This solicitation package seeks proposals for a construction project to build out office space for the United States Citizenship and Immigration Services within the Anchorage Federal Building. The project scope involves renovating approximately 5,100 square feet of space on the first floor to include HVAC, electrical, fire protection, telecommunications infrastructure, IT systems, ceilings, lighting, and structural improvements. Interested HUBZone small businesses may submit proposals by February 15th, 2022 electronically to the General Services Administration. A pre-proposal site visit will be held on January 11th. The awarded firm must perform demolition, install new walls, doors, fixtures, workstations, a server room, and sound attenuation. Inquiries are due by January 28th. The NAICS code for this opportunity is 236220.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Description of Modification Continuation Page

... 2022. Please see the attached updated PPI Log. Updated Statement of Work Rev 2, Solicitation Rev 2 and SF1442 Rev 1 can be found on SAM.GOV and Google Drive. 2.2 Spec 087100 Door Hardware and 088700 Window Films, and 15 AFB USCIS Sheet S502 January 2022 can be found on Google Drive Only. All other terms and conditions of this solicitation remain unchanged.

47PL0122R0004/0002

Amend No. Item # Date

Submitted

Question

Type Question

Response

Date Response

Responded

By EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 GSA Response GSA POC

A0001 1 1/14/2022 Technical

Where will the unloading, stocking and access provided to the construction area?

01/18/2022

There is a loading dock on the 1st floor that the contractor can access for active loading and unloading only. The remainder of the project will have to be staged in the project area.

GSA PM

A0001 2 1/14/2022 Technical

Where will parking and laydown area for contractors be provided?

1/18/2022

As per section 6.4.1.6 in the Statement of

Work, parking is not available for contractors at the AFB. There are several "pay to park" parking lots within a few blocks of the AFB.

Contractors will not be provided any lay down area, other than the project area itself.

GSA PM

A0001 3 1/14/2022 Technical

Is there an area that will be provided for a dumpster?

1/18/2022

This answer is addressed in section 6.5.1.3 of the Statement of Work GSA PM

A0001 4 1/14/2022 Technical

The selections in the "Style/Pattern" column for flooring are incomplete DWG A601, they are not style selections. Please provide styles 1/18/2022

The Government has not made final finish choices yet for this project. They will be provide upon award, or shortly thereafter.

For the purposes of this solicitation, refer to

Specs SECTION 099123 - INTERIOR

PAINTING.

GSA PM

A0001 5 1/14/2022 Technical

The selections in the Color column for flooring are TBD

DWG A601, However Color 1, 2, & 3 are called out in

DWG A105. Please advise on color to use.

1/18/2022

The Government has not made final finish choices yet for this project. They will be provided upon award, or shortly thereafter.

For the purposes of this solicitation, refer to

Specs SECTION 099123 - INTERIOR

PAINTING.

GSA PM

A0002 6 1/14/2022 Technical

The heights of the existing structure / deck are not listed, please provide the height. 1/27/2022

Refer to #5.

GSA CO / AE

Firm

A0001 7 1/14/2022 Technical

The general information AFB standards page lists a different type of ACT from specification 09 51 00. The

3164 is a 2x5 tile, which is correct?

1/18/2022

The Government assumes the contractor is referencing Spec 09 51 13. The correct tile should be the 3151, which is a 2'x4' tile. The spec has been updated and has been provided in the contract file, and is labeled

"2.1 AFB USCIS 100% SPECS November

021 Rev 1".

GSA PM

A0002 8 1/14/2022 Technical

On S5.01 Metal framing note below note 10 indicates structural bearing walls to be 6”. No structural load bearing walls are indicated in the documents. Please clarify which walls are considered bearing wall and fall under this requirement. 05 40 00-1.2 indicates walls are non load bearing wall framing. Specification 09 22

16 is non structural framing.

1/27/2022

No structural load bearing walls are present.

Disregard note.

GSA CO / AE

Firm

A0002 9 1/14/2022 Technical

Please clarify framing stud types and sizes provided on

S501. Structure height is expected to be above the 10 ft max wall height indicated on schedule for full height walls.

1/27/2022

Disregard the 10‐ft maximum wall height for the 6‐inch stud depth. 6‐inch stud depth can be installed to a height of 17’‐8” for stud spacing at 16‐inches and a height of 14’‐5” for stud spacing of 24‐inches.

GSA CO / AE

Firm

A0002 10 1/14/2022 Technical

Need the hardware schedule to include manufactures model numbers along with finishes. It also states to match existing, can the owner please provide this information?

1/27/2022

BHMA numbers are given as well as certain manufacturer numbers or its approved equal.

Finishes are given in the specifications.

Existing finishes references the finishes in the areas outside of the Tenant

Improvements, i.e., the door hardware in the

AFB common areas leading the USCIS area.

GSA CO / AE

Firm

A0001 11 1/14/2022 Technical

Please provide the wood veneer specifications or finish

1/18/2022

For which item is the contractor refering to?

Please provide a Sheet and/or Spec number. GSA PM

A0001 12 1/14/2022 Admin

Is there a separate page limit for schedule, resume, and the org chart that is included in the 15 page limit for

Factor 1? 1/18/2022

No. There is no separate page limit for each item in Factor 1. As stated in the Solicitation, total page limitation for factor 1 is 15 pages. CS

A0001 13 1/14/2022 Admin

Is 11x17 page size allowed for schedule? If allowed, would it be counted as one or two pages toward the page limit?

1/18/2022

Yes it is acceptable and will be counted as one page. CS

A0001 14 1/14/2022 Admin

Volume 2 states not to exceed 40 pages. Factors 1 through 3 combined are a total of 36 pages. Please advise what the remaining 4 pages are for, considering

Table of Contents and tabs are excluded from page count.

1/18/2022

As stated in the Solicitation, Technical proposals are limited to 40 Pages. The Table of Contents and tabbed dividers shall not be counted as part of the page total. One or two factors may exceed the page limit by 2 more pages. However total page limit for technical proposals are 40 pages.

CS

A0001 15 1/14/2022 Admin

Solicitation page 10 of 25 states that the minimum font size is 10 point. However, Factors 1 through 3 indicate

11 point size. Please clarify which font size is acceptable for the technical proposal.

1/18/2022

Minimum font size of 10 point is acceptable for techinical proposals.

CS

A0001 16 1/14/2022 Admin

Does the Government wish to receive List of

Abbreviations and Acronyms as a separate file or a part of either Volume 1 or Volume 2 or both? If part of

Volume 2, would it be counted toward the page limits?

1/18/2022

If you provide a separate list of abbreviations and acronyms as a part of volume 2, those pages will not be counted as part of the page total.

CS

A0001 17 1/14/2022 Admin

Page 9 of Solicitation requires a List of Projects as part of Factor 2. Factor 2 page limit is 6 pages. Should contractors include List of Projects on a separate page and, if so, could the Government please increase page limitation for Factor 2 accordingly?

1/18/2022

LIst of projects can be listed in the Narrative.

It doesn't require a separate page.

CS

A0001 18 1/14/2022 Admin

Are contractors allowed to submit the existing

CPARs/PPQs in lieu of Exhibit 3?

1/19/2022

Contractors must prepare technical proposals in accordance with the terms of the solicitation. Reference page 9 of the

Soliciation, VOLUME 2 Tab 3: Factor 3, completed past performance questionnaire is required.

GSA CO

A0001 19 1/14/2022 Admin

Page 3 of Solicitation lists the following clause as applicable: "FAR 52.219-18 Notice of Competition

Limited to 8(a) Eligible Participants." However, page 4 indicates that this solicitation is set-aside for HUBZone

Small Businesses. Please clarify.

1/19/2022

This solicitation is for HUBZone Small

Business Set-Aside. The FAR 52.219-18

Notice of Competition Limited to 8(a) Eligible

Participants listed in the page 3, table of contents must be disregarded.

CS/CO

A0001 20 1/14/2022 Admin

Since the contract is to be awarded as FFP (reference

FAR 52.216-1 page 17 para IV.C ), please advise if

FAR 52.215-16 referenced in para IV.I. on page 20 is applicable.

1/19/2022

FAR 52.215-16 is not applicable to this requirement and is redlined from the

Solicitation. GSA CO

A0001 21 1/14/2022 Admin

We respectfully request to add 52.249-10 Default

(Fixed-Price Construction) Ref FAR 49.504(c)(1).

1/18/2021

The FAR clause 52.249-10 is already in the agreement page 31, and it will be incorporated into the contract by reference. CS

A0001 22 1/18/2022 Admin

For Pre-proposal inquiries, the cut-off date is listed in the document “2 Solicitation 47PL0122R0004” as being

Tuesday, January 21 2022 at 2:00pm PST. I show

January 21 as a Friday. Was it intended to be

1/21/2022 or 1/25/2022?

1/18/2022

The PPI cut off is Friday, January 21, 2022 at 2:00 PM PST

CS

A0002 23 1/18/2022 Technical

What is the height above finished floor to the existing structure/deck?

1/27/2022

Finished heights will vary. Slab to slab height is 14’ per 2/3/76 5 Amend #1‐4 drawing 2 of

Category 7.3.

Per updated Drawing 5, Category 7.2, 2/10/77, Note 4, a 6” slab depth is assumed.

GSA CO / AE

Firm

A0002 24 1/20/2022 Technical

Where is Division 078100-Applied Fireproofing applicable to this project?

1/27/2022

This is in the documents. Applied fireproofing is required where existing is disturbed, damaged, or destroyed as a result of construction efforts. The Contractor is responsible for restoring the fireproofing to the required fire resistance rating in an approved manner. Sheets FA100 and FP100 address this requirement specifically.

However, other trades (electrical, mechanical, telecom) are affected. By observation (and must be field verified), existing primary steel members are fireproofed, see photo from our initial site investigation. It is Veltre’s understanding the old UBC only required primary steel to be protected and there were a few exceptions for omitting protection on secondary members that must have been applied here.

It is believed that the underside of the walkerducts were also protected.

GSA CO / AE

Firm

A0002 25 1/20/2022 Technical

Spec Section 271100, Para 2.1 says:

Refer to USCIS Cable Deliverables Appendix for exact part numbers and quantities.

Please provide the Appendix or direction where to find it in the RFP documents.

1/25/2022

This information can be found in the

"Structured Cable Plant Standard, Attachment D" found on page 585 of the specifications PDF. This entire document begins immediately after Section 26 5100.

GSA PM

A0002 26 1/21/2022 Technical

We respectfully request to provide Division 1

Specifications. It appears they were grayed out and not provided in the specification documents.

1/24/2022

Division 1 Specs are not provided. All

Division 1 requierements are referenced in the Statement of Work

GSA PM

A0002 27 1/21/2022 Technical

Door C looks like an aluminum storefront door. Please verify if all frames need to be HM or if some of the frames should be aluminum storefront?

1/27/2022

See Provided document titled 2.2 Spec

087100 Door Hardware and 088700 Window

Films.

GSA PM

A0002 28 1/21/2022 Admin

Due to longer than expected lead times for Buy

American Act (BAA) equipment, could this requirement be waived for this proposal? As it stands right now, the quoted lead times exceed the allowed POP.

1/24/2022

There will be no waiver for Buy American

Act. Any long lead items must be anotated as such with supporting documentation that alternate sources are unavailable.

Supporting documentation should include manufacturer letterhead. Supporting documentation for material shortages and long lead items must be labeled as such and will not be included in the proposal page count.

GSA CS/CO

A0002 29 1/21/2022 Technical

Can seismic upgrade pricing be excluded from the proposal for the fire sprinklers, and contractors are to price the cost of a survey only? If seismic upgrades are necessary, a complete survey of the existing sprinkler system will need to be completed after award.

1/24/2022

Existing sprinkler pipes in the area of work are NOT seismically braced at this time. This project shall include seismic bracing all sprinkler pipes in the area of work.

GSA PM

A0002 30 1/21/2022 Technical

Per solicitation requirements, contractors are to use flexible sprinkler drops and new quick response sprinklers. The existing sprinklers are Standard

Response throughout the building. Please clarify if QR or SR should be used.

1/25/2022

Per NFPA 13:

a. If the existing fire sprinkler meets code based on its current placement and SOW:

no modification or replacement to a QR type will be required.

b. If the existing fire sprinkler needs to be modified/relocated/replaced: fire sprinkler matching the existing must be used. If the existing fire sprinkler can not be matched, a fire sprinkler matching the characteristics of the existing and applicable fire codes must be used.

c. If a new fire sprinkler needs to be added:

fire sprinkler matching the existing must be used. If the existing fire sprinkler can not be matched, a fire sprinkler matching the characteristics of the existing and applicable fire codes must be used.

GSA

PM/GSA

SME

A0002 31 1/21/2022 Technical

Section 088700 Window Films is shown as an item of work. There are no Specifications for Window films.

Please provide.

1/27/2022

Specifications for glass film has been included. GSA CO/AE

Firm

A0002 32 1/24/2022 Technical

Sow, Para 5.1 says to install 1 each APC PDU

#AP7582 and continues to say "per USCIS Rack elevations below".

Sow Para 8 Rack Elevations page 10 shows 3 each

1RU that says PDU and then 3 each 2RU units that say

AP7583

Need to ask how many PDU's are required AND what is the correct P/N

1/26/2022

Contractor shall use part numbers and quantities as shown in the elevations, section 8.

GSA/USCIS

A0002 33 1/24/2022 Technical

On the CAT3 tie cable, coax cables and Fiber cables they are spec'ing CMR cable. This is NOT allowed and is a lot cheaper than the required Plenum cable (CMP).

As an RCDD I cannot knowingly bid the CMR cables that I know are not allowed. Which would only be cause for a high CO after the fact. They do specify the correct

Plenum rated cables for the workstation outlets. Bidding

CMR cables would result in a lower number but isn’t correct.

1/27/2022

The Only CMR is the 50pr feed cable between the LAN room and the Demarc, which has to be in conduit.

GSA/USCIS

A0002 34 1/25/2022 Technical

Extra materials for Owner turnover of ACT required ?

Spec 09 51 13 references extra materials, but does not give a quantity.

1/26/2022

One extra box of ACT shall be provided to the government GSA/PM

A0002 35 1/25/2022 Technical

Header detail 4/S502 detail references details on S501 that do not seem to correlate.

1/27/2022

See provided redlined sheet labeled "1.1

AFB USCIS Sheet S502 January 2022".

This shall replace Sheet S502 in orginal drawing package.

GSA/ECH

A0002 36 1/252022 Technical

Please confirm if G60 coating is required for interior framing partitions. G40 is common coating for interior applications.

1/26/2022

G40 coating will be accepted by the government. GSA/PM

PPI (Pre-proposal Inquiries) cut-off is Friday, January 28, 2022 at 2:00 PM PST. PPIs received later than the designated cut-off will may or may not be responded.

1PPI Log for Amd 02.xlsx.pdf
PPI Log
Key
2PPI Log for Amd 02.xlsx.pdf
PPI Log
Key
3PPI Log for Amd 02.xlsx.pdf
PPI Log
Key
topmostSubform[0]:
Page1[0]:
Code[0]: 10PQCB2
Copies[0]: 1
CheckBox9[0]: 1
Code[2]: 10PQCB2
NameandTitleOfficer[0]: Rebecca Graham, Contracting Officer
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 3
AmendmentNo[0]: 0002
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: Acquisition Management Division

Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ10PCPB-22-0003
Dated9B[0]: 12/22/2021
C13[0]:
Description[0]: The purpose of this amendment is to 1) Extend RFP Closing date and time from Feb 8, 2022 at 2:00 PM PST to Feb 15, 2022 at 2:00 PM PST, 2) Extend PPI Cut-Off Date from Jan 21, 2022 at 2:00 PM PST to Jan 28, 2022 at 2:00 PM PST, 3) Provide an updated Statement of Work Rev 2 to address the Question #29 in the PPI Log, 4) Provide two documents titled 2.2 Spec 087100 Door Hardware and 088700 Window Films, and 15 AFB USCIS Sheet S502 January 2022, and 5) Provide an updated PPI Log as of January 27,...

[See Description of Modification Continuation Page]

NotExtended[0]: Off
Code[1]:
AmendmentNo[1]: 47PL0122R0004
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 1/27/2022
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: 1
D13[0]:
IssuedBy[0]: Acquisition Management Division

Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA NameandTitleSigner[0]: