Exhibit 1-a Cost-Proposal format.xlsx

XLSX spreadsheet 42 KB Posted

Attached to
USCIS TI Construction - AFB Federal contract opportunity
Solicitation number
47PL0122R0004
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This document contains a cost proposal template and instructions for a federal construction project solicitation. The solicitation is for a United States Citizenship and Immigration Services construction project to build out approximately 5,100 square feet of space on the first floor of the Anchorage Federal Building. The scope of work includes HVAC, electrical, fire/life/safety, telecommunications, IT, ceilings, lighting, and structural improvements, as well as demolition and construction of new walls, doors, lights, switches, outlets, casework, offices, a network room, and sound attenuation. Interested vendors must attend a pre-proposal conference on January 11, 2022 and submit completed proposals electronically by February 8, 2022. The NAICS code for this opportunity is 236220 and it is set aside for HUBZone small businesses.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Information

COST PRPOSAL
GENERAL INFORMATION
The purpose of the requested information in the attached worksheets is to assit Government personnel in the review and evaluation of cost proposals submitted by Offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed costs; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. Further, FAR 15.403-4 sets forth those circumstances in which offerors are required to submit certified cost or pricing data.

Total Effort

CodeDescriptionQtyUnitLabor CostMaterial CostSubcontractor CostEquipment Cost
Base/HoursRateExtended $QTYRateExtended $Base/HoursRateExtended $QTYRateExtended $TOTAL
DIVISION 1 - GENERAL CONDITIONS
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 1 General Conditions30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 2 - EXISTING CONDITIONS
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 2 Exisitng Conditions30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 3 - CONCRETE
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 3 Concrete30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 4 - MASONRY
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 4 Masonry30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 5 - METALS
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 5 Metals30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 6 - WOOD, PLASTICS, COMPOSITES
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 6 Wood, Plastics, Composites30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 7 - THERMAL MOISTURE PROTECTION
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 7 Thermal Moisture30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 8 - OPENINGS (DOORS AND WINDOWS)
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 8 Openings30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 9 - FINISHES
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 9 Finishes30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 10 - SPECIALTIES
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 10 Specialties30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 11 - EQUIPMENT
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 11 Equipment30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 12 - FURNISHINGS
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 12 Furnishings30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 13 - SPECIAL CONSTRUCTION
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 13 Special Construction30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 14 - CONVEYING EQUIPMENT
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 14 Conveying Equipment30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 21 - FIRE SUPPRESSION
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 21 Fire Suppression30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 22 - PLUMBING
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 22 Plumbing30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 23 - HVAC
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 23 HVAC30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 25 - INTEGRATED AUTOMATION
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 25 Integrated Automation30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 26 - ELECTRICAL
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 26 Electrical30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 27 - COMMUNICATIONS
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 27 Communications30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY (ESS)
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 28 ESS30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 31- EARTHWORK
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 31 Earthwork30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 32 - EXTERIOR IMPROVEMENTS
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 32 Exterior Improvements30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 33 - UTILITIES
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 33 Utilities30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 34 - TRANSPORTATION
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 34 Transportation30$900.001$100.0030$900.001$100.00$2,000.00
DIVISION 48 - ELECTRICAL POWER GENERATION
0110-0Project Management Submittal & Security Phase (Sample)1LS30$30.00$900.001$100.00$100.0030$30.00$900.001$100.00$100.00$2,000.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Fill-in - add row if needed$0.00$0.00$0.00$0.00$0.00
Total Division 34 Transportation30$900.001$100.0030$900.001$100.00$2,000.00
Other Direct Costs
Materials/SuppliesProvide details on next Worksheet$0.00
EquipmentProvide details on next Worksheet$0.00
TravelProvide details on next Worksheet$0.00
Insert line(s) for any other types of ODCsProvide details on next Worksheet$0.00
Total Other Direct Costs$0.00$0.00
Subtotal Costs$23,400.00$2,600.00$23,400.00$2,600.00$52,000.00
Enter %
Overhead$6,240.0012.00%$6,240.00
Profit$6,988.8012.00%$6,988.80
Total Estimated Costs$65,228.80

&"Arial,Bold"&12&A

Offeror: Page &P of &N Pages &F

Self-Performed Work

CALCLUATION OF SELF-PERFORMED WORK
In accordance with FAR 52.219-14 Limitations on Subcontracting and 13 CFR §125.6, offerors agree that in the case of a contract for construction contractors, no more than 85% of the amount paid by the government to the prime may be paid to firms that are not similarly situated, as indicated below:
OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS
Offeror’s total proposed price$65,228.80
Profit and Fees$13,228.80
Cost of Materials$2,600.00
Offeror’s total cost of performance$49,400.00Total proposed price less profit, fees, and cost of materials
Offeror’s total estimated self-performed cost of contract performance incurred for personnel of the concern’s employees or the employees of subcontracted 8(a) firms (Self-Performed)$26,000.00
Offeror’s percentage of estimated self-performed work52.6%Must be at least 15%
KEY SUBCONTRACTORS
NameProposed $
Subcontractor XYZ$5,000

https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=28ecffbfcc51433405558dc74cf1be8f&term_occur=999&term_src=Title:13:Chapter:I:Part:125:125.6 Materials

DivisionDescriptionMaterial Cost
QTYRateExtended $
3Concrete (Sample)1$100.00$100.00
Fill-in - add row if needed$0.00
Fill-in - add row if needed$0.00
Fill-in - add row if needed$0.00
Fill-in - add row if needed$0.00
Total$100.00