Amendment_0007_Page_2.docx

DOCX document 18 KB Posted

Attached to
Edith Green Wendell Wyatt O&M Services
Solicitation number
EQ10PAA-1-18-0003-EGWW
Issued by

About this file

Page 2 of Amendment 0007

View the file

Other files

File Type Posted
SF30-16b_AM09.pdf PDF
Amendment_clarifying_submittals_AM09.docx DOCX document
SF30-16b1.pdf PDF
SF30-16b1.pdf PDF
Pre-Proposal_Agenda_-_EGWW_O&M.docx DOCX document
Site_Visit_Sign_in_Sheets1.docx DOCX document
Q&A.docx DOCX document
SF_30_-_EQ10PMAA-1-18-0003_Amendment_0006.pdf PDF
SF_30_-_EQ10PMAA-1-18-0003_Amendment_0003.pdf PDF
AM0003_Pg_2.docx DOCX document
SF_30_-_EQ10PMAA-1-18-0003_Amendment_0002.pdf PDF
Section_B_-_Services,_Ordering_and_Prices.pdf PDF
EQ10PMAA-1-18-0003_Amendment_0001.pdf PDF
EGWW_O&M_Section_J_-_Attachments.zip ZIP file
Combined_Synopsis-Solicitation_EGWW_O&M_-_Final_4.3.2018.pdf PDF
EGWW_O&M_-_Section_J_(Exhibits).zip ZIP file
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0007

EQ10PMAA-1-18-0003

The purpose of this amendment is to:

1. Note, due to system issues Amendments were miss numbered and corrected through Amendment 0006.

2. Question 63 is hereby answered by the revision of C.40.2, C.40.3, C.40.4 C.40.2 Non-reimbursable Repairs A non-reimbursable repair is a single repair costing under $ 2,500 for repair parts and materials only without any Contractor labor cost factored in. That amount may include approved subcontracting costs. The cost of consumable parts and materials shall not be calculated as part of the Contractor’s repair parts and material costs. Non-reimbursable repairs where parts and materials are valued at or below $2500 are entirely the Contractor’s responsibility with no reimbursement from the Government.

C.40.3 Shared Liability Repairs A shared liability repair is a single incident valued over the non-reimbursable threshold amount of $2,500 set in C.40.2, and cannot be an accumulation of various repairs (bundling). All shared liability repairs must be approved by the CO or their designee. The Contractor’s limit on shared liability repairs is set at $20,000 per year or 8 repairs at or above $2500.

Once the threshold has been reached, i.e. there have been 8 repairs valued at $2500 or above, then the repair cost is reimbursable to the Contractor, once approved by the CO or designee. Once the annual repair threshold of shared liability repairs has been reached, all repairs greater than $2500 are reimbursable in total by GSA.

Shared Liability Example A repair is identified and estimated by the Contractor to cost $2,700 for repair parts and materials only. The annual non-reimbursable repair threshold amount of $20,000 has not been reached. The CO or their designee will verify and approve both the need for the repair and the $2,700.00 estimated cost of repair parts and materials. In this example, the Contractor will pay the first $2,500.00 of the repair (the non-reimbursable repair threshold) and GSA will pay the remaining $200.00. This is then classified as a shared liability repair.

Total estimated approved cost for repair$2,700.00
Contractor’s shared liability is to be subtracted-$ 2,500.00

Total to be paid by GSA to the Contractor for the repair $ 200.00

The required completion date for reimbursable repairs shall be established when the CO or their designee approves the work, as mutually agreed upon by the CO or their designee and the Contractor. The Contractor shall attempt to complete work as promptly as possible. Immediately upon identification of a reimbursable repair, the Contractor shall create a work order in the NCMMS and defer it by putting it in a “hold” status.

C.40.4 Miscellaneous Work The Contractor shall provide 16 hours for miscellaneous work hours and up to $75 for parts and supplies per calendar month (hours and dollar amounts are not cumulative to succeeding months. The value spent on all miscellaneous work will be reported in the Monthly Progress Report and managed by the Contractor and the CO and/or their designee. No labor cost shall be included.

The Contractor shall furnish the labor, tools and consumable materials as necessary to perform the work. Miscellaneous work may be required for work that makes use of any of the trades normally employed in performing operations and maintenance services under this Contract and does not include tasks associated with the performance of services covered under the scope of this Contract. The Contractor shall create and process NCMMS work orders for all miscellaneous work, and accurately record hours of labor expended and costs incurred in the NCMMS.

3. The solicitation requires bidders to submit Checklist of Items to Submit (Attachment 16). However, Attachment 16 is a List of Attachments. Are we to submit this, or is there another document that is a checklist?

a. This checklist is no longer required; vendors should be cautioned to ensure all the required submittals are sent with their proposals.

4. Included in the attachments is the GSA 527. However, there is no requirement in the solicitation that this form be submitted with our offer. Are we to submit it?

a. This document will only be required for submittal if necessary based on potential award.

5. All the pricing sheets (attachments 5-9) are PDFs. To expedite the solicitation and evaluation processes, would the government consider issuing these as Excel sheets?

a. Vendors may convert these sheets back to excel or word, GSA will not be providing them, submittal may be made in the form of excel or PDF

6. Past Performance Volume 4 in both Section L and M is hereby renumbered to Volume IV PAST PERFORMANCE Factor 3 - Technical Factors Sub factor 1 – EGWW Past Performance Questionnaire (PPQ) Attachment 14 (Vol. IV) Past Performance Questionnaire (PPQ) – Offerors are encouraged to reach out to their current and past customer(s) and arrange to submit PPQ directly to the Government using Attachment 14. Recent is defined as within the last three (3) years, and relevant is defined as similar in scope, complexity and building type.

Sub factor 2 – Contractor Supplied Experience Questionnaire Attachment 15 (Vol. IV) Contractor-Supplied experience – Offerors shall provide up to three (3) of their best experiences that are recent and relevant on Attachment 15. Recent is defined as within the last three (3) years, and relevant is similar in scope, complexity and building type.

Past Termination explanation – If needed

7. The Government will retrieve recent and relevant CPARS and PPIRS records for all Offerors. Please do not submit CPARS and PPIRS records.