eMMA Addendum No. 1 final.pdf
PDF 37 MB Posted
- Attached to
- Concourse AB Ticket Counter Expansion at BWI
- Solicitation number
- BPM054607
- Issued by
- Maryland
About this file
This is an addendum to a construction contract for the Maryland Aviation Administration related to the Concourse AB Ticket Counter Expansion project at Baltimore/Washington International Airport. The addendum modifies the original contract terms for the conversion of the former DuClaw Brewing Company restaurant space within Terminal A's ticketing hall into additional check-in counters, belt conveyors, and Airport Ticket Office space. The document provides clarifications and revisions to the contractual obligations, technical specifications, and performance requirements established in the base contract.
The addendum addresses modifications to contract conditions, including changes to work scope, schedule adjustments, and clarifications regarding contractor responsibilities and airport operational requirements. It establishes amended timelines and procedures for project completion while maintaining coordination with ongoing airport terminal operations. The document specifies updated technical requirements and compliance standards applicable to the renovation work, ensuring the expanded ticketing facilities meet current airport operational standards and passenger processing needs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Concourse AB Ticket Counter Expansion_V1.pdf | ||
| MAA-CO-26-011 Site Inspection RSVP.docx | DOCX document | |
| Concourse AB Ticket Counter Expansion_V2.pdf | ||
| MAA-CO-26-011_ Bid Form locked.xlsx | XLSX spreadsheet | |
| eMMA Addendum No. 2.pdf | ||
| MAA-CO-26-011 Pre-Bid RSVP.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .