This solicitation is seeking proposals for a construction project to build out office space for the United States Citizenship and Immigration Services agency in Anchorage, Alaska. The project includes HVAC, electrical, fire and life safety, telecommunications, information technology, ceiling components, lighting, and structural improvements. Proposals are due no later than February 8, 2022 and the contract will be set aside for HUBZone small businesses. Interested vendors must register for a pre-proposal site visit taking place on January 11, 2022 and submit any pre-proposal inquiries by January 21, 2022. The selected vendor will demolish existing spaces and construct new walls, doors, lights, outlets, casework, offices, a network room, and sound attenuation to relocate the agency before its current lease expires.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Description of Modification Continuation Page
... GSA will provide answers to those unanswered questions as soon as they are available. The PPI cut off is Friday, January 21, 2022 at 2:00 PM PST. GSA will not accept any questions received later than the designated PPI cut off.
The Contracting Officer (CO) for this project has been changed from Thupten Tsering to Becky Graham. The CO can be reached by rebecca.graham@gsa.gov or (907) 223-8671. The closing date and time of this solicitation remain unchanged.
47PL0122R0004/0001
1/19/22, 9:22 AM SAM.gov https://sam.gov/wage-determination/AK20220001/0 1/14
"General Decision Number: AK20220001 01/07/2022
Superseded General Decision Number: AK20210001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/07/2022
* ASBE0097-001 06/01/2021
Rates Fringes
Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical https://sam.gov/wage-determination/AK20220001/0 2/14 systems).........................$ 38.68 21.57
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55
* BOIL0502-002 01/01/2021
Rates Fringes
BOILERMAKER......................$ 47.03 30.59
* BRAK0001-002 07/01/2020
Rates Fringes
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 42.16 19.67 Tile & Terrazzo Finisher.........$ 35.99 19.67
CARP1501-001 09/01/2019
Rates Fringes
MILLWRIGHT.......................$ 37.64 23.46
CARP2520-003 09/01/2019
Rates Fringes
Diver Stand-by....................$ 42.65 26.51 Tender......................$ 41.65 26.51 Working.....................$ 82.45 26.51 Piledriver Piledriver; Skiff Operator and Rigger..................$ 38.34 26.51 Sheet Stabber...............$ 38.34 26.51 Welder......................$ 43.90 26.51
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for https://sam.gov/wage-determination/AK20220001/0 3/14 that shift.
CARP4059-001 09/01/2019
Rates Fringes
CARPENTER
Including Lather and Drywall Hanging.............$ 38.34 26.51
ELEC1547-004 04/01/2020
Rates Fringes
CABLE SPLICER....................$ 41.27 3% + 27.64
ELECTRICIAN......................$ 40.94 3% + 27.89
ELEC1547-005 04/01/2021
Line Construction
Rates Fringes
CABLE SPLICER....................$ 57.79 32.04
Linemen (Including Equipment Operators, Technician)...........$ 56.04 3%+32.04 Powderman........................$ 54.04 32.04
TREE TRIMMER.....................$ 37.30 3%+25.94
ELEV0019-002 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 59.11 35.245
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving, and Christmas Day
ENGI0302-002 01/01/2021
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 42.53 25.20
GROUP 1A....................$ 44.29 25.20
GROUP 2.....................$ 41.76 25.20
GROUP 3.....................$ 41.04 25.20
GROUP 4.....................$ 34.83 25.20
TUNNEL WORK
GROUP 1....................$ 46.78 25.20
GROUP 1A...................$ 48.72 25.20
GROUP 2....................$ 45.94 25.20
GROUP 3....................$ 45.14 25.20
GROUP 4....................$ 38.31 25.20
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and https://sam.gov/wage-determination/AK20220001/0 4/14
Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: ""A"" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber https://sam.gov/wage-determination/AK20220001/0 5/14
Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
* IRON0751-003 07/01/2021
Rates Fringes
IRONWORKER
BENDER OPERATOR.............$ 40.82 34.99
BRIDGE, STRUCTURAL,
ORNAMENTAL,
REINFORCING
MACHINERY MOVER,
RIGGER,
SHEETER, STAGE
RIGGER,
BENDER OPERATOR........$ 40.82 34.99
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 38.75 32.63
FENCE, BARRIER INSTALLER....$ 37.32 34.99
GUARDRAIL INSTALLERS........$ 38.32 34.99
GUARDRAIL LAYOUT MAN........$ 38.06 34.99
HELICOPTER, TOWER...........$ 41.82 34.99
* LABO0341-001 04/01/2021
Rates Fringes
LABORER (South of the 63rd Parallel & West of Longitude 138 Degrees)
GROUP 1.....................$ 32.00 31.11
GROUP 2.....................$ 33.00 31.11
GROUP 3.....................$ 33.90 31.11
GROUP 3A....................$ 37.18 31.11
GROUP 3B....................$ 40.97 28.40
GROUP 4.....................$ 21.57 31.11
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 35.20 31.11
GROUP 2....................$ 36.30 31.11
https://sam.gov/wage-determination/AK20220001/0 6/14
GROUP 3....................$ 37.29 31.11
GROUP 3A...................$ 40.90 31.11
GROUP 3B...................$ 45.07 28.40
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
https://sam.gov/wage-determination/AK20220001/0 7/14
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
LABO0942-001 04/01/2021
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 32.00 27.58
GROUP 2.....................$ 33.00 27.58
GROUP 3.....................$ 33.90 27.58
GROUP 3A....................$ 37.18 27.58
GROUP 3B....................$ 40.97 24.87
GROUP 4.....................$ 21.57 27.58
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 34.88 28.36
Group 1....................$ 35.20 27.58
GROUP 2....................$ 35.98 28.36
Group 2....................$ 36.30 27.58
GROUP 3....................$ 36.97 28.36
Group 3....................$ 37.29 27.58
GROUP 3A...................$ 40.58 28.36
Group 3A...................$ 40.90 27.58
GROUP 3B...................$ 44.75 25.65
Group 3B...................$ 45.07 24.87
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner https://sam.gov/wage-determination/AK20220001/0 8/14
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 03/01/2021
NORTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 34.19 24.16
TAPING, TEXTURING,
https://sam.gov/wage-determination/AK20220001/0 9/14
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 34.19 24.16
PAIN1959-002 03/01/2021
SOUTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
General Painter.............$ 31.33 24.94 Industrial Painter..........$ 32.68 24.94 Taper / Paper & Vinyl Hanger......................$ 32.58 24.94
PAIN1959-003 07/01/2019
NORTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 39.40 24.87
PAIN1959-004 07/01/2019
Rates Fringes
FLOOR LAYER: Carpet.............$ 28.75 14.44
PAIN1959-006 07/01/2019
SOUTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 39.61 23.94
* PLUM0262-002 07/01/2021
East of the 141st Meridian
Rates Fringes
Plumber; Steamfitter.............$ 39.82 27.52
* PLUM0367-002 07/01/2021
South of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 41.00 27.95
* PLUM0375-002 07/01/2021
North of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 42.91 31.25 https://sam.gov/wage-determination/AK20220001/0 10/14
PLUM0669-002 04/01/2019
Rates Fringes
SPRINKLER FITTER.................$ 47.25 26.49
ROOF0189-006 04/01/2021
Rates Fringes
ROOFER...........................$ 44.62 17.63
* SHEE0023-003 07/01/2021
South of the 63rd Parallel
Rates Fringes
SHEET METAL WORKER...............$ 43.75 27.92
* SHEE0023-004 07/01/2021
North of the 63rd Parallel
Rates Fringes
SHEET METAL WORKER...............$ 49.04 28.26
TEAM0959-003 04/01/2021
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 41.94 26.12
GROUP 1A....................$ 43.21 26.12
GROUP 2.....................$ 40.68 26.12
GROUP 3.....................$ 39.86 26.12
GROUP 4.....................$ 39.28 26.12
GROUP 5.....................$ 38.52 26.12
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;
Stringing Truck
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch https://sam.gov/wage-determination/AK20220001/0 11/14 trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted ""A"" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;
Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;
Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted ""A"" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within https://sam.gov/wage-determination/AK20220001/0 12/14 the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in https://sam.gov/wage-determination/AK20220001/0 13/14 the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
https://sam.gov/wage-determination/AK20220001/0 14/14
END OF GENERAL DECISION"
Amend No. Item # Date
Submitted
Question
Type Question
Response
Date Response
Responded
By EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 GSA Response GSA POC
A0001 1 1/14/2022 Technical
Where will the unloading, stocking and access provided to the construction area?
01/18/2022
There is a loading dock on the 1st floor that the contractor can access for active loading and unloading only. The reaminder of the project will have to be staged in the project area.
GSA PM
A0001 2 1/14/2022 Technical
Where will parking and laydown area for contractors be provided?
1/18/2022
As per section 6.4.1.6 in the Statement of
Work, parking is not available for contractors at the AFB. There are several "pay to park" parking lots within a few blocks of the AFB.
Contractors will not be provided any lay down area, other than the project area itself.
GSA PM
A0001 3 1/14/2022 Technical
Is there an area that will be provided for a dumpster?
1/18/2022
This answer is addressed in section 6.5.1.3 of the Statement of Work GSA PM
A0001 4 1/14/2022 Technical
The selections in the "Style/Pattern" column for flooring are incomplete DWG A601, they are not style selections. Please provide styles 1/18/2022
The Government has not made final finish choices yet for this project. They will be provide upon award, or shortly thereafter.
For the purposes of this solicitation, refer to
Specs SECTION 099123 - INTERIOR
PAINTING.
GSA PM
A0001 5 1/14/2022 Technical
The selections in the Color column for flooring are TBD
DWG A601, However Color 1, 2, & 3 are called out in
DWG A105. Please advise on color to use.
1/18/2022
The Government has not made final finish choices yet for this project. They will be provided upon award, or shortly thereafter.
For the purposes of this solicitation, refer to
Specs SECTION 099123 - INTERIOR
PAINTING.
GSA PM
6 1/14/2022 Technical
The heights of the existing structure / deck are not listed, please provide the height.
Pending response
GSA CO / AE
Firm
A0001 7 1/14/2022 Technical
The general information AFB standards page lists a different type of ACT from specification 09 51 00. The
3164 is a 2x5 tile, which is correct?
1/18/2022
The Government assumes the contractor is referencing Spec 09 51 13. The correct tile should be the 3151, which is a 2'x4' tile. The spec has been updated and has been provided in the contract file, and is labeled
"2.1 AFB USCIS 100% SPECS November
021 Rev 1".
GSA PM
8 1/14/2022 Technical
On S5.01 Metal framing note below note 10 indicates structural bearing walls to be 6”. No structural load bearing walls are indicated in the documents. Please clarify which walls are considered bearing wall and fall under this requirement. 05 40 00-1.2 indicates walls are non load bearing wall framing. Specification 09 22
16 is non structural framing.
Pending response
GSA CO / AE
Firm
9 1/14/2022 Technical
Please clarify framing stud types and sizes provided on
S501. Structure height is expected to be above the 10 ft max wall height indicated on schedule for full height walls.
Pending response
GSA CO / AE
Firm
10 1/14/2022 Technical
Need the hardware schedule to include manufactures model numbers along with finishes. It also states to match existing, can the owner please provide this information?
Pending response
GSA CO / AE
Firm
A0001 11 1/14/2022 Technical
Please provide the wood veneer specifications or finish
1/18/2022
For which item is the contractor refering to?
Please provide a Sheet and/or Spec number. GSA PM
A0001 12 1/14/2022 Admin
Is there a separate page limit for schedule, resume, and the org chart that is included in the 15 page limit for
Factor 1? 1/18/2022
No. There is no separate page limit for each item in Factor 1. As stated in the Solicitation, total page limitation for factor 1 is 15 pages. CS
A0001 13 1/14/2022 Admin
Is 11x17 page size allowed for schedule? If allowed, would it be counted as one or two pages toward the page limit?
1/18/2022
Yes it is acceptable and will be counted as one page. CS
A0001 14 1/14/2022 Admin
Volume 2 states not to exceed 40 pages. Factors 1 through 3 combined are a total of 36 pages. Please advise what the remaining 4 pages are for, considering
Table of Contents and tabs are excluded from page count. 1/18/2022
As stated in the Solicitation, Technical proposals are limited to 40 Pages. The Table of Contents and tabbed dividers shall not be counted as part of the page total. One or two factors may exceed the page limit by 2 more pages. However total page limit for technical proposals are 40 pages.
CS
A0001 15 1/14/2022 Admin
Solicitation page 10 of 25 states that the minimum font size is 10 point. However, Factors 1 through 3 indicate
11 point size. Please clarify which font size is acceptable for the technical proposal.
1/18/2022
Minimum font size of 10 point is acceptable for techinical proposals.
CS
A0001 16 1/14/2022 Admin
Does the Government wish to receive List of
Abbreviations and Acronyms as a separate file or a part of either Volume 1 or Volume 2 or both? If part of
Volume 2, would it be counted toward the page limits?
1/18/2022
If you provide a separate list of abbreviations and acronyms as a part of volume 2, those pages will not be counted as part of the page total.
CS
A0001 17 1/14/2022 Admin
Page 9 of Solicitation requires a List of Projects as part of Factor 2. Factor 2 page limit is 6 pages. Should contractors include List of Projects on a separate page and, if so, could the Government please increase page limitation for Factor 2 accordingly?
1/18/2022
LIst of projects can be listed in the Narrative.
It doesn't require a separate page.
CS
A0001 18 1/14/2022 Admin
Are contractors allowed to submit the existing
CPARs/PPQs in lieu of Exhibit 3?
1/19/2022
Contractors must prepare technical proposals in accordance with the terms of the solicitation. Reference page 9 of the
Soliciation, VOLUME 2 Tab 3: Factor 3, completed past performance questionnaire is required.
GSA CO
A0001 19 1/14/2022 Admin
Page 3 of Solicitation lists the following clause as applicable: "FAR 52.219-18 Notice of Competition
Limited to 8(a) Eligible Participants." However, page 4 indicates that this solicitation is set-aside for HUBZone
Small Businesses. Please clarify.
1/19/2022
This solicitation is for HUBZone Small
Business Set-Aside. The FAR 52.219-18
Notice of Competition Limited to 8(a) Eligible
Participants listed in the page 3, table of contents must be disregarded.
CS/CO
A0001 20 1/14/2022 Admin
Since the contract is to be awarded as FFP (reference
FAR 52.216-1 page 17 para IV.C ), please advise if
FAR 52.215-16 referenced in para IV.I. on page 20 is applicable.
1/19/2022
FAR 52.215-16 is not applicable to this requirement and is redlined from the
Solicitation. GSA CO
A0001 21 1/14/2022 Admin
We respectfully request to add 52.249-10 Default
(Fixed-Price Construction) Ref FAR 49.504(c)(1).
1/18/2021
The FAR clause 52.249-10 is already in the agreement page 31, and it will be incorporated into the contract by reference. CS
A0001 22 1/18/2022 Admin
For Pre-proposal inquiries, the cut-off date is listed in the document “2 Solicitation 47PL0122R0004” as being
Tuesday, January 21 2022 at 2:00pm PST. I show
January 21 as a Friday. Was it intended to be
1/21/2022 or 1/25/2022?
1/18/2022
The PPI cut off is Friday, January 21, 2022 at 2:00 PM PST
CS
23 1/18/2022 Technical What is the height above finished floor to the existing structure/deck?
Pending response
GSA CO / AE
Firm
| 1PPI Log for A0001.xlsx.pdf |
| PPI Log |
| Key |
| topmostSubform[0]: |
| Page1[0]: |
| Code[0]: 10PQCB2 |
| Copies[0]: 1 |
| CheckBox9[0]: 1 |
| Code[2]: 10PQCB2 |
| NameandTitleOfficer[0]: Rebecca Graham, Contracting Officer |
| Is[0]: Off |
| CheckBox10[0]: Off |
| NameandAddress[0]: |
| DateSigned[1]: |
| Pages[0]: 19 |
| AmendmentNo[0]: 0001 |
| Dated10B[0]: |
| ModificationNo[0]: |
| AdministeredBy[0]: Acquisition Management Division |
Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA
| FacilityCode[0]: |
| CheckBox13B[0]: Off |
| CheckBox13D[0]: Off |
| ReqNumber[0]: EQ10PCPB-22-0003 |
| Dated9B[0]: 12/22/2021 |
| C13[0]: |
| Description[0]: The purpose of this amendment is to 1)Provide a Site Visit Sign-In Sheet, 2) Provide an updated Wage Determination dated January 7, 2022, 3) Provide an updated PPI Log for Questions and Answers as of January 19, 2022, and 4) Correct the AFB USCIS 100% SPECS, SECTION 095113 - ACOUSTICAL PANEL CEILINGS, 2.3 ACOUSTICAL PANELS, A. Acoustical Panel Standard from 3164 panels to 3151 panels. See the revised document titled 2.1 AFB USCIS 100% SPECS November 2021 Rev 1.pdf in the project google drive. ... |
[See Description of Modification Continuation Page]
| NotExtended[0]: 1 |
| Code[1]: |
| AmendmentNo[1]: 47PL0122R0004 |
| ContractIDCode[0]: |
| DateSigned[0]: |
| CheckBox11[0]: 1 |
| Page[0]: 1 |
| AccountingData[0]: |
| CopiesReturned[0]: |
| CheckBox13A[0]: Off |
| IsNot[0]: Off |
| EffectiveDate[0]: 1/19/2022 |
| A13[0]: |
| ProjectNo[0]: |
| CheckBox13C[0]: Off |
| Extended[0]: Off |
| D13[0]: |
| IssuedBy[0]: Acquisition Management Division |
Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA NameandTitleSigner[0]:
| Page2[0]: |
| TextField1[5]: |
| TextField1[4]: |
| TextField1[3]: |
| TextField1[2]: |
| TextField1[1]: |
| TextField1[0]: |
File details come from the government source that posted it. Updated .