EXHIBIT 2 - SCHEDULE OF QUANTITIES & PRICES.pdf
PDF 86 KB Posted
- Solicitation number
- OP1435688370
- Issued by
- California
About this file
Summary
This is an Exhibit 2 Schedule of Quantities & Prices for IFB No. OP1435688370, an artificial ivy installation and maintenance contract for what appears to be a transit authority (likely Los Angeles Metro based on station references). The contract encompasses routine maintenance services for artificial ivy installations at existing locations across the A, E, and K transit lines, as well as a future location at Ramona Gardens Housing Development in the Metrolink San Bernardino Sub-division. Existing maintenance locations include 13 sites ranging from 500 to 18,800 square feet, with services to be performed every other month. The contract also includes as-needed labor and material services, with an estimated 30 monthly labor hours and $36,000 in annual material costs for contingency work. The contract is structured as a three-year base term with all quoted unit rates remaining firm throughout the contract period.
All costs are presented as fully burdened hourly rates that include materials, labor, equipment, taxes, insurance, travel time, company overhead, and applicable fees and profit. Proposers must provide monthly costs, annual costs, and three-year base costs for routine maintenance at each location, as well as labor rates for as-needed services. The document includes a contract cost summary section that totals routine maintenance costs for existing locations, future location maintenance costs, and three-year as-needed service costs to establish the total contract value. Quantities listed are for proposal assessment purposes only with no minimum or maximum guarantees or implied commitments. Any additional material or labor hours necessary for initial installation will be charged according to the submitted schedule of quantities and prices.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposer
IFB No. OP1435688370
ARTIFICIAL IVY INSTALLATION & MAINTENANCE
EXHIBIT 2 - SCHEDULE OF QUANTITIES & PRICES
Quantities listed herein are not to be construed as a commitment, and are to be used for proposal assessment purposes only. No minimum or maximum is guaranteed or implied. All unit rates as quoted will remain firm for the term of this contract.
Fully burdened hourly rates shall include all materials, labor, equipment, taxes, insurance, travel time, company's overhead along with any applicable fees and profit. Any additional material or labor hours necessary for the initial installation will apply in accordance with the Schedule of Quantities and Prices shown above.
EXISTING LOCATIONS
ROUTINE MAINTENANCE SERVICES (EVERY OTHER MONTH)
No. Location (A)
Monthly Cost (B)
Annual Cost (A x 12)
(C) Three (3) Year
Base Cost (B x 3)
1 A Line - Firestone Station (5,500 Sq. Ft.) $ $ $
2 A Line - Slauson Station (5,700 Sq. Ft.)
3 A Line - Sound-wall on Del Mar Ave.
(18,800 Sq. Ft.)
4 E Line - Indiana Station (5,000 Sq. Ft.)
5 A Line - Southwest Museum Station (2,000 Sq. Ft.)
6 A Line - Lincoln Cypress Station (2,000 Sq. Ft.)
7 A Line – Compton ROW (5,000 Sq. Ft.) $ $ $
8 E Line – La Brea Station (1,000 Sq. Ft.) $ $ $
9 E Line – Jefferson/National ROW (1,000 Sq. Ft.) $ $ $
10 E Line – Western Station C&S (500 Sq. Ft.) $ $ $
11 E Line – Soto Station TPSS (1,200 Sq. Ft.) $ $ $
12 A Line – Vignes Flyover Bridge (1,300 Sq. Ft.) $ $ $
13 K Line – Rail to Rail Bike Path (17,000 Sq. Ft.) $ $ $
(D) Total Three (3) Year Base Routine Maintenance Cost $
Quantities listed herein are not to be construed as a commitment, and are to be used for proposal assessment purposes only. No minimum or maximum is guaranteed or implied. All unit rates as quoted will remain firm for the term of this contract.
Fully burdened hourly rates shall include all materials, labor, equipment, taxes, insurance, travel time, company's overhead along with any applicable fees and profit. Any additional material or labor hours necessary for the initial installation will apply
FUTURE LOCATION
ROUTINE MAINTENANCE SERVICES (EVERY OTHER MONTH)
No. Location
(E) Monthly
Cost
(F) Annual Cost
(E x 12)
(G) Three (3) Year
Base Cost (F x 3)
Metrolink San Bernardino Sub-division 1 Ramona Gardens Housing Development (5,600 Sq.Ft.) $ $ $
(H) Total Three (3) Year Base Routine Maintenance Cost $
AS-NEEDED SERVICE (LABOR & MATERIAL)
(I)
Monthly Estimated
Labor Hours
(J) Labor Rate
(K) Monthly
Cost
(L) Total Annual Cost
(K x 12)
Labor (Estimated)
Material (Estimated)
$36,000
Annual Cost As-Needed Cost
(M) Total Three (3) Year As-Needed Cost
Quantities listed herein are not to be construed as a commitment, and are to be used for proposal assessment purposes only. No minimum or maximum is guaranteed or implied. All unit rates as quoted will remain firm for the term of this contract.
Fully burdened hourly rates shall include all materials, labor, equipment, taxes, insurance, travel time, company's overhead along with any applicable fees and profit. Any additional material or labor hours necessary for the initial installation will apply
CONTRACT COST SUMMARY
(D) Total Three (3) Year Routine Maintenance Cost –
Existing Locations $
(H) Total Three (3) Year Base Routine Maintenance Cost – Future Location $
(M) Total Three (3) Year Contract As-Needed Cost
Total Contract Cost (D + H + M)