Exhibit A_CDRL_A018_Contract Work Breakdown Structure_Final_9Dec2021.pdf
PDF 285 KB Posted
- Attached to
- Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL Federal contract opportunity
- Solicitation number
- FA4610-22-R-0001
About this file
This Request for Proposal solicits offers for a Launch Operations Support Contract to provide facilities support services at Vandenberg Air Force Base in California. Offerors must submit proposals by 27 January 2022 for consideration. The North American Industry Classification System code for this effort is 561210 with a small business size standard of $41.5 million. The incumbent contractor will provide maintenance, utilities, and other base operations functions in support of space launch activities. The contract value and period of performance are not specified. The solicitation includes attachments outlining security requirements, labor standards, and contractor forms for staffing plans, subcontracting consent, and organizational conflict of interest mitigation.
View the file
Other files for this federal contract opportunity
Show all 50
Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO.
FA4610-22-R-0001
F. CONTRACTOR
1. DATA ITEM NO.
A018
2. TITLE OF DATA ITEM
Contract Work Breakdown Structure
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81334D
5. CONTRACT REFERENCE
PWS 2.3.5
6. REQUIRING OFFICE
SLD30/PMD
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
F
10. FREQUENCY
ANNLY
12. DATE OF FIRST SUBMISSION
5 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
10 DAR Draft
Final
Reg Repro
16. REMARKS
Blk 5: The breakdown when building and reporting must go show down to the third level of support, i.e.,
(3) Maintenance (3.1) Civil Maintenance
(3.1.1) Utilities
Blk 10: The government has 30 days to review initial draft, and 15 days for revisions.
The contractor has 10 days, after receipt of government comments, to prepare and deliver the final data. Criteria for approval shall be correct content and format.
Blk 12: Due 20 days before contract start, (20 days before phase in ends), or the next workday if the 20th day is a weekend or federal holiday.
Blk 13: Due on the next workday if the 10th day is a weekend or federal holiday.
Submit data in an electronic Microsoft file or other file, readable by addressee The government has 30 days to review initial draft, and 15 days for revisions. The contractor has 10 days, after receipt of government comments, to prepare and deliver the final data.
Criteria for approval shall be correct content and format.
SLD30/PMD 0 1 0
30 CES/CERF 0 1 0
30 CPTS/FMA 0 1 0
30 CONS/PKD 0 1 0
15. TOTAL 0 4 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: MGMT
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages Reset
DD FORM 1423-1 (BACK), FEB 2001
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
File details come from the government source that posted it. Updated .