PDQ - 10 Business Days/max 2,500 sq yd per color
PAT C R A F T. CO M / @ PAT C R A F T F L O O R S / 8 0 0 . 2 4 1 . 4 0 1 4
© 2026 Shaw Industries Group, Inc., a Berkshire Hathaway Company
For reference purposes only if printed or downloaded.
Ramon Davis Rectangle
File details come from the government source that posted it. Updated .