Example Cost Breakdown.docx

DOCX document 22 KB Posted

Attached to
Replace Air Conditioner-Medical
Solicitation number
15B41520Q00000014
Issued by

View the file

Other files

File Type Posted
Pre-Bid Site Visit Meeting AC Medical.pdf PDF
Instructions to Offerors 15B41520Q00000014.pdf PDF
RFQ 15B41520Q00000014.pdf PDF
Contractor Residency Cert.pdf PDF
Medical AC SOW.pdf PDF
Wage Determination.pdf PDF
BP_A0660 Criminal History Check.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COST SUMMARY SPREADSHEETS

In accordance with Federal Acquisition Regulation (FAR) 15.4 the objective of proposal analysis is to ensure the final agreed to price is fair and reasonable. The complexity and magnitude of each acquisition determines the level of analysis required, thus cost analysis may be used to evaluate cost realism and the reasonableness of individual cost elements.

Your proposal must be accompanied by the attached documents as applicable:

A. The first document is for your firm as the prime contractor. This breakdown is only for the work the prime will perform with its own forces (i.e., without subcontractors).

B. The second document is for subcontractor work only. This document should be completed for each subcontractor.

C. The third document is the Final Cost Summary. This will include all charges from you as the prime and all subcontractors. All numbers must coincide with the previous documents monetarily.

A few notes:

*You may add additional lines if needed.

*Ensure you include your proposed percentages (%) in the lower blocks

PRIME CONTRACTOR COST SUMMARY

SOLICITATION NUMBER:

RFPP04081700001

PROJECT TITLE:

Repair Powerhouse Roof

#
DESCRIPTION
UOM

(hours/feet/each, etc.)

QTY
LABOR $

PER HOUR

EQUIPMENT $

PER UNIT

MATERIALS $

PER UNIT

LINE ITEM TOTALS $

[insert labor position]
[hours]
[#]
[$]
-
-
$

[insert equipment]

[#]
-
[$]
-
$

[insert material]

[#]
-
-
[$]
$
NOTE: Profit is only charged by either the Prime or Subcontractor(s) respectively for the actual segment(s) of the work they complete with their own forces. In other words, the Prime may include profit on the work it performs by itself (without subcontractors) and the Subcontractor(s) may include profit on the work they perform themselves (without lower tier subcontractors).
SUBTOTAL:
$
OVERHEAD (0%):
$
PROFIT (0%):
$
TOTAL:
$

SUBCONTRACTOR COST SUMMARY

SOLICITATION NUMBER: RFPP04081700001

SUBCONTRACTOR NAME:

PROJECT TITLE: Repair Powerhouse Roof

#
DESCRIPTION
UOM

(hours/feet/each, etc.)

QTY
LABOR $

PER HOUR

EQUIPMENT $

PER UNIT

MATERIALS $

PER UNIT

LINE ITEM TOTALS $

[insert labor position]
[hours]
[#]
[$]
-
-
$
[insert equipment]
[each]
[#]
-
[$]
-
$
[insert material]
[each/feet/etc.]
[#]
-
-
[$]
$
NOTE: Profit is only charged by either the Prime or Subcontractor(s) respectively for the actual segment(s) of the work they complete with their own forces. In other words, the Prime may include profit on the work it performs by itself (without subcontractors) and the Subcontractor(s) may include profit on the work they perform themselves (without lower tier subcontractors).
SUBTOTAL:
$
OVERHEAD (0%):
$
PROFIT (0%):
$
TOTAL:
$

FINAL COST SUMMARY

SOLICITATION NUMBER: RFPP04081700001

PROJECT TITLE: Repair Powerhouse Roof

INDIVIDUAL TOTALS $

A1
SUBCONTRACTOR:

(COMPANY NAME HERE)

A2
SUBCONTRACTOR:

(COMPANY NAME HERE)

A3
SUBCONTRACTOR:

(COMPANY NAME HERE)

B

SUBTOTAL (A1+A2+A3):
$
C
PRIME CONTRACTOR:

(TYPE NAME HERE)

D

SUBTOTAL (B+C):
$

E

INSURANCE (0% of D)
$

F

SUBTOTAL (D+E)
$

G

BOND (0% of F):
$
GRAND TOTAL (F+G):
$

PLEASE COMPLETE THE FOLLOWING:

COLLECTIVE COST ANALYSIS SUMMARY

MATERIAL S

LABOR

EQUIPMENT

INDIRECT EXPENSES – Prime (Overhead, Profit)

INDIRECT EXPENSES – Subcontractor(s) (Overhead & Profit)

SUBTOTAL COST

GENERAL AND ADMINISTRATIVE

(Bond, Insurance)

NET TOTAL

ENSURE YOU COMPLETE ALL BLOCKS TO INCLUDE SOLICITATION NUMBER AND PROJECT TITLE.