Amendment 47PL0122R0004_A0003.pdf
PDF 581 KB Posted
- Attached to
- USCIS TI Construction - AFB Federal contract opportunity
- Solicitation number
- 47PL0122R0004
About this file
This solicitation seeks proposals for a tenant improvement construction project at the United States Citizenship and Immigration Services (USCIS) facility in Anchorage, Alaska. The General Services Administration will award a firm-fixed price contract to renovate approximately 5,100 square feet on the first floor of the Anchorage Federal Building to relocate the USCIS office from its current leased location. Scope of work includes HVAC, electrical, fire protection, telecommunications infrastructure, IT systems, ceilings, lighting, and partitioning of offices, a network room, and sound attenuation elements. Interested HUBZone small businesses may submit proposals by February 8, 2022 and should direct inquiries to the points of contact by January 21. The pre-proposal conference will be held on January 11 at the project location. This is a HUBZone set-aside.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
R10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
10PQCB2
Rebecca Graham, Contracting Officer
The purpose of this amendment is to:
1) EXTEND RFP Closing date and time from Feb 15, 2022 at 2:00 PM PST to March 4, 2022 at 2:00 PM PST, ...
[See Description of Modification Continuation Page]
10PQCB2
Acquisition Management Division Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA
Acquisition Management Division Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA
EQ10PCPB-22-0003
47PL0122R0004
RWA A5010147
1 2
2/11/2022
12/22/2021
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
47PL0122R0004/0003
Description of Modification Continuation Page
2) PROVIDE three documents titled "1.2 AFB USCIS Sheet A602 January 2022", "2.3 Spec 096519 Resilient Tile Flooring USCIS 100% Specs January 2022", and "2.4 Spec 096813 Carpet Tile USCIS 100% Specs January 2022" (Note: specifications are subject to CUI and housed in a secured Google Drive. Please follow solicitation instructions on how to access the GSA Google Drive and CUI documents.), and
3) PROVIDE an updated PPI Log as of February 10, 2022 (attached.)
All other terms and conditions of this solicitation remain unchanged.
Amend No. Item # Date
Submitted
Question
Type
(Technical or
Admin)
Question Response
Date Response
Responded
By
EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 GSA Response GSA POC
A0001 1 1/14/2022 Technical
Where will the unloading, stocking and access provided to the construction area?
01/18/2022
There is a loading dock on the 1st floor that the contractor can access for active loading and unloading only. The remainder of the project will have to be staged in the project area.
GSA PM
A0001 2 1/14/2022 Technical
Where will parking and laydown area for contractors be provided?
1/18/2022
As per section 6.4.1.6 in the Statement of Work, parking is not available for contractors at the AFB. There are several "pay to park" parking lots within a few blocks of the AFB. Contractors will not be provided any lay down area, other than the project area itself.
GSA PM
A0001 3 1/14/2022 Technical Is there an area that will be provided for a dumpster?
1/18/2022 This answer is addressed in section 6.5.1.3 of the
Statement of Work
GSA PM
A0001 4 1/14/2022 Technical
The selections in the "Style/Pattern" column for flooring are incomplete DWG A601, they are not style selections.
Please provide styles 1/18/2022
The Government has not made final finish choices yet for this project. They will be provide upon award, or shortly thereafter. For the purposes of this solicitation, refer to Specs SECTION 099123 - INTERIOR
PAINTING.
GSA PM
A0001 5 1/14/2022 Technical
The selections in the Color column for flooring are TBD
DWG A601, However Color 1, 2, & 3 are called out in
DWG A105. Please advise on color to use. 1/18/2022
The Government has not made final finish choices yet for this project. They will be provided upon award, or shortly thereafter. For the purposes of this solicitation, refer to Specs SECTION 099123 - INTERIOR
PAINTING.
GSA PM
A0002 6 1/14/2022 Technical The heights of the existing structure / deck are not listed, please provide the height.
1/27/2022
Refer to #5. GSA CO / AE
Firm
A0001 7 1/14/2022 Technical
The general information AFB standards page lists a different type of ACT from specification 09 51 00. The
3164 is a 2x5 tile, which is correct?
1/18/2022
The Government assumes the contractor is referencing
Spec 09 51 13. The correct tile should be the 3151, which is a 2'x4' tile. The spec has been updated and has been provided in the contract file, and is labeled
"2.1 AFB USCIS 100% SPECS November 021 Rev 1".
GSA PM
A0002 8 1/14/2022 Technical
On S5.01 Metal framing note below note 10 indicates structural bearing walls to be 6”. No structural load bearing walls are indicated in the documents. Please clarify which walls are considered bearing wall and fall under this requirement. 05 40 00-1.2 indicates walls are non load bearing wall framing. Specification 09 22 16 is non structural framing.
1/27/2022
No structural load bearing walls are present. Disregard note.
GSA CO / AE
Firm
A0002 9 1/14/2022 Technical
Please clarify framing stud types and sizes provided on
S501. Structure height is expected to be above the 10 ft max wall height indicated on schedule for full height walls.
1/27/2022
Disregard the 10‐ft maximum wall height for the 6‐inch stud depth. 6‐inch stud depth can be installed to a height of 17’‐8” for stud spacing at 16‐inches and a height of 14’‐5” for stud spacing of 24‐inches.
GSA CO / AE
Firm
A0002 10 1/14/2022 Technical
Need the hardware schedule to include manufactures model numbers along with finishes. It also states to match existing, can the owner please provide this information? 1/27/2022
BHMA numbers are given as well as certain manufacturer numbers or its approved equal.
Finishes are given in the specifications. Existing finishes references the finishes in the areas outside of the
Tenant Improvements, i.e., the door hardware in the
AFB common areas leading the USCIS area.
GSA CO / AE
Firm
A0001 11 1/14/2022 Technical Please provide the wood veneer specifications or finish
1/18/2022 For which item is the contractor refering to? Please provide a Sheet and/or Spec number.
GSA PM
A0001 12 1/14/2022 Admin
Is there a separate page limit for schedule, resume, and the org chart that is included in the 15 page limit for
Factor 1?
1/18/2022
No. There is no separate page limit for each item in
Factor 1. As stated in the Solicitation, total page limitation for factor 1 is 15 pages.
CS
A0001 13 1/14/2022 Admin
Is 11x17 page size allowed for schedule? If allowed, would it be counted as one or two pages toward the page limit?
1/18/2022
Yes it is acceptable and will be counted as one page.
CS
A0001 14 1/14/2022 Admin
Volume 2 states not to exceed 40 pages. Factors 1 through 3 combined are a total of 36 pages. Please advise what the remaining 4 pages are for, considering
Table of Contents and tabs are excluded from page count.
1/18/2022
As stated in the Solicitation, Technical proposals are limited to 40 Pages. The Table of Contents and tabbed dividers shall not be counted as part of the page total.
One or two factors may exceed the page limit by 2 more pages. However total page limit for technical proposals are 40 pages.
CS
A0001 15 1/14/2022 Admin
Solicitation page 10 of 25 states that the minimum font size is 10 point. However, Factors 1 through 3 indicate
11 point size. Please clarify which font size is acceptable for the technical proposal.
1/18/2022
Minimum font size of 10 point is acceptable for techinical proposals.
CS
A0001 16 1/14/2022 Admin
Does the Government wish to receive List of
Abbreviations and Acronyms as a separate file or a part of either Volume 1 or Volume 2 or both? If part of
Volume 2, would it be counted toward the page limits?
1/18/2022
If you provide a separate list of abbreviations and acronyms as a part of volume 2, those pages will not be counted as part of the page total. CS
A0001 17 1/14/2022 Admin
Page 9 of Solicitation requires a List of Projects as part of Factor 2. Factor 2 page limit is 6 pages. Should contractors include List of Projects on a separate page and, if so, could the Government please increase page limitation for Factor 2 accordingly?
1/18/2022
LIst of projects can be listed in the Narrative. It doesn't require a separate page.
CS
A0001 18 1/14/2022 Admin
Are contractors allowed to submit the existing
CPARs/PPQs in lieu of Exhibit 3?
1/19/2022
Contractors must prepare technical proposals in accordance with the terms of the solicitation. Reference page 9 of the Solicitation, VOLUME 2 Tab 3: Factor 3, completed past performance questionnaire is required.
GSA CO
A0001 19 1/14/2022 Admin
Page 3 of Solicitation lists the following clause as applicable: "FAR 52.219-18 Notice of Competition
Limited to 8(a) Eligible Participants." However, page 4 indicates that this solicitation is set-aside for HUBZone
Small Businesses. Please clarify.
1/19/2022
This solicitation is for HUBZone Small Business Set-
Aside. The FAR 52.219-18 Notice of Competition
Limited to 8(a) Eligible Participants listed in the page 3, table of contents must be disregarded.
CS/CO
A0001 20 1/14/2022 Admin
Since the contract is to be awarded as FFP (reference
FAR 52.216-1 page 17 para IV.C ), please advise if FAR
52.215-16 referenced in para IV.I. on page 20 is applicable.
1/19/2022
FAR 52.215-16 is not applicable to this requirement and is redlined from the Solicitation.
GSA CO
A0001 21 1/14/2022 Admin
We respectfully request to add 52.249-10 Default (Fixed-
Price Construction) Ref FAR 49.504(c)(1). 1/18/2021
The FAR clause 52.249-10 is already in the agreement page 31, and it will be incorporated into the contract by reference.
CS
A0001 22 1/18/2022 Admin
For Pre-proposal inquiries, the cut-off date is listed in the document “2 Solicitation 47PL0122R0004” as being
Tuesday, January 21 2022 at 2:00pm PST. I show
January 21 as a Friday. Was it intended to be 1/21/2022 or 1/25/2022?
1/18/2022
The PPI cut off is Friday, January 21, 2022 at 2:00 PM
PST
CS
A0002 23 1/18/2022 Technical
What is the height above finished floor to the existing structure/deck?
1/27/2022
Finished heights will vary. Slab to slab height is 14’ per
2/3/76 5 Amend #1‐4 drawing 2 of Category 7.3.
Per updated Drawing 5, Category 7.2, 2/10/77, Note 4, a
6” slab depth is assumed.
GSA CO / AE
Firm
A0002 24 1/20/2022 Technical
Where is Division 078100-Applied Fireproofing applicable to this project?
1/27/2022
This is in the documents. Applied fireproofing is required where existing is disturbed, damaged, or destroyed as a result of construction efforts. The Contractor is responsible for restoring the fireproofing to the required fire resistance rating in an approved manner. Sheets
FA100 and FP100 address this requirement specifically.
However, other trades (electrical, mechanical, telecom) are affected. By observation (and must be field verified), existing primary steel members are fireproofed, see photo below from our initial site investigation. It is
Veltre’s understanding the old UBC only required primary steel to be protected and there were a few exceptions for omitting protection on secondary members that must have been applied here. It is believed that the underside of the walkerducts were also protected.
GSA CO / AE
Firm
A0002 25 1/20/2022 Technical
Spec Section 271100, Para 2.1 says:
Refer to USCIS Cable Deliverables Appendix for exact part numbers and quantities.
Please provide the Appendix or direction where to find it in the RFP documents.
1/25/2022
This information can be found in the "Structured Cable
Plant Standard, Attachment D" found on page 585 of the specifications PDF. This entire document begins immediately after Section 26 5100. GSA PM
A0002 26 1/21/2022 Technical
We respectfully request to provide Division 1
Specifications. It appears they were grayed out and not provided in the specification documents.
1/24/2022
Division 1 Specs are not provided. All Division 1 requirements are referenced in the Statement of Work GSA PM
A0002 27 1/21/2022 Technical
Door C looks like an aluminum storefront door. Please verify if all frames need to be HM or if some of the frames should be aluminum storefront?
1/27/2022
See Provided document titled 2.2 Spec 087100 Door
Hardware and 088700 Window Films. GSA PM
A0002 28 1/21/2022 Admin
Due to longer than expected lead times for Buy
American Act (BAA) equipment, could this requirement be waived for this proposal? As it stands right now, the quoted lead times exceed the allowed POP.
1/24/2022
There will be no waiver for Buy American Act. Any long lead items must be annotated as such with supporting documentation that alternate sources are unavailable.
Supporting documentation should include manufacturer letterhead. Supporting documentation for material shortages and long lead items must be labeled as such and will not be included in the proposal page count.
GSA CS/CO
A0002 29 1/21/2022 Technical
Can seismic upgrade pricing be excluded from the proposal for the fire sprinklers, and contractors are to price the cost of a survey only? If seismic upgrades are necessary, a complete survey of the existing sprinkler system will need to be completed after award.
1/24/2022
Existing sprinkler pipes in the area of work are NOT seismically braced at this time. This project shall include seismic bracing all sprinkler pipes in the area of work.
GSA PM
A0002 30 1/21/2022 Technical
Per solicitation requirements, contractors are to use flexible sprinkler drops and new quick response sprinklers. The existing sprinklers are Standard
Response throughout the building. Please clarify if QR or
SR should be used.
1/25/2022
Per NFPA 13:
a. If the existing fire sprinkler meets code based on its current placement and SOW: no modification or replacement to a QR type will be required.
b. If the existing fire sprinkler needs to be modified/relocated/replaced: fire sprinkler matching the existing must be used. If the existing fire sprinkler can not be matched, a fire sprinkler matching the characteristics of the existing and applicable fire codes must be used.
c. If a new fire sprinkler needs to be added: fire sprinkler matching the existing must be used. If the existing fire sprinkler can not be matched, a fire sprinkler matching the characteristics of the existing and applicable fire codes must be used.
GSA PM/GSA
SME
A0002 31 1/21/2022 Technical
Section 088700 Window Films is shown as an item of work. There are no Specifications for Window films.
Please provide.
1/27/2022
Specifications for glass film has been included.
GSA CO/AE
Firm
A0002 32 1/24/2022 Technical
Sow, Para 5.1 says to install 1 each APC PDU #AP7582 and continues to say "per USCIS Rack elevations below".
Sow Para 8 Rack Elevations page 10 shows 3 each 1RU that says PDU and then 3 each 2RU units that say
AP7583
Need to ask how many PDU's are required AND what is the correct P/N
1/26/2022
Contractor shall use part numbers and quantities as shown in the elevations, section 8.
GSA/USCIS
A0002 33 1/24/2022 Technical
On the CAT3 tie cable, coax cables and Fiber cables they are spec'ing CMR cable. This is NOT allowed and is a lot cheaper than the required Plenum cable (CMP). As an RCDD I cannot knowingly bid the CMR cables that I know are not allowed. Which would only be cause for a high CO after the fact. They do specify the correct
Plenum rated cables for the workstation outlets. Bidding
CMR cables would result in a lower number but isn’t correct.
1/27/2022
The Only CMR is the 50pr feed cable between the LAN room and the Demarc, which has to be in conduit.
GSA/USCIS
A0002 34 1/25/2022 Technical
Extra materials for Owner turnover of ACT required ?
Spec 09 51 13 references extra materials, but does not give a quantity.
1/26/2022
One extra box of ACT shall be provided to the government GSA/PM
A0002 35 1/25/2022 Technical
Header detail 4/S502 detail references details on S501 that do not seem to correlate. 1/27/2022
See provided redlined sheet labeled "1.1 AFB USCIS
Sheet S502 January 2022". This shall replace Sheet
S502 in original drawing package.
GSA/ECH
A0002 36 1/252022 Technical
Please confirm if G60 coating is required for interior framing partitions. G40 is common coating for interior applications.
1/26/2022
G40 coating will be accepted by the government.
GSA/PM
A0003 37 1/28/2022 Admin
Exhibit 1 Services and Price Schedule CLINs 0004 Profit and 0005 Travel and Per Diem do not match their descriptions in the Notes 5 and 6 on the following page.
Can the Government please clarify?
2/8/2022
"Exhibit 1 Price Services Schedule" is replaced by
"Exhibit 1 Price Services Schedule' in its entirety.
Proposal Price Schedule Note items 5 and 6 are stricken out and replaced with CLIN 0004 - Profit, and
CLIN 0005 Travel & Per diem; respectively.
GSA/CO
A0003 38 1/28/2022 Admin
Exhibit 1 Note 4. states: "CLINs 0001, 0002 & 0003:
Prices for these CLINs shall be supported by a High
Level Specification Breakdown (CSI) MasterFormat®
2014 Level 4 for the major tasks of this project." Is High
Level Specification Breakdown (CSI) MasterFormat®
2014 Level 4 required to be submitted with proposal?
2/8/2022
Reference Section II. Proposals, item II.B - Volume 1
(Price Proposal) on pages 8-9 of the solicitation document entitled "2 Solicitation 47PL0122R0004 Rev2
220127" for Price Proposal contents and format. GSA/CO
A0003 39 1/28/2022 Technical
Please clarify which doors are to be re-used; the door schedule has Note #9 attached to all of the doors. 2/4/2022
This is an error, most doors are new. See provided, redlined, Sheet A602. GSA/PM
A0003 40 1/28/2022 Admin
Volume 1 Price Proposal requires contractors to submit
"4. Completed “Agreement” (Solicitation page 9). After careful review, there were no changes to the Agreement.
Are contractors required to submit the Agreement without any changes?
2/10/2022
Yes, a completed "Agreement is to be submitted with the price proposal. There is an optional fillable section at
FAR Clause 52.225-9 Buy American-Construction
Materials should an offeror wish to request a determination of inapplicability of the Buy American statute. Note, any request to use foreign construction materials in accordance with paragraph (b)(c) of this clause shall include adequate information for
Government evaluation of the request, including all items listed at paragraph (c) of the clause. (Reference pages 20 - 21 of attachment "4 Agreement
47PL0122R0004".
GSA/CO
A0003 41 1/28/2022 Admin
Volume 1 Price Proposal requires contractors to submit
"8. Completed fill-in portions of provisions of the
Solicitation, as amended. The specific full text of the provision, with the filled in information should be included only" (Solicitation page 9). After careful review, we could not locate any fill-in portions to be completed by the offerors. Please advise if this requirement is applicable.
2/10/2022
Correct, there are no file in portions applicable to the solicitation document entitled "2 Solicitation
47PL0122R0004 Rev2 220127".
GSA/CO
A0003 42 1/28/2022 Technical
Wall Types on A5.01 refer to Structural drawings for framing sizes. Addendum 2 item 8 confirmed no structural walls are present, which implies all wall framing is to be 4” per S5.01 schedule. Can the 3 5/8” standard metal framing be utilized for 4” ?
1/31/2022
If by "metal framing" the contractor is referring to studs, then, yes The Government will accept 3 5/8" studs, 25
ga. GSA/PM
A0003 43 2/9/2022 Technical
RFP states: "1.3.2.1. All disruptive work shall be scheduled outside of weekday working hours. The use of pneumatic drills or hammers will NOT be permitted during normal working hours." Can the Government please specifically call out the spec sections that they want this work to be scheduled outside normal hours as this may affect pricing?
2/10/2022
The contractor shall use their discretion to decide if/when the use of pneumatic drills/hammers is appropriate, and it is up to the contractor to come up with a work plan using their best judgement given their experience in similar TI projects.
GSA/PM
44 2/9/2022 Technical Please provide the redlined A602 that shows the updated door schedule.
45 2/9/2022 Technical 1- Door Notes: Every opening has the same notes, is this correct?
46 2/9/2022 Technical
2- Hardware schedule: It appears that there are a lot of holes in the hardware schedule. Is it the architect intent to have the hardware supplier fill in the blanks of missing door hardware?
47 2/9/2022 Technical
3- Hardware Schedule: hardware set 11 & 12 ADA push plate switch. Are the existing ADA operators being reused and new actuators needed?
48 2/9/2022 Technical
4- Is there a list with part numbers and set being provided from the security contractors electrical door hardware? This will be needed to accurately price the correct door and frame hardware preps.
PPI (Pre-proposal Inquiries) cut-off is Friday, January 28, 2022 at 2:00 PM PST. PPIs received later than the designated cut-off will may or may not be responded.
49 2/9/2022 Technical
5- Hardware section 087100 and plan page A602 hardware schedule does not provide sufficient information to allow for "apples to apples" bid. Can the
Government please be more specific with the hardware schedule?
50 2/9/2022 Technical
6- Hardware section 087100-page 4 G mortise locks indicates Falcon L keyway 6-pin. Page 5 2.10 Lock cylinders A 1. & B 1 is calling out for Schlage Primus XP six pin interchangeable core, D Family Restricted keyway. Please clarify which one is correct.
51 2/9/2022 Technical
7- Section 087100 is calling out for cylindrical locks and mortise case locks. Hardware notes plan page A602 indicates all door hardware to be commercial grade mortised hardware. Please advise which is correct.
52 2/9/2022 Technical Is there access to the ductwork inside the exhaust duct shaft on each floor?
AM0003 53 2/9/2022 Admin
As we are diligently working to provide the most responsive and accurate proposal and in anticipation of the upcoming amendment, we respectfully request an extension to the proposal due date to March 4, 2022.
2/10/2022
Solicitation Amendment 0003 extends the RFP response due date and time.
GSA/CO
AM0003 54 2/9/2022 Admin
Reference Q&A No. 18: While we make every possible effort to obtain PPQs from our clients, their willingness to respond is outside of our control. If no existing
CPARS/PPQs are allowed to be submitted with the proposal, we respectfully request allowing contractors to submit Blocks 1-4 with the current POC information identified for each of the references.
2/10/2022
Reference attachment 2 Solicitation 47PL0122R0004
Rev2 220127; Factor 3 - Past Performance on Relevant
Projects considered the quality of an offeror's collective experience in performing project similar in size, scope, and complexity to those described in the solicitation.
The relevance of the projects submitted will be an additional consideration under this factor.
Note: The Government may take into account past performance information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major critical aspects of the requirement when such information is relevant to the instant acquisition. This may include information secured by the Government through other various means e.g. Contractor
Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information
System (FAPIIS), etc. If the offeror has no record of relevant past performance or the information on their past performance is not available, the offeror may be rated as "neutral".
55 2/9/2022 Technical
We have received a couple of questions regarding Door
Schedule on A602 and Door Hardware
Plan Page A602 door schedule,
1. Door Notes: Every opening has the same notes, is this correct.
2. Hardware schedule: It appears that there are a lot of holes in the hardware schedule. Is it the architect intent to have the hardware supplier fill in the blanks of missing door hardware?
3. Hardware Schedule: hardware set 11 & 12 ADA push plate switch. Are there existing ADA operators being reused and new actuators are needed, please advise?
4. Is there a list with part numbers and set being provided from the security contractors electrical door hardware? This will be needed to accurately price the correct door and frame hardware preps.
5. Hardware section 087100 and plan page A602 hardware schedule are both open for interpretation.
6. Hardware section 087100-page 4 G mortise locks indicates
Falcon L keyway 6-pin. Page 5 2.10 Lock cylinders A 1. & B 1 is calling out for Schlage Primus XP six pin interchangeable core, D
Family Restricted keyway, what is correct.
7. Section 087100 is calling out for cylindrical locks and mortise case locks. Hardware notes plan Page A602 indicates all door hardware to be commercial grade mortised hardware, what is correct.
| PPI Log .pdf |
| PPI Log |
| 2022-02-10T16:38:33-0900 | |
| Rebecca Graham |
File details come from the government source that posted it. Updated .