EXHIBIT A - SCOPE OF SERVICES.pdf

PDF 121 KB Posted

Attached to
As-Needed Battery Supply and Install
Solicitation number
PS139177
Issued by
California

About this file

Scope of Services Summary

This document is a Scope of Services exhibit for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract issued by the Los Angeles County Metropolitan Transportation Authority (LACMTA). LACMTA seeks a qualified contractor to provide comprehensive, on-call battery system replacement, testing, and support services across its rail system. The work encompasses removal, replacement, installation, testing, commissioning, and disposal of battery systems supporting Metro Rail Signals, Traction Power, Facilities Maintenance, and Rail Communications at various facilities including traction power substations, signal houses, communication rooms, stations, yards, and underground light rail locations throughout the LACMTA service area. The contract covers numerous battery configurations across multiple lines (A, B/D/RC, C, E, and K lines) with varying capacities ranging from 5 ampere-hours to 600 ampere-hours and quantities totaling hundreds of units. The contract has a period of performance of 24 months from notice to proceed, with three one-year renewal options available. Work will be authorized on an as-needed basis through individual task orders issued by Metro, with no work proceeding without an executed task order.

The contractor must possess a California C-10 Electrical Contractor License and comply with Metro Rail Design Criteria, NFPA standards, IEEE standards, California seismic requirements, and applicable federal, state, and local regulations. The contractor is responsible for furnishing all labor, materials, tools, equipment, transportation, supervision, and incidentals required to perform the work. Required submittals include equipment technical data, installation plans, work plans, cutover plans, test plans, warranty information, and as-built documentation. All batteries and related equipment must carry the manufacturer's standard warranty, with warranty documentation assigned to LACMTA. Metro will provide site access, coordinate system outages, issue track allocation approvals, and supply available as-built documentation. The contractor must perform impedance, load, and capacity testing; conduct site assessments; prepare wiring diagrams; dispose of depleted batteries in compliance with EPA and CAL-OSHA regulations; and update Metro's asset inventory following replacements.

View the file

Other files

File Type Posted
EXHIBIT 8 - ETHICS DECLARATION.pdf PDF
EXHIBIT 5 - PROPOSAL LETTER.pdf PDF
EXHIBIT 12.1 - PREVAILING WAGES.pdf PDF
EXHIBIT D - DEOD CONTRACT COMPLIANCE MANUAL (Non-Fed).pdf PDF
EXHIBIT H - MISCELLANEOUS (RESERVED).pdf PDF
EXHIBIT 10 - CERTIFICATE OF COMPLIANCE WITH 49 CFR PART 655.pdf PDF
EXHIBIT 11 - NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY PROPOSER.pdf PDF
EXHIBIT 2.1 - FORM 60 INSTRUCTIONS - PROFESSIONAL SERVICES PRICE SUMMARY.pdf PDF
RFP PS139177.pdf PDF
EXHIBIT E-1 - PAYMENT CERTIFICATION (CONTINUOUS).pdf PDF
EXHIBIT G - APPROVED SUBCONTRACTORS AND SUPPLIERS.pdf PDF
EXHIBIT F - RELEASE OF CLAIMS.pdf PDF
EXHIBIT A-1 - TASK ORDER.pdf PDF
EXHIBIT 3 - EVALUATION CRITERIA.pdf PDF
EXHIBIT 4 - LIST OF CERTIFIED FIRMS.pdf PDF
EXHIBIT 6 - LIST OF CURRENT CONTRACTS - BACKLOG.pdf PDF
EXHIBIT 12 - MISCELLANEOUS (RESERVED).pdf PDF
EXHIBIT 7 - LIST OF COMPLETED CONTRACTS - LAST FIVE (5) YEARS.pdf PDF
EXHIBIT 9 - GENERAL CERTIFICATIONS.pdf PDF
EXHIBIT 2 - SCHEDULE OF QUANTITIES AND PRICES.xls XLS spreadsheet
EXHIBIT 2.2 - FORM 60 - PROFESSIONAL SERVICES PRICE SUMMARY.xls XLS spreadsheet
EXHIBIT 12 - DIR PUBLIC WORKS VERIFICATION FORM.pdf PDF
EXHIBIT B - PRICING AGREEMENT.pdf PDF
EXHIBIT E-2 - PAYMENT CERTIFICATION (FINAL).pdf PDF
EXHIBIT J - 29 CFR 5.5.pdf PDF
EXHIBIT I - RESERVED.pdf PDF
EXHIBIT C - WORK-COMPLETION_DELIVERABLE SCHEDULE (RESERVED).pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A – SCOPE OF SERVICES

PS139177 – AS-NEEDED BATTERY SUPPLY AND INSTALL

PART 1 - GENERAL

1.01 DESCRIPTION

A. The Los Angeles County Metropolitan Transportation Authority (Metro or LACMTA) is seeking a qualified Contractor to provide comprehensive, on-call battery system replacement, testing, and support services under an Indefinite Delivery/Indefinite Quantity (IDIQ) Contract. This Contract is a standalone IDIQ and is not dependent upon any other Metro IDIQ contracts.

1. Battery system includes batteries and battery chargers.

2. UPS equipment is handled under a separate contract, however, if a UPS system is deemed defective and in critical need of replacement at the time of battery replacement, this IDIQ could serve as a mechanism for its replacement.

3. Battery racks are to be reused where feasible. If a battery rack is deficient and is required to be replaced with the new batteries, this IDIQ shall serve as a mechanism for its replacement.

B. The Work includes removal, replacement, installation, testing, commissioning, and disposal of battery systems supporting Metro Rail Signals, Traction Power, Facilities Maintenance, and Rail Communications across the LACMTA system, including underground light rail locations. Work will be authorized on an as-needed basis through individual Task Orders issued by Metro.

C. The Contractor shall furnish all labor, materials, tools, equipment, transportation, supervision, and incidentals required to perform the Work in accordance with Metro requirements, industry standards, applicable codes, and this Scope of Work.

1. This IDIQ project is looking to pre-qualify battery system suppliers/vendors for a period of performance of 24 months from notice to proceed (NTP), with three, one-year options.

D. This is an IDIQ Contract. Metro will issue Task Orders defining the specific scope, locations, quantities, schedules, and performance requirements. No Work shall proceed without an executed Task Order.

1.02 PROJECT LOCATION

A. Battery systems covered under this Contract are installed at various Metro Rail facilities, including but not limited to, traction power substations, signal houses, communication rooms, stations, yards, underground light rail locations and maintenance facilities throughout the LACMTA service area.

1. See Table below for list of locations with battery systems to be covered as part of this IDIQ:

No. Line Description Capacity (AH) Cells Quantity

A Line

Signals 200 6 8

2 Signals 250 6 2

3 Signals 265 6 99

4 Signals 400 6 100

5 Signals 500 6 4

6 Signals 500 7 33

7 Traction Power 210 56 45

8 Facilities 220 108 100

9 Rail Comms 600 24 30

B/D/RC Line

Signals 400 14 47

11 Signals 600 14 8

12 Rail Comms 5 4 7

C Line

Signals 152 13 20

14 Traction Power 210 56 19

E Line

Signals 400 80 16

16 Signals 265 6 40

17 Signals 500 7 16

18 Traction Power 210 56 25

K Line

Signals 152 13 20

20 Traction Power 210 56 10

1.03 STANDARDS AND REQUIREMENTS

A. All Work shall comply with:

1. Metro Rail Design Criteria (MRDC)

2. NFPA 70 and 70E

3. IEEE 1188 and IEEE 450

4. California Code of Regulations (CCR) Title 24 Seismic Requirements

5. Applicable Federal, State, and Local laws and regulations

6. Manufacturer recommendations

B. The contractor shall possess a California C-10 Electrical Contractor License.

1.04 SUBMITTALS

A. Submittal procedures may be issued with specific Task Orders and may vary from what is listed below.

B. Below is a list of anticipated required submittals:

1. Contract Data Requirements List (CDRL): The Contractor shall submit a CDRL that lists all submittals required under the contract.

2. Equipment Technical Data and Product Literature

3. Equipment technical specifications (cutsheets)

4. Mounting Details

5. Detailed Parts List

6. Material Safety Data Sheets (MSDS)

7. Installation Plans

8. Work Plan

a. The Contractor shall submit a Work Plan to Metro for approval.

b. No construction shall be permitted prior to Metro's approval of the submitted Work Plan.

9. Cutover Plan

a. The Contractor shall submit a Cutover Plan to Metro for approval.

b. No cutover work shall be permitted prior to Metro's approval of the submitted Cutover Plan.

1) The Cutover Plan shall include identification of all disruptions to existing service including shutdowns, degraded service, and bus bridging.

2) The Cutover Plan shall identify all Metro resources needed in support of the cutover.

3) The Cutover Plan shall include the Contractor’s proposed work hours.

4) The Cutover Plan shall demonstrate that fire and life safety systems are not impacted by the work during each step of the cutover.

5) The Cutover Plan shall demonstrate the configuration and functionality of all impacted railroad systems during each step of the cutover.

6) The Cutover Plan shall demonstrate that the failsafe nature of all impacted railroad systems during each step of the cutover.

10. Test Plan

a. The Test Plan shall include Factory Acceptance Tests, Local Field Acceptance Tests, and System Integration Tests as appropriate for the project.

b. The Test Plan shall state the Test Procedures and Test Report Templates will be developed for each test, which shall be submitted per the requirements of the relevant technical specification.

1) Contractor to submit Test report to Metro for approval.

c. In addition to the requirements of the relevant technical specification, when submitted, Test Procedures shall include:

1) Detailed equipment test set-up and functionality being tested.

2) Sequence of test steps with details of actions required, precautions, and expected outcome or results.

3) Criteria by which test will be determined to have succeeded or failed.

4) Direction on how to proceed if the outcome or result of the test or a portion of the test is not as expected.

5) Identification of the individual who is the Responsible Party for signing, dating, and approving or rejecting the test results.

d. Local Field Acceptance Tests shall include, but not be limited to:

1) Verify that each unit has been delivered free of damage and has been properly installed.

2) Verify point-to-point wiring.

3) Verify power distribution.

e. The Test Plan shall detail the sequencing of the tests, including which tests are prerequisites for following tests and must be executed in sequential order.

11. Warranty

a. The Contractor shall submit the original equipment manufacturer’s warranty information and registration for each individual part provided throughout the Task Orders.

12. As-Built documentation in the form of Operation and Maintenance Manuals

1.05 SCHEDULE

A. Schedules and durations shall be defined in each Task Order and coordinated with Metro Operations Engineering.

B. Work Hours and Track Access

1. Work may occur during normal business hours unless otherwise restricted

2. Work impacting critical systems shall occur during non-revenue hours

3. Track Allocation approval is required for work affecting rail operations No work shall occur during Metro-designated holidays without approval.

PART 2 - PRODUCT

2.01 EQUIPMENT

A. The equipment listed in this section is broken down by user group. The equipment listed below is for reference only so the Contractor can address familiarity with each system and component. New equipment to be purchased and installed must meet the LACMTA Design Criteria, Metro’s Technical Specifications that will be provided per each Task Order, and be approved by the maintaining user group.

Please see items B-E for the typical battery system for each of the listed different user groups.

Note: the following battery types mentioned below in (B), (C), (D), and (E) are typical and provided for reference only. Actual configurations will vary, and this information should not be considered a requirement or exact representation.

Metro may accept equivalent/alternate substitutions with prior approval from the Metro Project Manager or their designee. Alternative could include Li-Ion BESS style battery systems. These requirements will be addressed in specific Task Orders.

B. Traction power

1. TPSS battery system: 210AH, VRLA. Batteries (GNB 50G07 or approved equal). Batteries provide a nominal output voltage of 130V.

C. UPS battery system: Typical UPS rated at 80~100kVA. 400AH, VRLA (Absolyte 100G29 or approved equal). Batteries provide a nominal voltage of 480V.Signals:

1. Wayside battery system: sealed lead acid

a. EnerSys PowerSafe DDR 50-17 or approved equal)

b. Batteries provide a nominal voltage 12V

2. UPS battery system:

a. Typical UPS rated 10~40kVA. 200AH, VRLA

b. Absolyte 100G29 or approved equal

c. Batteries provide a nominal voltage of 240V.

D. Facilities Maintenance:

1. Facilities battery system:

a. 210AH, VRLA. Batteries

b. GNB 50G07 or approved equal

c. Batteries provide a nominal output voltage of 130V.

2. UPS battery system:

a. Typical UPS rated 10~40kVA. 300W,VRLA

b. UPS12-300MR or approved equal

c. Batteries provide a nominal voltage of 480V

E. Rail Communications

1. TCC battery system:

a. 600AH, sealed lead acid C&D Technologies msEndur II AT-11P or approved equal

2. TCC UPS battery system:

a. Typical UPS rated 10~40kVA. 200AH, sealed lead acid

b. GNB S12V550NGF or approved equal

F. Battery Racks shall be reused where possible. In the event replacement batteries do not fit the footprint of the existing rack, a new battery rack system shall be procured with an appropriate spill containment mat/pan as described below.

1. Batteries shall be provided with structural steel support racks that meet the support requirements of the batteries used. Battery racks shall be provided with insulating plastic strips to cover all supports, hold downs, and restraining rails that are in contact with the battery cells.

2. Racks shall be treated with acid-resistant finish paint coat.

G. Spill Containment: Electrolyte resistant plastic mat or spill containment pan shall be provided under each battery rack, extending not less than 12 inches outside the rack in front and not less than 2 inches on each side. The back of the rack shall be placed against the wall of the enclosure and insulated from the building wall.

H. Nameplates: Each battery cell container shall be marked with the following information:

1. Manufacturer’s name.

2. Month and year of manufacture.

3. Cell type.

I. Accessories: One set of the following accessories shall be provided for each battery.

1. Battery logbook

2. Set of special tools

3. Set of cell identification numbers

J. Main battery Fused Disconnect Switch may be replaced only where the fused disconnect switch is found to be inoperable. Fuses shall comply with NEMA FU 1 and shall provide short circuit protection for the battery and main cables to the dc distribution panel board. Disconnect switches shall be mounted adjacent to the battery rack and shall be double pole with removable fuse links.

K. All batteries racks shall be complied with the seismic zone 8 requirement

2.02 METRO-PERFORMED WORK

A. Metro may perform the following as needed:

1. Provide site access and escorts

2. Coordinate system outages and operational windows

3. Provide Track Allocation approvals

4. Provide available as-built documentation

2.03 CONTRACTOR DUTIES

A. The Contractor shall:

1. Perform impedance, load, or capacity factory testing as required

2. Provide all tools, parts, consumables, and equipment required for Work

3. Maintain safe Work practices and comply with Metro RWP requirements

4. Coordinate Work with Metro to avoid service impacts

5. Maintain accurate documentation and ensure configuration control

2.04 CONTRACTOR’S USE OF WORKSITE

A. The Contractor shall:

1. Confine operations to Metro-designated areas as are defined in the Task Order contract.

2.05 BATTERY TESTING, REPLACEMENT, AND DISPOSAL

A. The Contractor shall:

1. Conduct site assessments

2. Prepare installation plans and wiring diagrams

3. Install Battery Charger units and associated equipment

4. Complete battery system replacement within timeframes defined by Task Order

a. Perform acceptance testing and commissioning

1) Perform impedance, load, or capacity testing

b. Provide proper disposal and recycling documentation. Remove and properly dispose of depleted batteries in compliance with EPA, CAL- OSHA, and local regulations

1) Provide Metro with certified recycling and disposal documentation

c. Update Metro’s asset inventory following replacements

B. Installation Requirements:

1. Battery racks shall be reused where feasible and when approved by Metro

2. Replacement racks shall include spill containment and seismic restraint

3. Battery rack height shall not exceed four (4) feet (unless approved by Metro)

4. All conduits and cabling shall comply with NEC requirements

5. Materials shall be new, defect-free, and suitable for the intended application

6. Battery cells shall be assembled on the battery racks and given an equalizing charge.

2.06 INTEGRATION SUPPORT

A. The Contractor shall support integration with Metro systems, including:

1. SCADA interface verification

2. Alarm configuration and mapping

3. Communications setup (TCP/IP, serial, SNMP, or vendor protocols)

4. Submission of configuration files, network settings, and as-built documentation

PART 3 - EXECUTION

3.01 TESTING REQUIREMENTS

A. Testing shall comply with applicable IEEE standards, UL, NEMA, NFPA, NETA and Metro procedures.

B. Testing activities include:

1. Battery capacity/impedance testing

2. Functional testing of Battery Charger and equipment

3. Acceptance testing of battery system

4. Verification of alarms, monitoring links, and communications

C. Test procedures and test reports shall be submitted for Metro review.

3.02 WARRANTY

A. All batteries and related equipment installed under this Contract shall carry the manufacturer’s standard warranty. Warranty documentation shall be submitted to Metro and assigned to LACMTA.

B. Warranties, guarantees, entitlement, or other rights associated with ownership and use of the equipment shall be assigned to Metro

END OF STATEMENT OF WORK